ML20247M593

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1989 for Wolf Creek Generating Station & Revised Rept for May 1989,reflecting Correction to Duration to Indicate Zero Shutdown Hours
ML20247M593
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/11/1989
From: Bailey J
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247M598 List:
References
NO-89-0165, NO-89-165, NUDOCS 8909260002
Download: ML20247M593 (1)


Text

- _ _ _ - _ _ - _ _ - _ _ _ - _ - - _ _ _ _ _ - -

e

(

~

LFCREEK W@ NUCLEAR OPERATING COR John A. Bailey v c. a o.nt Nuch Owams September jj, j989 NO 89-0165 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Station F1-137 Washington, D. C.

20555

Subject:

Docket No. 50-482: August 1989 Monthly Operating Report Gentlemen: to this letter is the August, 1989, Monthly Operating Report for Wolf Creek Generating Station.

This submittal is. being made in accordance with the requirements of Technical Specification 6.9.1.8.

. provides a revised page of the May, 1989 Monthly Operating Report.

This revised page reflects a correction to the Duration (hours) to indicate zero shutdown duration hours rather than the duration of the load reduction.

Additionally, the unit shutdown sequential number has been corrected.

Changes to this page have been highlighted with revision bars.

Very truly yours,

^

M John A. Bailey Vice President Nuclear Operations JAB /aem Attachments (2) cca B. L. Bartlett (NRC), w/a E. J. Holler (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a 9xrg eOOO: S FJ.: e !.

pp vaDO: &

0 a.>. 7:.

g es j

P.O. Box 411/ Burhngton, KS 66839 / Phone: (316) 364-8831 q

_ - - - - -