Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247M614 + (00:37:21, 2 December 2024)
- ML20247M613 + (00:37:21, 2 December 2024)
- ML20247M612 + (00:37:22, 2 December 2024)
- ML20247M611 + (00:37:24, 2 December 2024)
- ML20247M609 + (00:37:26, 2 December 2024)
- ML20247M608 + (00:37:27, 2 December 2024)
- TXX-8927, Supplemental Deficiency Rept CP-87-129 Re Containment Spray Sys Ph.Intially Reported on 880106.Results of Completed Reevaluation Summarized & Basis for Reversing Previous Conclusion of Reportability Under 10CFR50.55(e) Provided + (00:37:28, 2 December 2024)
- ML20247M605 + (00:37:29, 2 December 2024)
- IR 05000344/1989008 + (00:37:30, 2 December 2024)
- 05000213/LER-1989-008, :on 890425,discrepancy Discovered in Facility Design Basis Large Break LOCA Analysis.Caused by Use of non-LOCA Model Vol in LOCA Model Applications.Administrative Control to Reduce Tech Specs Limit Implemented + (00:37:35, 2 December 2024)
- IR 05000458/1998006 + (00:37:37, 2 December 2024)
- ML20247M599 + (00:37:39, 2 December 2024)
- IR 05000289/1989001 + (00:37:44, 2 December 2024)
- ML20247M595 + (00:37:45, 2 December 2024)
- ML20247M593 + (00:37:46, 2 December 2024)
- ML20247M592 + (00:37:46, 2 December 2024)
- ML20247M591 + (00:37:47, 2 December 2024)
- 05000265/LER-1988-007, :on 880413,determined That Measured Combined Leakage Rate from Penetrations & Valves Exceeded Tech Specs Limit.Caused by Normal Wear.Repairs & Replacements Completed as Necessary + (00:37:49, 2 December 2024)
- ML20247M587 + (00:37:50, 2 December 2024)
- ML20247M585 + (00:37:51, 2 December 2024)
- 05000277/LER-1989-018-01, :on 890818,personnel Failed to Place APRM Rod Block Settings in Tripped Condition within 1 H of Determining Nonconservative Settings.Total Core Flow Calibr & APRM Sys Calibr Revised Re Personnel Actions + (00:37:52, 2 December 2024)
- ML20247M582 + (00:37:53, 2 December 2024)
- 05000369/LER-1989-015-02, :on 890721,determined That Control Room Ventilation Sys Did Not Meet Required Tech Spec Positive Pressure of at Least +0.125-inches Water Gauge Relative to Outside Atmosphere.Caused by Design Oversight + (00:37:55, 2 December 2024)
- ML20247M580 + (00:37:56, 2 December 2024)
- ML20247M578 + (00:37:57, 2 December 2024)
- ML20247M571 + (00:37:58, 2 December 2024)
- ML20247M568 + (00:37:59, 2 December 2024)
- ML20247M567 + (00:37:59, 2 December 2024)
- ML20247M566 + (00:38:00, 2 December 2024)
- BECO-89-109, Forwards Summary of Changes,Tests & Experiments for 880122-890121 + (00:38:01, 2 December 2024)
- ML20247M565 + (00:38:01, 2 December 2024)
- ML20247M560 + (00:38:02, 2 December 2024)
- ML20247M557 + (00:38:03, 2 December 2024)
- 05000395/LER-1989-009, :on 890428,discrepancy Noted Re Vol of Stored Diesel Fuel Oil in Current Design Basis Calculation & Tech Spec Sections Re Ac Sources.Caused by Personnel Error.Tech Spec Fuel Oil Vol Increased to 47,100 Gallons + (00:38:05, 2 December 2024)
- ML20247M554 + (00:38:09, 2 December 2024)
- LD-89-104, Application for Amend to License SNM-1067,revising Windsor Nuclear Fuel Mfg Facility Organization.Tabulation of Affected Pages & Respective Rev Numbers Encl + (00:38:11, 2 December 2024)
- PY-CEI-NRR-1047, Responds to NRC Re Violations Noted in Insp Rept 50-440/89-16.Corrective Actions:Health Physics Personnel Involved Made Aware of Errors & Counseled Re Responsibilities & Health Physics Instruction Modified + (00:38:12, 2 December 2024)
- ML20247M545 + (00:38:15, 2 December 2024)
- TXX-8926, Supplemental Deficiency Rept CP-87-35 Re Raychem Motor Connection Kits.Initially Reported on 870715.Unit 1 Splices Insulated W/Okonite Jacketing & Insulation Tape.Corrective Actions for Unit 2 Will Be Completed Prior to Fuel Load + (00:38:16, 2 December 2024)
- ML20247M540 + (00:38:17, 2 December 2024)
- ML20247M541 + (00:38:17, 2 December 2024)
- ML20247M537 + (00:38:18, 2 December 2024)
- ML20247M538 + (00:38:18, 2 December 2024)
- ML20247M535 + (00:38:19, 2 December 2024)
- ML20247M532 + (00:38:19, 2 December 2024)
- ML20247M531 + (00:38:20, 2 December 2024)
- RBG-30962, Special Rept:On 890426,valid Failure of Div III HPCS Diesel Generator Occurred.Caused by Div III Diesel Generator Not Satisfying Tech Specs Surveillance Requirement.Mod Request Initiated to Revise Time Delay Setting + (00:38:21, 2 December 2024)
- ML20247M529 + (00:38:21, 2 December 2024)
- ML20247M524 + (00:38:22, 2 December 2024)
- ML20247M523 + (00:38:23, 2 December 2024)
- ML20247M520 + (00:38:23, 2 December 2024)