Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058L215 + (13:19:56, 17 December 2024)
- ML20058L216 + (13:19:56, 17 December 2024)
- ML20058L214 + (13:19:57, 17 December 2024)
- RBG-39532, Provides Summary of Mods to Equipment & Procedure Changes Identified During Rev of Safe Shutdown Analysis,Per Request in NRC Ack Receipt of Util Response to Violation Noted in Insp Rept 50-458/93-09 on 930329-0402 + (13:19:57, 17 December 2024)
- ML20058L212 + (13:19:59, 17 December 2024)
- ML20058L211 + (13:19:59, 17 December 2024)
- ML20058L209 + (13:20:00, 17 December 2024)
- ML20058L210 + (13:20:00, 17 December 2024)
- ML20058L207 + (13:20:01, 17 December 2024)
- ML20058L208 + (13:20:01, 17 December 2024)
- ML20058L204 + (13:20:02, 17 December 2024)
- ML20058L203 + (13:20:02, 17 December 2024)
- ML20058L201 + (13:20:03, 17 December 2024)
- ML20058L198 + (13:20:09, 17 December 2024)
- ML20058L196 + (13:20:10, 17 December 2024)
- 05000327/LER-1990-017, :on 900708,auxiliary Bldg Isolation Initiated. Caused by Random Drift of Setpoint for Switch 1-TS-30-103A. Temp Switch Calibr,Returned to Svc & Recovered from Auxiliary Bldg Isolation + (13:20:11, 17 December 2024)
- ML20058L192 + (13:20:12, 17 December 2024)
- ML20058L190 + (13:20:13, 17 December 2024)
- ML20058L189 + (13:20:14, 17 December 2024)
- ML20058L186 + (13:20:14, 17 December 2024)
- ML20058L184 + (13:20:15, 17 December 2024)
- ML20058L182 + (13:20:15, 17 December 2024)
- ML20058L181 + (13:20:16, 17 December 2024)
- ML20058L179 + (13:20:17, 17 December 2024)
- ML20058L176 + (13:20:18, 17 December 2024)
- ML20058L178 + (13:20:18, 17 December 2024)
- ML20058L174 + (13:20:19, 17 December 2024)
- ML20058L175 + (13:20:19, 17 December 2024)
- ML20058L173 + (13:20:20, 17 December 2024)
- ML20058L172 + (13:20:20, 17 December 2024)
- ML20058L171 + (13:20:21, 17 December 2024)
- ML20058L170 + (13:20:22, 17 December 2024)
- ML20058L168 + (13:20:23, 17 December 2024)
- ML20058L167 + (13:20:23, 17 December 2024)
- ML20058L166 + (13:20:24, 17 December 2024)
- ML20058L164 + (13:20:25, 17 December 2024)
- ML20058L165 + (13:20:25, 17 December 2024)
- ML20058L163 + (13:20:26, 17 December 2024)
- ML20058L162 + (13:20:27, 17 December 2024)
- ML20058L160 + (13:20:28, 17 December 2024)
- PY-CEI-NRR-1196, Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan + (13:20:28, 17 December 2024)
- ML20058L158 + (13:20:30, 17 December 2024)
- ML20058L157 + (13:20:30, 17 December 2024)
- 05000498/LER-1990-016, :on 900616,reactor Trip Initiated When 2 of 4 Coincidence Satisfied on Over Temp/Delta Temp.Caused by Less than Adequate Attention to Decreasing Margin to Over Temp/ Delta Temp Trip Setpoint.Procedures Revised + (13:20:32, 17 December 2024)
- TXX-9027, Responds to NRC Re Violations Noted in Insp Repts 50-445/90-19 & 50-446/90-19.Corrective Action:Specific Activity within Tech Spec Limits.No Further Corrective Action Required + (13:20:33, 17 December 2024)
- ML20058L152 + (13:20:34, 17 December 2024)
- ML20058L151 + (13:20:36, 17 December 2024)
- ML20058L149 + (13:20:37, 17 December 2024)
- ML20058L145 + (13:20:38, 17 December 2024)
- ML20058L147 + (13:20:38, 17 December 2024)
- B13603, Withdraws 900731 Request for Temporary Waiver of Compliance W/Tech Spec 3.7.1.2 Re Inoperability of Auxiliary Feedwater Pumps + (13:20:39, 17 December 2024)
- 05000213/LER-1990-008, :on 900709,engineering Evaluation Determined That Design Deficiency Existed That Could Disable Both Centrifugal Charging Pumps During Hypothetical Loca.Check Valves Installed in Each Charging Pump + (13:20:41, 17 December 2024)