Ack Receipt of Requesting Termination of SRO License Due to Personnel Transfer Which Had Occurred on 921214.Informs That Failure to Notify NRC within Thirty Days Has Been Determined as Noncited Violation
ML20058H974
Person / Time
Site: Farley  
Issue date: 12/01/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Kreiger R
SOUTHERN NUCLEAR OPERATING CO.
References
NUDOCS 9312130294
Download: ML20058H974 (3)


Text

t

[

\\

UNITED STATES

['i NUCLEAR REGULATORY COMMISSION i

!.S h j [,E a

REGION V 1450 MARIA LANE WALNUT CREEK, CAUFORNIA 94596-5368 December 1, 1993 Southern California Edison Company P. O. Box 128 San Clemente, CA 92672 Attention:

R. W. Kreiger t

Vice President, Nuclear Generation

SUBJECT:

LICENSED SENIOR OPERATOR REASSIGNMENT AND LICENSE TERMINATION

Dear Mr. Kreiger:

Your letter to the NRC, dated October 26, 1993, requested termination of a l

senior operator license due to a personnel transfer which had occurred on December 14, 1992. Your letter also stated that the notification was late due to an administrative error and that corrective actions have been taken to preclude re-occurrence.

Based on follow-up discussions by Mr. P. Morrill of the NRC and Mr. R.

Sandstrom of your staff, we understand that your corrective actions included (1) adding administrative controls to ensure proper notifications are made when licenses are terminated and (2) checking the need for all other operator licensees. We also understand that the subject senior operator's license was i

inactive at the time of his transfer and that he has not performed licensed duties since that time.

10 CFR 50.74 (a) specifically requires that the Commission be notified within thirty days of permanent reassignment of an operator to a position which no longer requires a license. The NRC was notified ten months after the reassignment, which is a violation of 10 CFR 50.74 (a).

Since (1) the failure to notify the NRC was identified by your staff, (2) the failure to notify has minor safety significance, and (3) this violation was not repetitive, the criteria of 10 CFR 2. App. C. VII. 8, Mitigation of Enforcement Sanctions, apply. Consequently the failure to notify the NRC within thirty days has been determined to be a non-cited level V violation.

If you have any questions, please feel free to contact me or Mr. P. Morrill at (510) 975-0200. Your cooperation is appreciated.

Sincerely,

,1 L. F. Miller, Jr., Chief I

Reactor Safety Branch 9312130294 931201 PDR MISC 9312130294 PDR

2 December 1, 1993 cc:

Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas and Electric Co.

T. E. Oubre, Esq., Southern California Edison Company Chairman, Board of Supervisors, County of San Diego Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power Mr. Don J. Womeldorf, Chief, Environmental Management Branch Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation Mr. Robert G. Lacy, Manager Nuclear Department Mr. Steve Hsu, Radiologic Health Branch Mayor, City of San Clemente 4

i 5

f 3

December 1. 1953 1

bec:

Docket File Project Inspector Resident inspector G. Cook B. Faulkenberry i

State of CA M. Smith l

D. Clevenger t

I i

$ HEY b

MORRILLOlbf LMILLER J

11/24 /93 11/h/93

!'ll/2a/43 REQUEST COPY REQUEST COPY REQUEST COPY t