See also: IR 05000313/1993004
Text
w
UNITED ST ATES
$ Mao
$g
NUCLEAR REGULATORY COMMISSION
.f
- -
,,
REGION IV
611 RYAN PLAZA DRIVE, SulTE 400
J . . . + #g[
o,
ARLINGioN, T EXAS 76011-8064
<<
JLN - 1 E
Docket: 50-313
'
50-368
License: OPR-51
Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President
Operations, Arkansas Nuclear One
Route 3, Box 137G
Russellville, Arkansas 72801
~
SUBJECT: NRC INSPECTION REPORT 50-313/93-04; 50-368/93-04
This refers to the inspection conducted by Ms. L. J. Smith, and the inspectors
identified in the enclosed report, of this office on March 7 through
April 17, 1993.
The inspection included a review of activities authorized for
your Arkansas Nuclear One, Units 1 and 2, facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations of the
activities in progress. The results of this inspection are documented in the.
enclosed report.
It was identified that, while your staff maintained a clear understanding of
the operability of the auxiliary electrical power. system components, the
failure to realize the applicability of Technical Specification 3.7.2.A
following the loss of 4160V Bus A-4 was a weakness. This was an isolated
occurrence and your staff took prompt and effective immediate corrective
actions.
Comprehensive actions to correct the problem have been planned.
It
is our understanding that Mr. J. D. Vandergrift, Unit 1 Plant Manager,
committed to ensure operator training was conducted on Technical Specification 3.7 requirements and that the need to refer to the text of the
Technical Specifications rather than relying on memory would be emphasized.
If your understanding of this commitment differs from ours, please contact us
immediately.
Based on the results of this inspection, certain licensed activities appeared
to deviate from commitments made to NRC, as specified in the enclosed Notice
'
of Deviation (Notice).
We are concerned because the failure to design for an environment that had the
potential for introducing condensate into the limit switch compartment was a
i
contributing cause for the inoperability of the emergency feedwater pump
i
i
6040381 930601
G
ADOCK 05000313
O
f-
s
s
,
Entergy Operations, Inc.
-4-
JUN - 1 D393
'
p;bec~to DMBJ(IE01)L
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Section Chief (DRP/TSS)
Project Engineer (DRP/D)
A. Bill Beach, D/DRP
,
,-
i
e
I
.
\\b'
b
- RIV:EA:DRP/D RI:DRP/D
RI:DRP/
SRI:DRP/D
RI:DRS/E
- RI:DRS/ES-
'
'fgKDWeaver/vh
ADGaines
SJCampbel
LJSmith
PAGoldberg
MFRunyan
N-/30/93
4/30/93
4/30/93
4/30/93
5/z4/93
5/ /93
__
C:DRSS/FI
- PE:DRP/D
C:DRP/d
, D:DR
TFStetkaj}~ABeach'
BMurray
KMKennedy
1
5/ib/93
/[/93
)
5/24/93 N
5/ /93
- previously concurred
040058
Il
..
,.f
s
.Entergy Operations, Inc.
-2-
l
1
1
turbine.
It is our understanding that Mr. J. D. Vandergrift, Unit 1 Plant
.
Manager, committed to install drains into the limit switch compartments of
i
Steam Admission Valves CV-2663 and CV-2613 and that all Limitorque operators
-
'
in the valve testing program within the Unit I and 2 penthouses will also be
evaluated to determine if additional low point drains are needed in the limit'
.
switch covers.
If your understanding of this commitment differs from ours,
j
please contact us immediately.
l
i
Although 10 CFR Section 2.201 requires you to submit to this office, within
20 days of your receipt of this Notice, a written statement of explanation, we
'
note that the corrective actions being taken adequately address the concerns
identified within the Notice of Deviation. Therefore, no response with
'
respect to the Notice is required.
,
,
In accordance with' 10 CFR Section 2.790 of the NRC's " Rules of Practice," a
'
copy of this letter and its enclosure will be placed in the NRC's Public
,
Document Room.
'
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
i
Sincerely,
>
. Bill Beach,
ir tr
Division of Rea t
Pro cts
Enclosures:
1.
Appendix A - Notice of Deviation
2.
Appendix B - NRC Inspection Report
,
50-313/93-04; 50-368/93-04 w/ attachment
.
,
cc w/ enclosure:
'
Entergy Operations, Inc.
ATTN: Donald C. Hintz, President &
Chief Operating Officer
,
'
P.O. Box 31995
Jackson, Mississippi 39286
Entergy Operations, Inc.
ATTN: John R. McGaha, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi 39286
)
1
.
-
...
.- t
,-
,
.Entergy Operations, Inc.
-3-
,
i
Wise, Carter, Child & Caraway
l
ATTN: Robert-B. McGehee, Esq.
P.O. Box 651
Jackson, Mississippi- 39205
.
Entergy Operations, Inc.
ATTN: James J. Fisicaro
Director, Licensing
Route 3, Box 137G
Russellville, Arkansas 72801
Entergy Operations, Inc.
-
ATTN: Michael B. Sellman, General
'i
Manager . Plant Operations
j
Route 3, Box 137G
,
'
Russellville, Arkansas 72801
Honorable Joe W. Phillips
"
County Judge of Pope County
Pope County Courthouse
,
Russellville, Arkansas 72801
l
-
Winston & Strawn
ATTN: Nicholas 15. Reynolds, Esq.
1400 L Street, N.W.
1'
Washington, D.C.
20005-3502
'!
ATTH: Ms. Greta Dicus, Director
Division of Radiation Control and
'
Emergency Management
4815 West Markham Street
i
Little Rock, Arkansas 72201-3867
B&W Nuclear Technologies
,
ATTN:
Robert B. Borsum
-
Licensing Representative
.
1700 Rockville Pike, Suite 525
Rockville, Maryland 20852
' i
Admiral Kinnaird R. McKee, USN (Ret)
214 South Morris Street
0xford, Maryland 21654
~;
.i
.I
i
.j
i
-
i
.!
i
,
.
-
..
.-
..
=
.
..
..y
. - -
,
r
.Entergy Operations, Inc.
-4-
,
'ABB Combustion Engineering
Nuclear Power
s
ATTN: Charles B. Brinkman
j
Manager, Washington
Nuclear Operations
12300 Twinbrook Parkway, Suite 330
.
Rockville, Maryland 20852
.
a
n
i
?
e
i
,
,
e
i
>
1
>
N
?
I
s
9
4
!
.
t
--t
.,.
.
.
I
s
.
Entergy Operations, Inc.
-4-
JUN - 1 1993
i
bcc to DMB (IE01)
!
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
MIS System
DRSS-FIPS
RIV File
Section Chief (DRP/TSS)
Project Engineer (DRP/D)
A. Bill Beach, D/DRP
1
.
I
,
.i
i
I
L
,
q RIV:EA:DRP/D RI:DRP/D
RI:DRP/D
SRI:DRP/
RI:DRS/E
- RI:DRS/ES
Q KDWeaver/vh
ADGaines
SJCampbel
LJSmith
PAGoldberg
MFRunyan
4/30/93
4/30/93
4/30/93
4/30/93
5/24/93
5/ /93
'
C:DRSS/FI
- PE:DRP/D
C:DRP/
, D:DR
1
BMurray
KMKennedy
TFStetkaj}ABeacB'
5/1b/93
/l/93
i
5/s/93 A
5/ /93
- previously concurred
.
- -