ML20247B060
| ML20247B060 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 05/15/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| References | |
| NUDOCS 8905230382 | |
| Download: ML20247B060 (2) | |
Text
,
3 > *l MAY I 51989 In Reply Refer To:
Docket:
50-267 Public Service-Company of Colorado ATTN:
Robert O. Williams, Jr., Senior Vice President, Nuclear Operations P.O. Box 840 Denver, Colorado 80201-0840 Gentlemen:
SUBJECT:
LICENSED OPERATOR REQUALIFICATION EXAMINATIONS
~As noted in your March 27, 1989 Letter P-89106, the NRC does not plan to administer requalification examinations unless necessary to renew operator 4
licenses based on defueling needs at Fort St. Vrain (FSV) or utility operating performance dictates such a need. However, your program must continue to maintain the ability of licensed personnel to adequately protect the health and safety of the public, and NRC has a responsibility to continue to assure that such is accomplished.
Therefore, we request that you keep us informed of the changes in scope and content in the FSV licensed senior reactor operator, reactor operator, and fuel handler job task analysis and corresponding requalification training program. This can be accomplished by transmitting the changes in job task analysis, training program content, and changes in lesson plans as they are finalized. The NRC will assess the implementation of this nodified program at a later date, most likely through auditing the resulting program.
If you have any questions or comments, please feel free to contact Mr. John L. Pellet at (817) 860-8159.
Sincerely, Original SJgned By L. J. Calbn L. J. Callan, Director Division of Reactor Projects cc:
Fort St. Vrain Nuclear Station ATTN:
C. Fuller, Manager, Nuclear Production Division
.16805 WCR 191 Platteville, Colorado 80651
- RIV:C:0LS
- NRR/LOLB D:
S 1
D:DR l
JLPellet/lb KPerkins JLMilhoa LJCa n
/ /89
/ /89
$/g89 7/((/89
- Previously concurred h
8905230382 890515 a
PDR ADOCK 0500026'7 I
V PDC
D x
fc q
7:,
! ublic Service Company of Colorado P
~
-Fort St. Vrain Nuclear' Station.
ATTN:
P. Tomlinson,-Manager
' t. -
... ' Quality Assurance. Division e
.16805 WCR 191-L '.
Platteville, Colorado 80651-L i Colorado Public Utilities Commission' y"
ATTN:l Ra1ph Teague, P.E.
j.
1580< Logan Street. OLi~
. Denver,. Colorado -80203-
'. Colorado Radiation Co'ntrol Program Director bec:
- bec to DMB (IE42)
+
bcci distrib. by RIV:
RRI R. D.. Martin, RA SectionChisf(DRP/B)-
Project Engineer (DRP/B)-
~RPB-DRSS LFMB-Facilities Section MIS System.
J. L. Pellet'-
K. Heitner, NRR Project Manager (MS:
13-D-18)
RIV File DRS J. L. Pellet Reading. File'
^DRP K.-Perkins,NRR(MS:
10-D-18)-
i h
.I