March 21, 1989 Docket No. 50-341 Mr. B. Ralph Sylvia Group Vice President - Nuclear Operations Detroit Edison Company 6400 N. Dixie Highway Newport, Michigan' 48166

Dear Mr. Sylvia:

SUBJECT:

FERMI-2 NUCLEAR POWER PLANT, REQUEST FOR ADDITIONAL INFORMATION ON FERMI-2 0FFSITE DOSE CALCULATION MANUAL (ODCM), REVISION 2 4

We have-received your Semiannual Radioactive Effluent Release Report for

. Fermi-2 covering the' period from July 1 through December 31, 1988. As. Appendix B'to this report, you submitted a completely revised Fermi-2 Offsite. Dose-Calculation Manual-(ODCM), Revision 2.

Our survey of the original pages =of Appendix B submitted to the NRC Document Control Desk showed that portions of

'the ODCM were illegible. Copies distributed to the regions and the.Public Document Room (PDR) were thus also illegible.

This is not acceptable. We request that Detroit Edison Company respond to tb enclosed Request for Additional Information (RAI), and submit a complete, legible copy of your current ODCM, for ^ availability on the record for use-at NRC Headquarters and the regions, as well as the PDR. There is no need at this time for the licensee to resubmit the entire Semia'nnual Radioactive

+

Effluent Release Report.

Thank you for your assistance.

Sincerely, bM Lyn Kelly, Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects

Enclosure:

1 As stated 1

DISTRIBUTION IDocket4 File?

NRC T Local PDRs Eo GHolahan

,t gg MVirgilio no PShuttleworth y

I 28 LKelly l

20 OGC h

a EJordan

@8 BGrimes 0C ACRS (10)

I [

PD31 Gray File l

S$'

g3,

[

I MQEHiS!Mh

$bhggg

{

D31:Dy 3/\\/89 {

3/p/89 3/6 9' A

[

~

i i

+

l.

i'/

o UNITED STATES 3' " ' ![

i NUCLEAR REGULATORY COMMISSION I'

h WASHINGTON, D. C. 20566

/

March 21, 1989 tDocket No. 50-341 Mr. B. Ralph Sylvia-

- Group Vice President - Nuclear Operations j

Detroit Edison Company-1 6400 N. Dixie Highway Newport, Michigan 48I66-i

Dear Mr. Sylvia:

4 q

SUBJECT:

FERMI-2 NUCLEAR' POWER PLANT, REQUEST FOR ADDITIONAL.INFORMATION ON:

FERMI-2 0FFSITE DOSE CALCULATION MANUAL (ODCM), REVISION 2 I

'We have received your Semiannual Radioactive Effluent Release Report for Fermi-2 covering the period from July 1-through Decerber 31, 1988. As Appendix l

B to this report, you submitted a completely revised Fermi-2 Offsite Dose-1

. Calculation Manual-(0DCM), Revision 2. -Our survey of the original pages of Appendix B submitted to the NRC Document Control Desk showed that portions of-the ODCM were illegible. Copies distributed to the regions and the Public Document Room (PDR) were thus also illegible.

This is not acceptable. We request that Detroit Edison Company respond to the i

enclosed Request for Additional Information (RAI), and submit a complete, legible copy of your current ODCM, for availability on the record for use at NRC Headquarters and the regions, as well as the PDR. There is no need at'-

this time for the licensee to resubmit the entire Semiannual Radioactive Effluent Release Report.

o j

Thank-you.for your assistance.

Sincerely, l

Y LynY Kelly, Pro:ect Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V 8 Speci'al Projects

Enclosure:

As stated s

t

'l

-j a

v.

Mr. ' B. Ralph' Sylvia Detroit Edison Company Fermi-2 Facility j

2 CC:

Mr.- Ronald C. Callen Ms. Lynn Goodman Adv. Planning Review Section Supervisor - Licensing Michigan Public Service Comission Detroit Edison Company 6545 Mercantile Way' Fermi Unit 2 l

P. O. Box 30221 6400 North Dixie Highway Lansing, Michigan 48909 Newport, Michigan 48166 1

John Flynn, Esq.

j Senior Attorney Detroit Edison Company 1

2000 Second Avenue I

Detroit, Michigan '48226 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan' 48909 Mr. Thomas Randazzo Director Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U.S', Nuclear Regulatory Commission Resident Inspector's Office 6450 W.. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

l l

l I

4-l i

ENCLOSURE REQUESTFORADDITIONALINFORMATION(RAI)

DETROIT EDISON COMPANY-FERMI-2 NUCLEAR POWER PLANT REVISED.0FFSITEDOSECALCULATIONMANUAL(ODCM) l i

i l

By letter dated March 1,-1989, Detroit. Edison Company (licensee) submitted the Semianriual Radioactive Effluent Release Report for Fermi-2 covering the perio'd from July 1,1988 through December 31, 1988. As Appendix B to this report, the licensee submitted a completely revised Fermi-2 ODCM, Revision 2, as required by Fermi-2 TS 6.14.2.a.

Our survey of the original copy of this Appendix B submitted by the licensee to i

the NRC Document Control Desk shows that a number of pages are illegible. The pages of Appendix B forwarded to NRC are a poor copy of the licensee's origi-nal. The type on all of the pages of this " original" is generally fuzzy.

In particular, however, printing on a number of the figures is unreadable and captions on some of the tables have been cut off at the top.

l This is unacceptable.

The importance of the ODCM as a stand-alone document of licensee commitments-for radiological effluents and environmental monitoring has been emphasized by -

the publication of Generic Letter 89-01. This Generic Letter dated January 31, 1989, established the mechanism for transferring the procedural details of a licensee's Radiological Effluent Technical Specifications (RETS) u

to the ODCM in fulfillment of the Commission's Policy Statement on Technical Specifications Improvements.

In view of this development it is essential that complete, legible copies of a licensee's current ODCM be available within the NRC and in the Public Document Room.

Therefore it is requested that within two weeks of receipt of this RAI the licensee provide to the NRC Document Control Desk for copying and distribution a complete, legible copy of the current Fermi-2 ODCM presently in use at the plant. Since the remaining pages of the Semiannual Report are of acceptable l

1egibility, there is no need to resubmit the entire report. This request is i

for the current Fermi-2 ODCM only.