Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000316/LER-1982-033, Forwards LER 82-033/03L-0 + (11:28:24, 18 December 2024)
- IR 05000286/1982005 + (11:28:31, 18 December 2024)
- IR 05000261/1982008 + (11:28:37, 18 December 2024)
- ML20052G263 + (11:28:39, 18 December 2024)
- ML20052G261 + (11:28:41, 18 December 2024)
- ML20052G260 + (11:28:42, 18 December 2024)
- ML20052G259 + (11:28:44, 18 December 2024)
- ML20052G258 + (11:28:45, 18 December 2024)
- 05000336/LER-1982-011-03, /03L-0:on 820405,RCS Temp Dropped to 514 F.Caused by Borating to Control Xenon While Placing Turbine on-line Which Caused Power Reduction & Cooldown.Control Element Assemblies Withdrawn to Increase Power & Temp + (11:28:48, 18 December 2024)
- ML20052G256 + (11:28:51, 18 December 2024)
- ML20052G255 + (11:28:55, 18 December 2024)
- ML20052G253 + (11:28:56, 18 December 2024)
- ML20052G251 + (11:28:58, 18 December 2024)
- ML20052G250 + (11:28:59, 18 December 2024)
- 05000336/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl + (11:29:02, 18 December 2024)
- ML20052G247 + (11:29:04, 18 December 2024)
- ML20052G246 + (11:29:05, 18 December 2024)
- ML20052G245 + (11:29:06, 18 December 2024)
- ML20052G244 + (11:29:08, 18 December 2024)
- ML20052G243 + (11:29:10, 18 December 2024)
- IR 05000416/1982025 + (11:29:12, 18 December 2024)
- ML20052G241 + (11:29:15, 18 December 2024)
- ML20052G239 + (11:29:17, 18 December 2024)
- ML20052G237 + (11:29:23, 18 December 2024)
- ML20052G236 + (11:29:24, 18 December 2024)
- AECM-82-207, Advises of Two New Revisions to Hydrogen Ignition Sys Emergency Procedure 05-S-01-EP-7, Core Cooling W/O Level Restoration, in Place of Four Revisions Identified in 820430 Submittal + (11:29:25, 18 December 2024)
- IR 05000338/1982001 + (11:29:50, 18 December 2024)
- ML20052G232 + (11:29:52, 18 December 2024)
- ML20052G231 + (11:29:53, 18 December 2024)
- ML20052G230 + (11:29:55, 18 December 2024)
- IR 05000416/1982014 + (11:29:58, 18 December 2024)
- ML20052G227 + (11:30:00, 18 December 2024)
- ML20052G226 + (11:30:01, 18 December 2024)
- ML20052G225 + (11:30:02, 18 December 2024)
- IR 05000518/1982004 + (11:30:04, 18 December 2024)
- ML20052G220 + (11:30:07, 18 December 2024)
- ML20052G222 + (11:30:07, 18 December 2024)
- ML20052G219 + (11:30:13, 18 December 2024)
- ML20052G218 + (11:30:15, 18 December 2024)
- ML20052G217 + (11:30:16, 18 December 2024)
- ML20052G216 + (11:30:18, 18 December 2024)
- 05000265/LER-1982-005-03, /03L-0:on 820420,while Performing QIS-6,pressure Switch PS-2-1001-88D Found to Trip Above Tech Spec Limit. Caused by Instrument Setpoint Drift.Pressure Switch Recalibr & Functionally Tested + (11:30:20, 18 December 2024)
- AECM-82-160, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-14.Corrective Actions:Startup Manual Revised to Clarify Handling Test Stops Due to Measuring & Test Equipment Malfunctions or Plant Conditions + (11:30:22, 18 December 2024)
- ML20052G212 + (11:30:24, 18 December 2024)
- ML20052G210 + (11:30:26, 18 December 2024)
- 05000265/LER-1982-005, Forwards LER 82-005/03L-0 + (11:30:28, 18 December 2024)
- ML20052G207 + (11:30:30, 18 December 2024)
- ML20052G205 + (11:30:30, 18 December 2024)
- ML20052G204 + (11:30:31, 18 December 2024)
- ML20052G203 + (11:30:32, 18 December 2024)
- ML20052G202 + (11:30:33, 18 December 2024)