Interim Deficiency Rept Re Calibr of Torque Wrenches. Initially Reported on 810303.Programs of Site Contractors Performing QA Level 1 Torquing Reviewed & Appropriate Deviation Disposition Requests Issued.Next Rept by 821119
ML20058H992
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/23/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-59381, NUDOCS 8208090131
Download: ML20058H992 (1)


Text

Donald A. Wells f $$$$$?

2000 Second Avenue 31 3 July 23, 1982 EF2-59381 Mr. Janes G. Keppler, Regional Administrator Region III' U.S. Nuclear Regulatory Caraission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) Item on Calibration of 'lbrque Wrenches (#40)

Dear Mr. Keppler:

This additional interim report on the calibration of torque wrenches problem has been prepared to provide you with the current status of this problem.

The problem was originally reported to Mr. J.E. Konklin of NRC Region III by Detroit Edison's Mr. II.A. Walker, Supervisor-Construction Quality Assur-ance, on March 3, 1981.

Programs of all site contractors performing OA level I torquing have been reviewed. Deviation Disposition Requests (DDRs) were issued where hardware problems were found. Procedures were revised where needed, and purchase orders changed to provide the required control. DDRs which were written have been dispositioned to provide a 20% sampling of questionably torqued items to verify accuracy. Calibration frequencies used by the various contractors were reviewed, and in one case, the calibration interval was shortened. Work is continuing on this problem.

Another report on this item, either interim or final, is scheduled to be sent to you on or before November 19, 1982. If you have questions concern-ing this matter, please contact Mr. G.M. Trahey, Assistant Director - Project Quality Assurance.

Very truly yours, W

DAW /DF/cp cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Cmmission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Camission 6450 North Dixie Highway Newport, Michigan 48166 8208090131 820723 b6 21982 PDR ADOCK 05000341 S PDR dbN