Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NG-93-4839, Monthly Operating Rept for Oct 1993 for Duane Arnold Energy Ctr + (15:45:42, 17 December 2024)
- ML20058B736 + (15:45:43, 17 December 2024)
- RBG-39390, Monthly Operating Rept for Oct 1993 for River Bend Station Unit 1 + (15:45:45, 17 December 2024)
- ML20058B734 + (15:45:46, 17 December 2024)
- IR 05000293/1982021 + (15:45:47, 17 December 2024)
- ML20058B730 + (15:45:48, 17 December 2024)
- ML20058B729 + (15:45:49, 17 December 2024)
- ML20058B727 + (15:45:50, 17 December 2024)
- ML20058B723 + (15:45:51, 17 December 2024)
- IR 05000387/1982009 + (15:45:53, 17 December 2024)
- ML20058B721 + (15:45:54, 17 December 2024)
- ML20058B719 + (15:45:55, 17 December 2024)
- 05000296/LER-1982-027-03, /03L-0:on 820623,hydrogen Analyzer a Inboard Sample Return Valve 3-FSV-76-57 Failed in Closed Position. Caused by V52630-529-1 Solenoid Assembly Failure Due to Damaged Lead Wire to Solenoid Operator + (15:45:57, 17 December 2024)
- LD-93-168, Forwards Text Portion for Cessar-DC Section 143,addressing Basis for Selecting Tier 1 Design Certification Matl & Assoc ITAAC for Comment + (15:45:59, 17 December 2024)
- ML20058B713 + (15:46:00, 17 December 2024)
- ML20058B710 + (15:46:01, 17 December 2024)
- ML20058B709 + (15:46:06, 17 December 2024)
- ML20058B708 + (15:46:07, 17 December 2024)
- ML20058B702 + (15:46:08, 17 December 2024)
- 05000296/LER-1982-027, Forwards LER 82-027/03L-0 + (15:46:13, 17 December 2024)
- 05000373/LER-1993-016-04, :on 931022,RCIC Declared Inoperable Due to Loss of Power to Govenor Control.Caused by Tarnished Contact Surfaces of Tracking Control Relay 1E51-AK049.Relay Replaced + (15:46:16, 17 December 2024)
- 05000374/LER-1993-008-06, :on 931022,inadvertent ESF Actuations Occurred Due to Personnel Error During Performance of Instrument Surveillence.Dg O Initiation Signal Verified & Stop Work Order Issued Re LIS-NB-216 + (15:46:23, 17 December 2024)
- IR 05000344/1990020 + (15:46:25, 17 December 2024)
- ML20058B692 + (15:46:26, 17 December 2024)
- ML20058B690 + (15:46:27, 17 December 2024)
- ML20058B689 + (15:46:31, 17 December 2024)
- 2CAN109017, Responds to NRC 900830 Request for Addl Info Re Tech Spec Change Request Re Spent Fuel Pool.Extension to 910115 Requested + (15:46:36, 17 December 2024)
- ML20058B686 + (15:46:38, 17 December 2024)
- ML20058B683 + (15:46:40, 17 December 2024)
- ML20058B680 + (15:46:41, 17 December 2024)
- ML20058B679 + (15:46:42, 17 December 2024)
- ML20058B678 + (15:46:43, 17 December 2024)
- IR 05000219/1993025 + (15:46:45, 17 December 2024)
- ML20058B674 + (15:46:46, 17 December 2024)
- 05000302/LER-1982-044, Forwards LER 82-044/03T-0 + (15:46:47, 17 December 2024)
- ML20058B669 + (15:46:51, 17 December 2024)
- ML20058B667 + (15:46:53, 17 December 2024)
- ML20058B665 + (15:46:54, 17 December 2024)
- ML20058B662 + (15:46:55, 17 December 2024)
- ML20058B661 + (15:46:56, 17 December 2024)
- ML20058B659 + (15:46:57, 17 December 2024)
- ML20058B658 + (15:46:58, 17 December 2024)
- ML20058B652 + (15:47:00, 17 December 2024)
- ML20058B651 + (15:47:01, 17 December 2024)
- SNRC-1766, Revises 900316 Request for Interim Relief from 5-yr Insp Requirements & Tech Spec Surveillance Requirements + (15:47:03, 17 December 2024)
- IR 05000259/1982017 + (15:47:05, 17 December 2024)
- BSEP-90-0705, Responds to Violations Noted in Insp Repts 50-325/90-29 & 50-324/90-29.Corrective Actions:Equipment Clearance Procedure Will Be Revised to Clarify Verification Requirements + (15:47:09, 17 December 2024)
- IR 05000029/1993008 + (15:47:13, 17 December 2024)
- ML20058B646 + (15:47:14, 17 December 2024)
- ML20058B643 + (15:47:16, 17 December 2024)
- ML20058B638 + (15:47:18, 17 December 2024)