Forwards Calvert Cliffs Nuclear Power Station Performance Improvement Plan Implementation Program
ML20247M567
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/31/1989
From: Mcgowan G
BALTIMORE GAS & ELECTRIC CO.
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
Shared Package
ML20247M572 List:
References
NUDOCS 8908020150
Download: ML20247M567 (2)


Text

y .

B A LTIMORE GAS AND ELECTRIC CHARLES CENTER P O. BOX 1t.75 BALTIMORE, MARYLAND 21203 Gromot V. McGowAN c-4 ~ .~e, m u..: July 31, 1989 U.S. Nuclear Regalatory Ca:rission Washington, D.C. 20555 l ATIDCION: Mr. James M. Taylor l Acting Executive Director for Options SUBTECI: Calvert.L iffs Nuclear Power Plant Unit Nos.1 and 2; Docket Nos. 50-317 ard 50-318 Performance Ircrevement Plan Irelementation Procram tetre d CE: (a) letter from Mr. E.A. Crooke to Mr. V. Stello, Jr. ,

Performance Improvement Plan, dated April 7,1989 (b) Intter fram Mr. G.C. Creel to Ibcument Control Desk, Response to Inspection Report Nos. 50-317/89-200; 50-318/89-200 (Special Team Inspection), dated June 21, 1989 Gentlemen:

t Enclosed is Baltincre Gas & Electric Canpany's Performance

( Improvement Plan (PIP) Implementation Program. On April 7, 1989, we sent fomer Executive Director for Options, Mr. Victor Stello, Jr. , a report of our PIP (Reference a). That report outlined the urderlying root causes associated with Calvert Cliffs' decline in performance aM chmued necessary corrective actions. At the tire, we pledged to develop ard implenent detailed plans supporting those corrective actions that reqaired a&iitional work. Ihe enclosed report provides that information aM atiresses the long-term actions identified in our June 21, 1989, response to your Special Team Inspection Report (Reference b).

This PIP Irplerentation Program provides a souM strategy for returning Calvert Cliffs to the ranks of the top perforring plants in the nuclear irdustry. I want to e:qhasize how essential this goal is to Baltircre Gas & Electric Ccrpany. In this regard, Mr. Christian H. Poirdexter has been appointed Vice Chairran, effective August 1, 1989. His prirary responsibility is to be the senior cc:porate executive responsible for the Calvert Cliffs Nuclear Power Plant, and he will report directly to re. Mr. Georige C. Creel, Vice President - Nuclear Energy, will contirrae as the executive in charge of the plant and d1 its support and will report dirm:tly to Mr. Poirdexter.

Together, we will ensure that the PIP receives high-level attention ard adegaate resources.

8908020150 990733 g ,

f.DR ADOCK 05000317 PDC il\ \

l

\

I Mr. James M. Taylor July 31, 1989 Page 2 i

Mr. Poirdexter, along with Mr. Creel and his staff, will meet with your Calvert Cliffs Aesacen=nt Panel on August 4,1989, to provide additional information regarding the PIP and the Implementation PW1.cuu. We welcome such meetings to keep you and your staff informed of our plans tad sw1.ess.

Sincerely, m

/ .

ma4 of the Board

/

Enclosure cc: M'mant control Desk, NRC I D.A. Bnme, Esqaire J.E. Silberg, Esquire W.T. Russell, NRC R.A. Capra,Imc I S.A. McNeil, NRC V.L. Pritchett, NRC A.J. Meniiala (10 copies)