Virginia Electric and Power Company
ATTN: Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
Subject: Report Nos. 50-338/82-01, 50-339/82-01
This refers to the routine safety inspection conducted by Messrs. G. A. Belisle,
P. E. Fredrickson and P. H. Skinner of this office on January 18-28, 1982, of
activities authorized by NRC License Nos. NPF-4 and NPF-7 for the North Anna
facility. Our preliminary findings were discussed with Mr. R. H. Leasburg, Vice
President, Nuclear Operations Department, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found chat certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed ~ n the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
As discussed in paragraph 6.b of the enclosed report, plant drawings have not
been updated in a timely manner to include certain previous design changes. This
matter was discussed by Mr. W. R. Cartwright of your staff with Mr. K. D. Landis
of this office on February 12, 1982.
Based on this telephone conversation, we
understand that a procedure will be developed by March 1,1982, that will require
updating applicable controlled drawings to reflect future design changes within
two days after the design change has been installed.
In addition, controlled
drawings impacted by previous design changes will be upgraded to reflect these
changes by March 12, 1982.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
i
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
.
of 2,790(b)(1).
i
8205140425 820503
DR ADOCK 05000338
F
. ' .
4
s
,
.
Virginia Electric and Power Co.
2
FEB 2 5 1982
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Ar/
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosure:
l
I.
Appendix A, Notice of Violation
l
2.
Inspection Report Nos. 50-338/82-01,
50-339/82-01
l
cc w/ encl:
D. G. Godwin, Director, Nuclear Security
l
J. H. Ferguson, Executive Vice President
W. R. Cartwright, Station Manager
bcc w/ encl:
Document Management Branch
Commonwealth of Virginia
NRC Resident Inspector
\\
>
f s(V
'h ~ I
+!.%
8'.A
yv
D'i j
t
q
p
,[
RI
RII
'RII
RII
RI
px
I
GBelisle:es
pright
1 ~ nksi
KLj r3 i s
HDance
RC e 's
d
Y#N*'
2/Z')I/82
2fih2
2/fb/82
2/f/82
2
/8
--
-