Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247E811 + (01:57:23, 2 December 2024)
- ML20247E810 + (01:57:24, 2 December 2024)
- 05000348/LER-1989-001-01, :on 890328,fire Door 401 Declared Inoperable Because of Cracks Through Metal Around Striker Plate.On 890414,addl Fire Doors Declared Inoperable Due to Cracks. Fire Watches Established + (01:57:25, 2 December 2024)
- IR 05000352/1989016 + (01:57:26, 2 December 2024)
- ML20247E805 + (01:57:27, 2 December 2024)
- ML20247E799 + (01:57:28, 2 December 2024)
- ML20247E801 + (01:57:28, 2 December 2024)
- ML20247E796 + (01:57:35, 2 December 2024)
- 05000369/LER-1988-049, :on 881123,RHR Pump 1B Lost Suction Pressure & Operations Manually Stopped Pump to Prevent Damage.Caused by Design Deficiency Because Inadequate Sys Venting Allowed Air to Be Trapped.Personnel Vented Nd Train 1A + (01:57:37, 2 December 2024)
- PNO-I-89-078, notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan + (01:57:38, 2 December 2024)
- ML20247E792 + (01:57:38, 2 December 2024)
- ML20247E791 + (01:57:39, 2 December 2024)
- ML20247E789 + (01:57:40, 2 December 2024)
- ML20247E788 + (01:57:41, 2 December 2024)
- ML20247E786 + (01:57:42, 2 December 2024)
- ML20247E784 + (01:57:43, 2 December 2024)
- ML20247E779 + (01:57:47, 2 December 2024)
- ML20247E780 + (01:57:47, 2 December 2024)
- ML20247E777 + (01:57:48, 2 December 2024)
- 05000277/LER-1989-014-01, :on 890517,noted That Required Surveillance Test for Radwaste Bldg 116 Ft Elevation Chemical Addition & Laundry Room Smoke Detectors Overdue. Caused by Procedural Deficiency + (01:57:50, 2 December 2024)
- ML20247E775 + (01:57:51, 2 December 2024)
- ML20247E772 + (01:57:53, 2 December 2024)
- ML20247E774 + (01:57:53, 2 December 2024)
- 05000354/LER-1998-003-01, :on 980407,concurrent Inoperability of a & B CR Chillers Was Noted.Caused by Personnel Error. Performed IST Tests,Equipment Repairs,Training & Revised Procedures + (01:57:55, 2 December 2024)
- 05000260/LER-1989-026, :on 890810,diesel Generator B Declared Inoperable When Min Air Start Sys Pressure Not Met Due to Air Leak on High Pressure Head of Compressor.Caused by Failure to Reassemble Head Correctly + (01:57:57, 2 December 2024)
- ML20247E769 + (01:57:58, 2 December 2024)
- ML20247E767 + (01:57:59, 2 December 2024)
- ML20247E768 + (01:57:59, 2 December 2024)
- 05000454/LER-1998-011-01, :on 980409,integral Attachment Welds Were Not Inspected IAW ASME Code Due to Deficient ISI Program Plan. Cause of Event Unknown.Byron Site Engineering & Operation Dept Evaluated Operability Issues + (01:58:01, 2 December 2024)
- ML20247E763 + (01:58:02, 2 December 2024)
- ML20247E761 + (01:58:03, 2 December 2024)
- ML20247E762 + (01:58:03, 2 December 2024)
- ML20247E760 + (01:58:04, 2 December 2024)
- ML20247E755 + (01:58:05, 2 December 2024)
- ML20247E759 + (01:58:05, 2 December 2024)
- ML20247E754 + (01:58:06, 2 December 2024)
- ML20247E751 + (01:58:07, 2 December 2024)
- ML20247E752 + (01:58:07, 2 December 2024)
- ML20247E747 + (01:58:08, 2 December 2024)
- ML20247E750 + (01:58:08, 2 December 2024)
- 05000354/LER-1998-003, Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl + (01:58:09, 2 December 2024)
- ML20247E743 + (01:58:10, 2 December 2024)
- ML20247E744 + (01:58:10, 2 December 2024)
- ML20247E741 + (01:58:11, 2 December 2024)
- ML20247E742 + (01:58:11, 2 December 2024)
- ML20247E739 + (01:58:12, 2 December 2024)
- IR 05000440/1989018 + (01:58:13, 2 December 2024)
- ML20247E734 + (01:58:14, 2 December 2024)
- ML20247E736 + (01:58:14, 2 December 2024)
- ML20247E732 + (01:58:15, 2 December 2024)
- NRC-89-0129, Monthly Operating Rept for June 1989 for Fermi 2 + (01:58:15, 2 December 2024)