Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044G926 + (17:42:17, 19 December 2024)
- ML20044G925 + (17:42:18, 19 December 2024)
- TAC:M83855 + (17:42:18, 19 December 2024)
- ML20044G923 + (17:42:19, 19 December 2024)
- ML20044G921 + (17:42:20, 19 December 2024)
- ML20044G920 + (17:42:21, 19 December 2024)
- ML20044G919 + (17:42:22, 19 December 2024)
- ML20044G918 + (17:42:23, 19 December 2024)
- ML20044G916 + (17:42:24, 19 December 2024)
- ML20044G915 + (17:42:25, 19 December 2024)
- ML20044G913 + (17:42:25, 19 December 2024)
- ML20044G892 + (17:42:29, 19 December 2024)
- ML20044G888 + (17:42:33, 19 December 2024)
- TAC:L21681 + (17:42:34, 19 December 2024)
- ML20044G887 + (17:42:35, 19 December 2024)
- IR 05000313/1993004 + (17:43:03, 19 December 2024)
- ML20044G880 + (17:43:05, 19 December 2024)
- ML20044G879 + (17:43:05, 19 December 2024)
- ML20044G877 + (17:43:06, 19 December 2024)
- B14491, Proposed TS Figure 3.6.1, P-T Curves for Pressure Tests & Figure 3.6.2, P-T Curves for Non-Nuclear Heatup/Cooldown for 32 Efpys + (17:43:08, 19 December 2024)
- ML20044G873 + (17:43:09, 19 December 2024)
- ML20044G869 + (17:43:10, 19 December 2024)
- IR 05000313/1993022 + (17:43:12, 19 December 2024)
- ML20044G863 + (17:43:13, 19 December 2024)
- BECO-93-070, Forwards Rev 10A to Pilgrim Nuclear Power Station COLR, Cycle 10 + (17:43:14, 19 December 2024)
- ML20044G858 + (17:43:17, 19 December 2024)
- ML20044G851 + (17:43:19, 19 December 2024)
- ML20044G835 + (17:43:21, 19 December 2024)
- ML20044G833 + (17:43:22, 19 December 2024)
- ML20044G832 + (17:43:22, 19 December 2024)
- 05000245/LER-1993-004-01, :on 930430,1-inch Instrument Lines from Main Steam Line Flow Venturis Found to Be Missing Pipe Restraints in Several Locations.Possibly Caused by Improper Maint &/Or Vibration.Missing Restraints Reinstalled + (17:43:24, 19 December 2024)
- ML20044G829 + (17:43:26, 19 December 2024)
- ML20044G828 + (17:43:27, 19 December 2024)
- ML20044G826 + (17:43:29, 19 December 2024)
- IR 05000285/1993003 + (17:43:31, 19 December 2024)
- RBG-38-312, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/92-35 on 921220-930130.Corrective Actions:Security Computer Database Updated & Training & Badge & Id Will Compare Database on Annual Basis + (17:43:32, 19 December 2024)
- ML20044G815 + (17:43:34, 19 December 2024)
- ML20044G812 + (17:43:35, 19 December 2024)
- IR 05000458/1992035 + (17:43:36, 19 December 2024)
- ML20044G808 + (17:43:38, 19 December 2024)
- ML20044G807 + (17:43:39, 19 December 2024)
- PNO-III-93-031, on 930527,radiation Survey of Clevite Corp Site in Cleveland,Oh Identified Low Level Contamination in Some Cracks & Crevices in Concrete Floor.Area Restricted & Posted.Region III Will Review Survey Results + (17:43:42, 19 December 2024)
- IR 05000373/1993015 + (17:43:44, 19 December 2024)
- TAC:M85994 + (17:43:45, 19 December 2024)
- ML20044G802 + (17:43:47, 19 December 2024)
- 05000298/LER-1993-017, :on 930428,discovered That Hourly Fire Watch Patrol for RB Per TS Had Not Been Performed.Caused by Personnel Error.Review of Fire Watch Patrol Implementation Process Will Be Conducted + (17:43:48, 19 December 2024)
- ML20044G799 + (17:43:49, 19 December 2024)
- ML20044G796 + (17:43:51, 19 December 2024)
- ML20044G797 + (17:43:51, 19 December 2024)
- ML20044G794 + (17:43:52, 19 December 2024)
- ML20044G793 + (17:43:53, 19 December 2024)