Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058J037 + (13:47:47, 17 December 2024)
- 05000339/LER-1982-045, Forwards LER 82-045/03L-0 + (13:47:48, 17 December 2024)
- ML20058J034 + (13:47:48, 17 December 2024)
- ML20058J032 + (13:47:49, 17 December 2024)
- ML20058J030 + (13:47:49, 17 December 2024)
- ELV-02255, Special Rept 1-90-7 Re Invalid Diesel Generator Failure on 901025.Caused by Operator Using Improper Timing Method to Time Event.Diesel Generator 1B Restarted Using Proper Timing Method & Required Frequency Range Reached within Time Limit + (13:47:50, 17 December 2024)
- ML20058J026 + (13:47:51, 17 December 2024)
- PY-CEI-NRR-1258, Forwards Response to Violations Noted in Insp Rept 50-440/90-18 on 900730-0919.Corrective Actions:Operations Manager Will Provide Training & Discussion of Issue During Licensed Operator Requalification Training + (13:47:51, 17 December 2024)
- ML20058J024 + (13:47:52, 17 December 2024)
- ML20058J023 + (13:47:56, 17 December 2024)
- ML20058J022 + (13:47:57, 17 December 2024)
- PNO-IV-90-040, gamma Reading of 72.8 Rems on Radiographer TLD Badge Found During TLD Svc Read Out of Sept/Oct Badges at Agreement State Licensee,Global X-Ray + (13:47:58, 17 December 2024)
- PNO-IV-93-037, on 931130,licensed Shift Supervisor Badge for Access Into Protected Area Voluntarily Entered Employee Assistance Program on 931129 for Illegal Drug & Alcohol Abuse.Region IV Will Review Results of Investigation + (13:47:58, 17 December 2024)
- ML20058J017 + (13:47:59, 17 December 2024)
- IR 05000267/1990020 + (13:48:00, 17 December 2024)
- ML20058J013 + (13:48:00, 17 December 2024)
- ML20058J012 + (13:48:01, 17 December 2024)
- ML20058J011 + (13:48:02, 17 December 2024)
- ML20058J010 + (13:48:02, 17 December 2024)
- 05000302/LER-1982-047-04, /04T-0:on 820720,waste Disposal Tank 11B Discharged W/Flow Rate Meter WD-101-FR Inoperable.Caused by Operator Error.Rate Meter Power Supply Reset.Procedures to Be Revised + (13:48:04, 17 December 2024)
- ML20058J007 + (13:48:05, 17 December 2024)
- ML20058J006 + (13:48:05, 17 December 2024)
- 1CAN119007, Provides Addl Info to Support Amend Request to Increase Reactor Power to 100%,per 901108 Request + (13:48:06, 17 December 2024)
- ML20058J004 + (13:48:06, 17 December 2024)
- ML20058J002 + (13:48:08, 17 December 2024)
- ML20058J001 + (13:48:08, 17 December 2024)
- 05000302/LER-1982-047, Forwards LER 82-047/04T-0 + (13:48:09, 17 December 2024)
- ML20058H999 + (13:48:09, 17 December 2024)
- ML20058H997 + (13:48:10, 17 December 2024)
- ML20058H996 + (13:48:10, 17 December 2024)
- ML20058H995 + (13:48:11, 17 December 2024)
- ML20058H994 + (13:48:12, 17 December 2024)
- ML20058H992 + (13:48:13, 17 December 2024)
- ML20058H991 + (13:48:14, 17 December 2024)
- IR 05000295/1982008 + (13:48:15, 17 December 2024)
- ML20058H986 + (13:48:16, 17 December 2024)
- ML20058H985 + (13:48:17, 17 December 2024)
- ML20058H984 + (13:48:18, 17 December 2024)
- 05000325/LER-1982-077-03, /03L-0:on 820701,average Power Range Monitor (APRM) F Became Inoperable Due to Upscale Signal from Input Low Power Range Monitor 28-37A While APRM B Also Inoperable. Caused by Moisture in Detector Cable Connector + (13:48:19, 17 December 2024)
- ML20058H980 + (13:48:25, 17 December 2024)
- ML20058H979 + (13:48:25, 17 December 2024)
- ML20058H978 + (13:48:26, 17 December 2024)
- IR 05000327/1982017 + (13:48:27, 17 December 2024)
- ML20058H975 + (13:48:28, 17 December 2024)
- 05000325/LER-1982-077, Forwards LER 82-077/03L-0 + (13:48:29, 17 December 2024)
- ML20058H974 + (13:48:29, 17 December 2024)
- ML20058H972 + (13:48:30, 17 December 2024)
- ML20058H969 + (13:48:31, 17 December 2024)
- ML20058H968 + (13:48:31, 17 December 2024)
- ML20058H964 + (13:48:33, 17 December 2024)
- 05000029/LER-1982-019-03, /03L-0:on 820629,voltage Surges on 115-kV Lines During Thunderstorm Resulted in Loss of Z 126 Line & Loss of Flow Scram.Caused by Lightning Strike on 115-kV Line During Storm.Line Restored to Svc + (13:48:34, 17 December 2024)
- ML20058H962 + (13:48:36, 17 December 2024)