Category:PRELIMINARY SAFETY ANALYSIS REPORT & AMENDMENTS (PSAR
MONTHYEARML20023D4071983-05-31031 May 1983 Amend 77 to PSAR ML20079N3691983-03-0202 March 1983 Amend 76 to PSAR ML20070W2001983-02-28028 February 1983 Corrected Pages to Page Replacement Guide of Amend 75 to PSAR ML20028G4251983-02-28028 February 1983 Amend 75 to PSAR ML20070K6661982-12-31031 December 1982 Amend 74 to PSAR ML20028B4681982-11-30030 November 1982 Amend 73 to PSAR ML20065S2491982-10-31031 October 1982 Amend 72 to PSAR ML20027B9471982-09-30030 September 1982 Amend 71 to PSAR ML20062N5901982-08-31031 August 1982 Amend 70 to PSAR ML20071K4221982-07-31031 July 1982 Amend 69 to PSAR ML20058J0261982-07-30030 July 1982 Page Replacement Guide for Amend 69 to PSAR ML20063G8551982-06-30030 June 1982 Updated Pages for Ref 106 of PSAR Section 1.6,CRBRP-3,Vol 2, Hypothetical Core Disruptive Accident Considerations in Crbr:Assessment of Thermal Margin Beyond Design Base ML20049J5391982-03-31031 March 1982 Amend 66 to PSAR ML20050A5581982-03-31031 March 1982 Amend 67 to PSAR ML20042C0711982-03-22022 March 1982 Updated Pages for Revision 3,Vol 2 of PSAR for CRBR-3 ML20071H6391982-02-28028 February 1982 Amend 65 to PSAR ML20040F0471982-01-31031 January 1982 Amend 64 to PSAR ML20039B3151981-12-18018 December 1981 Amend 63 to PSAR ML20038A7171981-11-30030 November 1981 Amend 62 to PSAR ML20010G4861981-09-18018 September 1981 Amend 61 to PSAR ML19343B9161981-02-28028 February 1981 Amend 60 to PSAR ML19345B3051980-11-26026 November 1980 Amend 58 to PSAR ML19339B6701980-11-0707 November 1980 Amend 57 to PSAR ML19331D3181980-08-29029 August 1980 Amend 56 to PSAR ML19318B6231980-06-27027 June 1980 Amend 55 to PSAR ML19323G0591980-05-30030 May 1980 Amend 54 to PSAR ML19257D0271980-01-31031 January 1980 Amend 53 to Psar.Seventeen Oversize Drawings Encl ML19254D0581979-10-19019 October 1979 Psar,Amend 52 ML19224C3481979-06-29029 June 1979 Amend 50 to PSAR ML19269D0011979-02-0606 February 1979 Amend 48 to Psar,Including Updates & Revisions to Sections Re Inert Gas Receiving & Processing Sys & Conventional Fire Protection Sys. 1983-05-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20080S6761984-02-29029 February 1984 Draft Site Redress Plan ML20083C8921983-12-27027 December 1983 Final Rept of Crbr Piping & Valve Technical Support Team ML20083M1611983-10-24024 October 1983 Part 21 Rept Re Noncompliance to ASME Code Test Requirement Involving Nuclear Part Not Receiving Pressure Test Prior to Acceptance.Change Control Procedure Revised to Be More Explicit on Types of Documents Utilized ML20085A7361983-07-0606 July 1983 Rev 2 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20023D4071983-05-31031 May 1983 Amend 77 to PSAR ML20076D3201983-05-31031 May 1983 Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins ML20072B3561983-05-27027 May 1983 Crbr Erosion & Sediment Control Plan Rept ML20084L9931983-03-31031 March 1983 Rev 5 to Hypothetical Core Disruptive Accident Considerations in Crbrp, Vol 2, Assessment of Thermal Margin Beyond Design Base ML20071F1971983-03-10010 March 1983 Adequacy of Crbr Program Reactor Vessel NDE Insps ML20072B6401983-03-0404 March 1983 Crbr Program Heat Transport Sys Incontainment Piping Reserve Seismic Margins ML20079N3691983-03-0202 March 1983 Amend 76 to PSAR ML20028G4251983-02-28028 February 1983 Amend 75 to PSAR ML20070W2001983-02-28028 February 1983 Corrected Pages to Page Replacement Guide of Amend 75 to PSAR ML20079L5131983-02-10010 February 1983 Sodium Slug Energy Absorption Capability of Modified Crbr Closure Head, Westinghouse Crbr Engineering Study Rept ML20028C2911983-01-31031 January 1983 Crbr PSAR Chapter 17.0-QA,App D Description of NSSS QA Program, Submitted for Inclusion in Amend 75 to PSAR ML20064J9381983-01-0707 January 1983 Crbr Reliability Assurance Activities ML20070H8321982-12-31031 December 1982 Assessment of Unprotected Loss of Flow Accident at End of Cycle-4 in Crbr Heterogeneous Core Design