,e GPU Nuclear Corporation g
f Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
November 15, 1990 C311-90-2144 2
U.-S. Nuclear-Regulatory Commission Attn: ~ Document Control Desk Washington, DC 20555 E
t
-Gentlemen:
Subject:
-Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License.No. DPR-50 Docket No. 50-289 Errata of GPU Nuclear's Inservice Inspection (ISI)
Data Report, dated: June-4, 1990
-l e
')
.During a recent internal-~ audit,'GPU Nuclear discovered an error
' in the NIS-1 Inservice Inspection (ISI) Data Report which was submitted to.the NRC on> June 4, 1990.- Attached is the revised page 16'from Table 1 of the report.
The correction, indicated by a-margin bar,' reports Reactor Coolant Pump "D" main flange' bolt J
RCPd-005MF-F obstructed'instead cf RCPd-003MF-F as:previously reported.
Sincerely,
,).
s
/
k 11 Vice President and i
Director, TMI-1 HDH/MRK:
- Attachment cc:
Region-I Administrator, NRC Director, Project-Directorate I/4, NRC TMI-1 Senior Resident Inspector, NRC-TMI-1 Project Manager, NRC Chief Inspector, PA DOLI Boiler Division H
A[
Hartford Steam Boiler I&I Co.
0 F
9011270134 901115 gi POR ADOCK 05000289
\\