e*
OPERA 11NG DATA REPORT DOCKET NO.
50-302 DATE 7/1/82 C051PLETED BY D.
Bonart TELEP110NE (904) 795-6486 OPERATING STAT 1JS
- 1. Unit Name:
Crystal River Unit #1 Notes
- 2. iteporting Period:
6/1/82 - 6/30/82
- 3. Licensed Thennal Power (51Wt):
2544
- 4. Nameplate Rating (Gross alWe):
890
- 5. Design Electrical Rating (Net SIWE): _825
- 6. Slaximum Dependable Capacity (Gross 31We):
845
- 7. Staximum Dependable Capacity (Net 31We):
806
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted,if Any (Net 51We):
Approximately 2300 MW thermal.
- 10. Reasons For Restrictions,1f Any:
Restricted to 2300 MW thermal due to RC Pump Power Monitors being bypassed. Net MWe corresponding to this varies with cycle efficiency.
This Slonth Yr.-to-Date Cumulative f
i1. Ilours In Reporting Period 720 4344 46464
- 12. Number Of Ilours Reactor Was Critical 703.7 3379.5 28828.89
- 13. Reactor Reserve Shutdown flours 4.2 19.9 1229.12
- 14. Ilours Generator On Line 698.1 3339.6 28151.78
- 15. Unit Reserve Shutdown flours 0
0 0
- 16. Gross Thermal Energy Generated (SIWil) 1451344 7539000 62905941
- 17. Gross Electrical Energy Generated (51WII) 489790 2563074 21362665
- 18. Net Electrical Energy Generated (SIWil) 463686 2437844 20267142
- 19. Unit Service factor 97.0%
76.9%
60.6%
- 20. Unit Availability Factor 97.0%
76.9%
60.6%
- 21. Unit Capacity Factor (Using 51DC Net) 79.9%
69.6%
55.6%
- 22. Unit Capacity Factor (Using DER Net) 78.1%
68.0%
52.9%
21 Unit Forced Outage Rate 3.0%
23.1%
26.2%
- 24. Shutdowns Scheduled Oser Next 6 Slonths(Type. Date.and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
7/1/82
- 26. Units in Test Status (Prior to Commercial Operationi:
Forecast Achiesed INill \\ L CRITICA LITY 1/14/77 INIIIAL ELECTRICITY 1/30/77 CO\\lNIERCIAL OPER AIION 3/13/77 8207190262 820712 (9/77)
PDR ADOCK 05000302 R
pop
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50-302 UNIT FLCRP-3 DATE 7/1/82 COMPLETED BY D. Bogart TELEP110NE (904) 795-6486 MONTil June 1982 DAY
- AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mbe-Net)
(ywe.ye,
1 744 17 619 2
703 224 gg 3
723 524 39 4
710 20 436 5
750 21 571 739 6
579 22 7
753 579 23 8
748 24 565 765 9
25 565 745 10 572 26 11 751 27 561 12 742 28 565 751 13 570 29 I4 30 524 13 740 3,
3 16 INSTRUCTIONS On :his format, list the average daily unit power lesel in MWe-Net for each day in the reporimg month. Compute to the nearest whole megawatt.
(9 /77 )
~ - -.., - -,. - - - -
d UNIT SilUTDOWNS AND POWER REDUC 110NS DOCKET NO.
50-302 UNIT NAME _FT rup_,
D ATE 7/7/82 COMPLETED BY M.W. Culver REPORT MONTil 6/82 TELEPflONE (904) 705-64R6 C
e3 T
=a O
.5 ?
s 4iX Licensee
[-r, E%
Cause & Corrective R"f Attiini to No.
D.it e g
3g g
,3 g 5 Event
=?
$5 5
j5g Report
- N0 Prescia Recurrence 6
82-13 820617 F
17.57 A
3 N/A IA RELAYX Roof joint leak caused a ' ground fault on RC pump 'B' resulting in a reactor /
turbine RPS trip.
j 1
82-14 820618 F
A 4
N/A Hli MECFUN Power reduced to 70% to 80% power due to the loss of condensate pump IB.
1 L
82-15 820620 F
4.2 G
3 N/A CD ZZZZZZ Operator accidentally closed the Main i
Steam Isolation Valves causing reactor /
turbine trip on high pressure.
82-16 820630 F
0.13 D
1 Not written SF HANGER Discovered that conduits carrying g
yet, see next some 11PI controls were not seismically month.
qualified. Declared HPI inoperable, entered I hour action statement, manually shutdown the reactor.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Piepaution of Data B-Maintenance of Test 2 Manual Scram.
Ent > Sheets for Licensee C Refueling 3-Automatic Scram.
Esent Report (LER) File INURI G-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G-Operational Error (Explain)
Exhibit I-Same Source
)
P)/77).
Il-Other ( Explain) 4
MONTiiLY CPERATIONAL SUIStARY STATEMENT
(..'c =
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 7/7/82 COMPLETED BY M.W. Culver TELEPIIONE(904) 795-6486 MONTil.. Tune 19A?
SIDS!ARY STATD!ENT:
The plant experienced three (3) forced shutdowns and one (1) major power reduction this month.
(
e