VIRGINIA ELECTHIC AND POWEH COMPANY
}{ICIIMOND, VIHORNIA 20 2 61
'Oa
- 14. II. LE A NBl? NO March 12, 1982 vitar...m..,
Nottsam cysmasson.
Mr. James P. O'Reilly Serial No. 143 Regional Administrator N0/RMT:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-338 Region II 50-339 101 Marietta Street, Suite 3100 License Nos. NPF-4 Atlanta, Georgia 30303 NPF-7
Dear Mr. O'Reilly:
Subject:
Report Nos. 50-338/82-01 and 50-339/82-01 We have reviewed your letter of February 25, 1982 in reference to the inspection conducted at North Anna Power Station between January 18, 1982 and January 28, 1982.
Concerning the commitment made to upgrade controlled drawings impacted by previous design changes such that they reflect those changes by March 12, 1982 the following information is being provided.
Presently there are five (5) design changes that will not have their priority drawings updated by March 12, 1982.
These five (5) design changes require additional information which we are actively trying to provide.
Stone and Webster will be able to update the priority drawings within fif teen (15) days of receipt of the additional information required.
In accordance with station policy and procedures, those controlled drawings located in the Control Room have been annotated with the changes.
Very truly y ur,,
i R. II. Leasburg cc: