Forwards Insp Repts 50-313/93-04 & 50-368/93-04 on 930307-0417 & Notice of Violation.Understands That Util Committed to Ensure Operator Training Conducted on TS 3.7 Requirements & Need to Refer to Text of TS
ML20044G877
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/01/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Yelverton J
ENTERGY OPERATIONS, INC.
Shared Package
ML20044G878 List:
References
NUDOCS 9306040381
Download: ML20044G877 (5)


See also: IR 05000313/1993004

Text

w

UNITED ST ATES

$ Mao

$g

NUCLEAR REGULATORY COMMISSION

.f

  • -

,,

REGION IV

611 RYAN PLAZA DRIVE, SulTE 400

J . . . + #g[

o,

ARLINGioN, T EXAS 76011-8064

<<

JLN - 1 E

Docket: 50-313

'

50-368

License: OPR-51

NPF-6

Entergy Operations, Inc.

ATTN:

J. W. Yelverton, Vice President

Operations, Arkansas Nuclear One

Route 3, Box 137G

Russellville, Arkansas 72801

~

SUBJECT: NRC INSPECTION REPORT 50-313/93-04; 50-368/93-04

This refers to the inspection conducted by Ms. L. J. Smith, and the inspectors

identified in the enclosed report, of this office on March 7 through

April 17, 1993.

The inspection included a review of activities authorized for

your Arkansas Nuclear One, Units 1 and 2, facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations of the

activities in progress. The results of this inspection are documented in the.

enclosed report.

It was identified that, while your staff maintained a clear understanding of

the operability of the auxiliary electrical power. system components, the

failure to realize the applicability of Technical Specification 3.7.2.A

following the loss of 4160V Bus A-4 was a weakness. This was an isolated

occurrence and your staff took prompt and effective immediate corrective

actions.

Comprehensive actions to correct the problem have been planned.

It

is our understanding that Mr. J. D. Vandergrift, Unit 1 Plant Manager,

committed to ensure operator training was conducted on Technical Specification 3.7 requirements and that the need to refer to the text of the

Technical Specifications rather than relying on memory would be emphasized.

If your understanding of this commitment differs from ours, please contact us

immediately.

Based on the results of this inspection, certain licensed activities appeared

to deviate from commitments made to NRC, as specified in the enclosed Notice

'

of Deviation (Notice).

We are concerned because the failure to design for an environment that had the

potential for introducing condensate into the limit switch compartment was a

i

contributing cause for the inoperability of the emergency feedwater pump

i

i

6040381 930601

G

ADOCK 05000313

PDR

O

f-

s

s

,

Entergy Operations, Inc.

-4-

JUN - 1 D393

'

p;bec~to DMBJ(IE01)L

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

DRP

Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

DRS

Section Chief (DRP/TSS)

Project Engineer (DRP/D)

A. Bill Beach, D/DRP

,

,-

i

e

I

.

\\b'

b

- RIV:EA:DRP/D RI:DRP/D

RI:DRP/

SRI:DRP/D

RI:DRS/E

  • RI:DRS/ES-

'

'fgKDWeaver/vh

ADGaines

SJCampbel

LJSmith

PAGoldberg

MFRunyan

N-/30/93

4/30/93

4/30/93

4/30/93

5/z4/93

5/ /93

__

C:DRSS/FI

  • PE:DRP/D

C:DRP/d

, D:DR

TFStetkaj}~ABeach'

BMurray

KMKennedy

1

5/ib/93

/[/93

)

5/24/93 N

5/ /93

  • previously concurred

040058

Il

..

,.f

s

.Entergy Operations, Inc.

-2-

l

1

1

turbine.

It is our understanding that Mr. J. D. Vandergrift, Unit 1 Plant

.

Manager, committed to install drains into the limit switch compartments of

i

Steam Admission Valves CV-2663 and CV-2613 and that all Limitorque operators

-

'

in the valve testing program within the Unit I and 2 penthouses will also be

evaluated to determine if additional low point drains are needed in the limit'

.

switch covers.