ML20070K6661982-12-31031 December 1982 Amend 74 to PSAR ML20070H8521982-12-23023 December 1982 Freezing of Driver Fuel Upon Entry to Inner Blanket ML20070M0801982-12-21021 December 1982 Reactor Vessel Core Support Cone Structural Integrity ML20057B5651982-12-0909 December 1982 Partially Withheld Commission Paper Re NRDC Vs NRC 82-1962 Re Facility ML20057B5631982-12-0707 December 1982 Partially Withheld Commission Paper Informing Commission of DC Circuit Court Decision Re Facility ML20028E9371982-11-30030 November 1982 Crbr Plant Verification of FORE-2M Computer Code,Part II-Comparison w/EBR-11 Natural Circulation Experiments. ML20028B4681982-11-30030 November 1982 Amend 73 to PSAR ML20028B4811982-11-23023 November 1982 Thermal Margin Beyond Design Basis (Tmbdb) Melting Scenario. ML20065S2491982-10-31031 October 1982 Amend 72 to PSAR ML20070C8921982-10-31031 October 1982 Aerosol Release from Sodium-Concrete Reactions. Prototype Hydrogen Filter Preliminary Test Results Encl ML20070C9171982-10-31031 October 1982 Hydrogen Distribution in Breeder Reactor Containments, Summary Rept.Miscellaneous Updates to CRBRP-3,Vol 2 Info on Containment Cleanup Sys & Revised Response to Question CS760.144 on Axisymmetric Distribution of Temps Encl ML20028A6141982-09-30030 September 1982 Supplementary Manual for F0RE-2M Computer Program. ML20027B9471982-09-30030 September 1982 Amend 71 to PSAR ML20083M7271982-08-31031 August 1982 Thermal Margin Beyond Design Base (Tmbdb) Sodium-Concrete Penetration Margins Assessment for Crbr Plant ML20062H0821982-08-31031 August 1982 Limited Const Activities Rept ML20062N5901982-08-31031 August 1982 Amend 70 to PSAR ML20055C1621982-08-13013 August 1982 Recommends Modifying Proposed Decision Granting in Part Exemption from 10CFR50.12 by Adding Provision Re Endangered Species Act ML20057B5371982-08-10010 August 1982 Partially Withheld Commission Paper to Provide Draft Order Concluding Commission Proceeding on DOE Request for Exemption Per 10CFR50.12 ML20062D6121982-08-0404 August 1982 Hypothetical Core Disruptive Accident Considerations in Crbrp:Assessment of Thermal Margin Beyond Design Base, Vol 2,Revision 4 ML20071K4221982-07-31031 July 1982 Amend 69 to PSAR ML20058J0261982-07-30030 July 1982 Page Replacement Guide for Amend 69 to PSAR ML20058E4561982-07-22022 July 1982 Crbr Plant Rept ML20065A3701982-07-16016 July 1982 Draft Revision 1 to Analysis of Nominal Heat Removal Capacity of Crbr in Natural Circulation Mode ML20054H8261982-06-30030 June 1982 SITE-SUITABILITY Report in the Matter of the Clinch River Breeder Reactor Plant.Docket No. 50-537 ML20024E4851982-06-30030 June 1982 Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, Rev D ML20063D4631982-06-30030 June 1982 Site Preparation Activities Rept ML20063G8551982-06-30030 June 1982 Updated Pages for Ref 106 of PSAR Section 1.6,CRBRP-3,Vol 2, Hypothetical Core Disruptive Accident Considerations in Crbr:Assessment of Thermal Margin Beyond Design Base ML20054K9341982-06-30030 June 1982 Speech Entitled Simulation of Lmfbr ML20071E1011982-05-31031 May 1982 LMFBR Program, Fes ML20054G4881982-05-31031 May 1982 Crbr Special Stress & Criteria Considerations, Crbr Engineering Study Rept ML20054G4801982-05-31031 May 1982 Crbr Special Matls Considerations, Crbr Engineering Study Rept ML20054G4651982-05-31031 May 1982 Crbr Matls Data Base, Crbr Engineering Study Rept ML20054F1371982-05-31031 May 1982 Verification of Natural Circulation in Crbr Plant - Update 1984-02-29
[Table view] |
Text
I
.i
., ,, i
. - . _ _ . _ _ - _ _ _ _ _ _ . . ~
. f 1
b' Date ROUTING SLIP i
bO!$Y
. )
fM Y [ffW72f}dG417l Yc'i a
/ , O circuiate g / [/ , 2 coordinate
['g[/F O iatormation !
jj V
, gn comments I
[] /, 7 #
0 >ie s neturn
//g([f.dd/ O s'< 'aiura
_ sW537 pc,'::i:_.
O rise h
" ~" graces 1anorA fot. .
Aun Triston 70Jan Tuslaib 3_.aded %e Mo/c<'an,ed_Gik '
& Adnr1t.9 L <!.ul R:en.
8208090141 820730 PDR ADOCK 05000537 t B PDR Tamhme E t. !
d e //n / 6 . / M o o 55V5 .
