Forwards IE Insp Repts 50-327/82-11 & 50-328/82-11 on 820524-28.No Noncompliance Noted
ML20058B662
Person / Time
Site: Sequoyah  
Issue date: 07/02/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20058B666 List:
References
NUDOCS 8207260098
Download: ML20058B662 (2)


See also: IR 05000327/1982011

Text

. _ _ - - _ _ _ _ _

.

.

OFFICAL LETTER COPY

JUL -21982

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos @ 27/82-1 and 50-328/82-11

This refers to the routine safety inspection conducted by Mr. G. N. Huffman of

this office on May 24-28, 1982, of activities authorized by NRC Operating License

Nos. DPR-77 and DPR-79 for the Sequoyah facility and to the discussion of our

findings held with Mr. J. McGriff, Assistant Plant Superintendent, at the

conclusion of the inspection.

This inspection was a comprehensive examination of your management and quality

assurance controls related to licensed activities.

Inspection was conducted in

selected key areas of responsibilty at both the plant site and your corporate

offices. Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 10 CFR 2.790(b)(1).

8207260098 820702

PDR ADOCK 05000327

[Ql

G

PDR

.

.

Tennessee Valley Authority

2

JUL - 21982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

4/

F. J. Long, Acting Chief

Projects Branch 1

Division of Project and

Resident Programs

Enclosure:

Inspection Report Nos. 50-327/82-11

and 50-328/82-11

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project Manager

C. C. Mason, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

i

RII

RII

I

RII.,

RII

f

h

//$.^

L'RCrlenjak

JPSkohr

FJLong

TM

dv4NHuffham:ejv <6RJenkins

i-f/p82

'5/R/82

/82

'f/ G./82

p/9-182

,