L L
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 SN 157B Lookout Place 00T 221990 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 STEAM GENERATOR TUBE PLUGGING As required by SQN Technical Specification 4.4.5.5.a. this submittal provides notification of steam generator tube plugging during the Unit 2 Cycle 4 refueling outage. The in-service inspection of the steam generator tubes was completed on October-12, 1990. TVA will submit a special report of the results of this inspection on or before October 12, 1991. contains a summary of the tubes plugged in Unit 2 during this outage.
Eighteen tubes-were plugged with Westinghouse Electric Corporation Inconel 690 plugs. As a result of NRC Bulletin 89-01 concerns, the Westinghouse Inconel 600 plugs in'one additional tube were removed and replaced with Westinghouse Inconel 690 plugs.
The summary statement of the commitment contained in this letter is provided in Enclosure 2.
Please direct questions concerning this issue to J. D. Smith at (615): 843-6172.
9 Very truly yours, TENNESSEE VALLEY AUTHORITY
/
+E.G.Wallace, Manager Nuclear Licensing'and
-Regulatory Affairs Enclosures ec: See page.2.
, j'd C N I
9010300363 901022 PDR ADOCK 0500032G fg Q
PDC An Equal Opportunity Employer if I
7 4
4 U.S. Nuclear Regulatory Commission g
cc (Enclosures):
Ms. S. C. Black, Deputy Director Project Directorate II-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike 1-Rockville, Maryland 20852 Mr. J. N. Donohew Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road
. Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission
-Region II
.101 Marietta Street, NW', Suite 2900 Atlanta, Georgia 30323
?
v i
- o s
k
1,,;,papeu -
n~
n,,
e k
,! h ENCLOSURE 1 UNIT 2 CYCLE 4 REFUELING OUTAGE STEAM GENERATOR TUBE PLUGGING
SUMMARY
P D
\\ '.
- h. h i
9 h
i
'I i
s S..
p
)
'f 4 k N45rn h4 [i-% '5
.n
i L
[
Steam Generator Tube Plugging List Sequoyah Nuclear Plant
[
Unit 2 Cycle 4 l
S/G Row Col Location Reason for Plugging i
1 34 46 AV2 + 0.0 42 AVB wear 34 48 AV2 + 0.0 39 AVB wear 4
49 AV2 + 0.0 37 AVB wear 34 50 AV2 + 0.0 42 AVB wear 10 60 N/A N/A NRC Bulletin 88-02 l
t
)
2 33 54 AV3 + 0.0 46 AVB wear 33 57 AV2 + 0.0 41 AVB wear l
AV3 + 0.4 52 AVB wear j
34 34 AV2 + 0.0 38 AVB wear 34 62 AV3 + 0.0 41 AVB wear i
43 34 001 + 0.0 44 Cold leg wastage 43 35 C01 + 0.0 50 Cold leg wastage 3
2 94 N/A N/A Previously plugged; Inconel 600 plug replaced with Inconel 690 (ref: NRC Bulletin 89-01)
'43 32 C01 + 0.0 38 Cold leg wastage i
4 9
60 N/A N/A NRC Bulletin 88-02 27 an HTS + 0.0 85 Expansion Transition indication 40
'41 HTS - 0.1.
75.
Expansion Transition indication 42-34 HTS - 0.1 46 Expansion Transition indication
{
43' 30 HTS + 1.0 41 OD Volumetric Defect
~
44 43 HTS - 0.1 58 Expansion Transition indication l
i TOTALS
{
' S/G 1 - 5 (99 cumulative)
. S/G12 - 6 (100 cumulative) q S/G' 3 1 + 1 replug (96 cumulative)
S/G
'4 - _6 (101 cumulative)-
. TOTAL - 18 + l replug 4
l DEFINITIONS 1
AV2 Second anti-vibration bar above hot leg:
3
' AV3-Third = anti-vibration bar above' hot leg C011
.First' support plate cold leg.
HTS.
Top of tube sheet - hot leg 1
AVB' Anti-vibration bar j
V:
1 l
i ENCLOSURE 2 l
>go.
LIST OF COMMITMENTS TVA will submit a special report of the results of this inspection on or before October 12, 1991.