BH 1029
'r ,
' ~
j ,.s gh
- f. ,
w y 7) ,. -
~ .
NIjd Department of Energp Washington, D.C. 20545
, Docket No. 50-537 . ."[
j , HQ:S:82:072 ..'3 July 30, 1982 r
1
$ Mr. Paut S. Check, Director CRBR Program Office Office of Nuclear Reactor Regulation .
U.S. Nuclear Regulatory Commission ,
Washington, D.Cf 20555 Dear Mr. Check *. (
3 4
AMENDMENT NO. 69 TO THE PRELIMINARY 3AFETY ANALYSIS REPORT FOR CLINCH RIVER BREEDER REACTOR PLANT ,
The application for a Construction Permit and Class 104(b) Operating License for the Clinch River Brheder Reactor Plant, docketed April 10, 1975., in NRC Docket No. 50-537, is tereby amended by the submission of Amendment No. 69 to the Preliminary Safety Analysis Report pursuant to 50.34(a) of 10 CFR Part 50. t This Amendment No. 69 includes: Responses to NRC requests'for additional information contained in letters dated February 26, March 11, March 15, March 23, March 25, and April 9, 1982; Revisions to Section 2.7, " Seismic Design;"
Section 3.8, " Design of Category I Structures;" Chapter 4, " Reactor;" and other '
updates and revisions. /, ;
A Certificate of Service, confinning service of Amendment'No. 69'to the PSAR upon designated local public officials and representatives of the EPA, will be filed with your office after service has been made. Three signed oriofnals of this letter and 97 copies of this amendment, each with a copy of the submittal letter, are hereby submitted. -
l
^
Sincerely, 3
' -ks.m6 . d ;- Q M l' L John R. Longenecker Acting Director,tffice of the Clinch River Breeder Reactor o Plant Project Enclosure Office of Nuclear Energy
~
i cc: Service List SUBSCRIBED AND SWORN to before me l Standard Distrubution this 22nd day of July 1982.
i '
Licensing Distribution ~- ?
NOTARY PUBLIC QQO 4
S208020697-820730 Py Ccrmission Expires Nov. 14, 1984 b I
W PDR ADOCK 05000537 B PDR
_._ .. ~ ,. .. - . . , . - - . - . . _. - - - - .- --- -- - - - , , -
CCL}ECTEDCOPY Asterfsk Indicates Line Corrected AMENDMENT 69 ff/(
PAGE REPLACEMENT GUIDE o ,
REMOVE THESE PAGES INSERT THESE PAGES Chapter 2 2.5-3a, 4 2.5-3a, 4 2.5-21, 22 2.5-21, 22
- 2.5-23 thru 26 2.5-23, 23a, 23b, 24, 25, 26 2.5-40, 40a, 40b, and 41 2.5-40, 40a, 40b, 41 2.5-61, 62 2.5-61, 62
- 2.5-62e
- 2,5-63 thru 78 2.5-63 thru 77, 77a thru 77d, 78 2.5-109 2.5-109, 109a, 109b, 109c Chapter 3 3.5-9, 10 3.5-9, 10
- 3.5-13, 13a, 13b, 13c 3.5-13, 13a, 13b, 13c 3.5-19, 20 3.5-19, 20 3.7-1, 2, 3, 3a, 3b, 3c, 4, 4a, 5 3.7-1, 2, 2a, 3, 3a, 3b, 3c, 6, 6a 4, 4a. 5, Sa, 6, 6a thru 6d 3.7-9, 9a, 9b, 10 3.7-9, 9a, 9b, 9c, 10 3.7-11, lla 3.7-11, 11a 3.7-17, 18 3.7-17, 18 3.7-21, 22 3.7-21, 22 3.7-24a, 24aa 3.7-24a, 24aa 3.8-7, 7a thru 7d, 8, 9, 9a, 10, 10a 3.8-7, 7a thru 7e, 8, 9, 9a, 10, 10a 3.8-15, 15a, 16, 17, 18 3.8-15, 15a, 16, 17, 18 3.8-20 3.8-20 3.8-29, 30 3.8-29,.29a, 30 3.8-37, 37a 3.8-37, 37a l 3.8-47b, 48 3.8-47b, 48 3.8-56 3 8-56 l
4 3.8-60 3.8A-1, ii, iii 3.8A-1, ii, iii 3.8A-3 thru 6 3.8A-3 thru 6 3.8A-9 thru 12, 12a, 13 3.8A-9, 10, 11, lla, 12, 12a, 12b,13 3.8A-16 thru 19 3.8A-16 thru 19 3.8A-22, 23 3.8A-22, 23
- Section 3.8-D (Last Page 3.8-D3)
Following Page 3.8-C.18 3.9-Ib, Iba, Ibb, Ibe, Ic, thru li 3.9-lb thru lh, iha thru lhl, li 3.9-2, 3, 3a, 3b 3.9-2, 3, 3a, 3b 3.9-9d thru 99, 10, 11 3.9-9d, 9e, 9f,10,11
- 3.9-16, 17 A
) /
D,i
--