Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247K182 + (01:09:56, 2 December 2024)
- ML20247K185 + (01:09:56, 2 December 2024)
- ML20247K181 + (01:09:57, 2 December 2024)
- 05000259/LER-1998-001-03, :on 980414,standby Gas Treatment Sys HEPA Filter Testing Was Not in Compliance W/Ansi Std Requirements.Caused by Lack of Understanding of DOP Testing. Filter Testing Training Will Be Provided + (01:09:59, 2 December 2024)
- 05000339/LER-1989-004-02, :on 890502,unexpected Automatic Reactor Trip Signal Generated During Performance of ICP-FW-2-F-2486. Caused by Procedure Inadequacy.Instrument Dept Procedures Will Be Reviewed & Revised + (01:10:01, 2 December 2024)
- 0CAN048902, Forwards Certificate of Insurance for Maelu Policies 5356, TA6178,X88185 & XTA6047 + (01:10:02, 2 December 2024)
- ML20247K177 + (01:10:03, 2 December 2024)
- ML20247K176 + (01:10:03, 2 December 2024)
- ML20247K168 + (01:10:04, 2 December 2024)
- ML20247K171 + (01:10:04, 2 December 2024)
- ML20247K164 + (01:10:05, 2 December 2024)
- 05000341/LER-1989-012, :on 890603,various Div I Isolations/Actuations Experienced During one-time Surveillance Procedure to Allow Installation of Star Lugs.Caused by Inadequate Technical Review of Temporary Procedure Change + (01:10:07, 2 December 2024)
- PY-CEI-NRR-0990, Forwards LERs 89-005,89-006 & 89-007 for Perry Unit 1 + (01:10:08, 2 December 2024)
- NG-98-0893, Forwards Rev 0 to Cycle 16 COLR, IAW Requirements of TS Section 6.11.2.d.Prepared Rept Using NRC-approved Methods & Confirms That All Applicable Limits of SAR Have Been Met + (01:10:08, 2 December 2024)
- ML20247K157 + (01:10:11, 2 December 2024)
- ML20247K156 + (01:10:12, 2 December 2024)
- ML20247K154 + (01:10:13, 2 December 2024)
- SNRC-1596, Requests Exemption from 10CFR50.54(w) Re Onsite Property Damage Insurance Requirements + (01:10:14, 2 December 2024)
- 05000482/LER-1989-011, :on 890623,both Class 1E Air Conditioning Units SGK05A & SGK05B Were Inoperable.Caused by Loose Wire Disconnected from Lug on pump-down Switch.Wire Recrimped & Units Returned to Svc.Personnel Reinstructed + (01:10:16, 2 December 2024)
- 0CAN059805, Monthly Operating Repts for Apr 1998 for Ano,Units 1 & 2 + (01:10:17, 2 December 2024)
- ML20247K151 + (01:10:17, 2 December 2024)
- ML20247K144 + (01:10:20, 2 December 2024)
- ML20247K143 + (01:10:20, 2 December 2024)
- IR 05000369/1989029 + (01:10:22, 2 December 2024)
- ML20247K139 + (01:10:22, 2 December 2024)
- ML20247K138 + (01:10:23, 2 December 2024)
- 05000483/LER-1989-002, :on 890228 & 0303,unplanned ESF Actuations Occurred.Caused by Shield Breakage of Coaxial Cable & Technician Inadvertent Push of ESF Actuation Push Button, Respectively.Cable Replaced + (01:10:25, 2 December 2024)
- ML20247K133 + (01:10:28, 2 December 2024)
- ML20247K130 + (01:10:29, 2 December 2024)
- ML20247K129 + (01:10:30, 2 December 2024)
- ML20247K128 + (01:10:30, 2 December 2024)
- ML20247K127 + (01:10:31, 2 December 2024)
- IR 05000271/1989004 + (01:10:35, 2 December 2024)
- ML20247K125 + (01:10:35, 2 December 2024)
- 05000416/LER-1989-012, :on 890814,main Condenser Expansion Joint Failed Causing Condenser Vacuum to Decrease & Reactor Scram. Caused by Rupture of Section of Condenser Expansion Belt. RCIC Sys Manually Initiated + (01:10:38, 2 December 2024)
- ML20247K119 + (01:10:41, 2 December 2024)
- ML20247K117 + (01:10:42, 2 December 2024)
- ML20247K116 + (01:10:42, 2 December 2024)
- ML20247K115 + (01:10:43, 2 December 2024)
- ML20247K113 + (01:10:44, 2 December 2024)
- 05000324/LER-1989-006-03, :on 890424,HPCI High Steam Flow Isolation Instrument E41-PDT-N005 Failed in Upscale Tripped Position Causing HPCI Steam Supply Inboard Isolation Valve to Isolate.Caused by Failed Sensor Module + (01:10:45, 2 December 2024)
- ML20247K110 + (01:10:46, 2 December 2024)
- ML20247K108 + (01:10:47, 2 December 2024)
- 0CAN078919, Requests Withdrawal of Proposed Tech Specs Re Visual Insp Periods for Inaccessible Snubbers Submitted in s. Unplanned Outages & Scheduled Midcycle Outage for Unit 1 Eliminated Need for Changes + (01:10:48, 2 December 2024)
- ML20247K101 + (01:10:49, 2 December 2024)
- ML20247K097 + (01:10:50, 2 December 2024)
- ML20247K098 + (01:10:50, 2 December 2024)
- PNO-II-89-063A, on 890906,Augmented Insp Team Dispatched to Investigate Overpressurization of Containment Spray Sys & Resultant Spill of Contaminated Water Into Auxiliary Bldg. Problems Existed W/Operability Test Procedure + (01:10:51, 2 December 2024)
- ML20247K096 + (01:10:51, 2 December 2024)
- PNO-II-89-064, on 890907,plant Shut Down for More than 48 H to Determine Cause of Out of Spec Secondary Chemistry.Msiv a Test Circuitry Discovered Energized & Valve Declared Inoperable on 890908.Caused by Water Hammer in Flush Line + (01:10:52, 2 December 2024)
- ML20247K090 + (01:10:53, 2 December 2024)