LoulSIANA f 24a OuAnONoE srnur POWE R & L1G H T/ P O BOX 6000
- NEW ORLEANS. LOUISIANA 70174. (504) 366 2345 ONE$YIU uT July 6, 1982 G. D. McLENDON Senior Vice President W3K-82-0391 Q-3-A35.07.45 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 lI D fM @[5 ((\\W fj/
Arlington, Texas 76012
\\
R l 21982
Subject:
Waterford SES Unit No. 3 Docket No. 50-382
\\-
Significant Construction Deficiency No. 45 "AKR 50 Relay Bell Switch Mounting Failure" l
Reference:
LP&L Letter W3K-82-0080
Dear Mr. Collins:
The material installation and rework required to correct the "AKR 50 Relay Bell Switch Mounting Failure" has now been completed by LP&L personnel.
EBASCO is now compiling those required documents to provide closure of this SCD-45.
The final report will be submitted on July 23, 1982.
Very truly yours,
?
cc:
- 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 2) Director Office of Management
}
Information and Program Control X
U. S. Nuclear Regulatory Commission p
Washington, D. C.
20555