Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN048221, Forwards NPDES Discharge Monitoring rept,Jan-Mar 1982 + (21:15:27, 17 December 2024)
- ML20055A645 + (21:15:27, 17 December 2024)
- ML20055A640 + (21:15:28, 17 December 2024)
- RBG-12-986, Interim Deficiency Rept Re Insufficient End Gap of Beam Between Drywell Wall & Primary Shield Wall,Initially Reported 820302.More Detailed Evaluation Necessary.Final Rept Will Be Submitted by 821008 + (21:15:28, 17 December 2024)
- ML20055A638 + (21:15:29, 17 December 2024)
- ML20055A634 + (21:15:41, 17 December 2024)
- ML20055A632 + (21:15:41, 17 December 2024)
- 05000361/LER-1982-019, Forwards LER 82-019/03L-0.Detailed Event Analysis Submitted + (21:15:42, 17 December 2024)
- ML20055A629 + (21:15:43, 17 December 2024)
- 05000366/LER-1982-064, Forwards LER 82-064/03L-0 + (21:15:44, 17 December 2024)
- ML20055A624 + (21:15:46, 17 December 2024)
- ML20055A626 + (21:15:46, 17 December 2024)
- ML20055A620 + (21:15:50, 17 December 2024)
- 05000346/LER-1982-029, Forwards LER 82-029/03L-0 + (21:15:51, 17 December 2024)
- ML20055A615 + (21:15:56, 17 December 2024)
- 05000361/LER-1982-034, Forwards LER 82-034/01T-0.Detailed Event Analysis Submitted + (21:16:00, 17 December 2024)
- AECM-82-324, Forwards Proposed Revisions to FSAR Section 9.5 & App 9A Clarifying Presentation of Fire Protection Program,In Response to Outstanding Items 1(a) & 1(b) Identified in License NPF-13.Info to Be Incorporated Into Next FSAR Amend + (21:16:00, 17 December 2024)
- 05000249/LER-1982-027, Forwards LER 82-027/01T-0 + (21:16:08, 17 December 2024)
- 05000366/LER-1982-059, Forwards LER 82-059/03L-0 + (21:16:13, 17 December 2024)
- 05000346/LER-1982-027, Forwards LER 82-027/03L-0 + (21:16:15, 17 December 2024)
- 0CAN048215, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/82-04 & 50-368/82-04.Corrective Actions:Missing Pipe Strap on Line GBD-22 Replaced,Insp of All Seismic Supports Conducted & Manual Valves Mu-23 & 24 Repositioned + (21:16:15, 17 December 2024)
- ML20055A595 + (21:16:24, 17 December 2024)
- ML20055A594 + (21:16:25, 17 December 2024)
- 05000312/LER-1982-014-03, /03L-0:on 820619,pressurizer Liquid Sample Valve, SFV-70001,opened Properly But Failed to Close Properly on Command.Caused by Ax Relay Not Responding to Close Command. Relay Replaced + (21:16:26, 17 December 2024)
- ML20055A592 + (21:16:27, 17 December 2024)
- 05000312/LER-1982-014, Forwards LER 82-014/03L-0.Detailed Event Analysis Submitted + (21:16:28, 17 December 2024)
- 05000361/LER-1982-023, Forwards LER 82-023/03L-0.Detailed Event Analysis Submitted + (21:16:32, 17 December 2024)
- ML20055A586 + (21:16:34, 17 December 2024)
- 05000315/LER-1982-047, Forwards LER 82-047/03L-0 + (21:16:37, 17 December 2024)
- ML20055A582 + (21:16:39, 17 December 2024)
- AECM-82-321, Forwards Descriptions of Actions Planned for Resolving Concerns Raised by J Humphrey.Formal Program Results Will Be Provided by 820819,1001 & 1101 + (21:16:40, 17 December 2024)
- ML20055A579 + (21:16:41, 17 December 2024)
- ML20055A577 + (21:16:44, 17 December 2024)
- 05000293/LER-1982-017, Forwards LER 82-017/03L-0 + (21:16:45, 17 December 2024)
- PM-82-670, Forwards Monthly Operating Repts for June 1982 + (21:16:45, 17 December 2024)
- ML20055A566 + (21:16:55, 17 December 2024)
- 05000373/LER-1982-042, Forwards LER 82-042/03L-0 + (21:16:56, 17 December 2024)
- ML20055A562 + (21:16:58, 17 December 2024)
- ML20055A560 + (21:16:59, 17 December 2024)
- ML20055A561 + (21:16:59, 17 December 2024)
- ML20055A559 + (21:17:00, 17 December 2024)
- ML20055A556 + (21:17:02, 17 December 2024)
- ML20055A555 + (21:17:03, 17 December 2024)
- ML20055A553 + (21:17:04, 17 December 2024)
- 0CAN038203, Confirms 820303 Telcon & Updates Status of Util Efforts to Comply w/NUREG-0737,Item II.B.3 Re post-accident Sampling Capability.Problems w/in-line Boron Analysis Equipment Encountered + (21:17:05, 17 December 2024)
- ML20055A549 + (21:17:05, 17 December 2024)
- ML20055A547 + (21:17:06, 17 December 2024)
- 05000344/LER-1982-010-03, /03L-0:on 820610,following Fuel Removal from Core, Spent Fuel Pool Level Was Inadvertently Pumped Below Min Limit.Caused by Personnel Error.Level Raised by Opening Transfer Canal Door.Level Switch Arm Straightened + (21:17:14, 17 December 2024)
- IR 05000213/1982012 + (21:17:16, 17 December 2024)
- ML20055A540 + (21:17:17, 17 December 2024)
- 05000316/LER-1982-051, Forwards LER 82-051/03L-0 + (21:17:21, 17 December 2024)