If your understanding of this commitment differs from ours,

j

please contact us immediately.

l

i

Although 10 CFR Section 2.201 requires you to submit to this office, within

20 days of your receipt of this Notice, a written statement of explanation, we

'

note that the corrective actions being taken adequately address the concerns

identified within the Notice of Deviation. Therefore, no response with

'

respect to the Notice is required.

,

,

In accordance with' 10 CFR Section 2.790 of the NRC's " Rules of Practice," a

'

copy of this letter and its enclosure will be placed in the NRC's Public

,

Document Room.

'

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

i

Sincerely,

>

. Bill Beach,

ir tr

Division of Rea t

Pro cts

Enclosures:

1.

Appendix A - Notice of Deviation

2.

Appendix B - NRC Inspection Report

,

50-313/93-04; 50-368/93-04 w/ attachment

.

,

cc w/ enclosure:

'

Entergy Operations, Inc.

ATTN: Donald C. Hintz, President &

Chief Operating Officer

,

'

P.O. Box 31995

Jackson, Mississippi 39286

Entergy Operations, Inc.

ATTN: John R. McGaha, Vice President

Operations Support

P.O. Box 31995

Jackson, Mississippi 39286

)

1

.

-

...

.- t

,-

,

.Entergy Operations, Inc.

-3-

,

i

Wise, Carter, Child & Caraway

l

ATTN: Robert-B. McGehee, Esq.

P.O. Box 651

Jackson, Mississippi- 39205

.

Entergy Operations, Inc.

ATTN: James J. Fisicaro

Director, Licensing

Route 3, Box 137G

Russellville, Arkansas 72801

Entergy Operations, Inc.

-

ATTN: Michael B. Sellman, General

'i

Manager . Plant Operations

j

Route 3, Box 137G

,

'

Russellville, Arkansas 72801

Honorable Joe W. Phillips

"

County Judge of Pope County

Pope County Courthouse

,

Russellville, Arkansas 72801

l

-

Winston & Strawn

ATTN: Nicholas 15. Reynolds, Esq.

1400 L Street, N.W.

1'

Washington, D.C.

20005-3502

'!

Arkansas Department of Health

ATTH: Ms. Greta Dicus, Director

Division of Radiation Control and

'

Emergency Management

4815 West Markham Street

i

Little Rock, Arkansas 72201-3867

B&W Nuclear Technologies

,

ATTN:

Robert B. Borsum

-

Licensing Representative

.

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

' i

Admiral Kinnaird R. McKee, USN (Ret)

214 South Morris Street

0xford, Maryland 21654

~;

.i

.I

i

.j

i

-

i

.!

i

,

.

-

..

.-

..

=

.

..

..y

. - -

,

r

.Entergy Operations, Inc.

-4-

,

'ABB Combustion Engineering

Nuclear Power

s

ATTN: Charles B. Brinkman

j

Manager, Washington

Nuclear Operations

12300 Twinbrook Parkway, Suite 330

.

Rockville, Maryland 20852

.

a

n

i

?

e

i

,

,

e

i

>

1

>

N

?

I

s

9

4

!

.

t

--t

.,.

.

.

I

s

.

Entergy Operations, Inc.

-4-

JUN - 1 1993

i

bcc to DMB (IE01)

!

bec distrib. by RIV:

J. L. Milhoan

Resident Inspector

DRP

Section Chief (DRP/D)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

DRS

Section Chief (DRP/TSS)

Project Engineer (DRP/D)

A. Bill Beach, D/DRP

1

.

I

,

.i

i

I

L

,

q RIV:EA:DRP/D RI:DRP/D

RI:DRP/D

SRI:DRP/

RI:DRS/E

  • RI:DRS/ES

Q KDWeaver/vh

ADGaines

SJCampbel

LJSmith

PAGoldberg

MFRunyan

4/30/93

4/30/93

4/30/93

4/30/93

5/24/93

5/ /93

'

C:DRSS/FI

  • PE:DRP/D

C:DRP/

, D:DR

1

BMurray

KMKennedy

TFStetkaj}ABeacB'

5/1b/93

/l/93

i

5/s/93 A

5/ /93

  • previously concurred

.

- -