Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20059B428 + (08:29:26, 17 December 2024)
- ML20059B427 + (08:29:26, 17 December 2024)
- IR 05000413/1993030 + (08:29:27, 17 December 2024)
- ML20059B425 + (08:29:28, 17 December 2024)
- ML20059B423 + (08:29:31, 17 December 2024)
- JPN-93-090, Proposed Tech Specs Eliminating Inconsistency Between RCS Leakage Detection & Operability Requirements in LCOs 3.6.D.1 & 3.6.D.4 + (08:29:32, 17 December 2024)
- ML20059B420 + (08:29:32, 17 December 2024)
- ML20059B418 + (08:29:33, 17 December 2024)
- B14634, Informs NRC of Process Used by Licensee to Comply W/ Provisions of 10CFR26,App A,Part 2.3(2) + (08:29:34, 17 December 2024)
- ML20059B416 + (08:29:35, 17 December 2024)
- ML20059B415 + (08:29:35, 17 December 2024)
- ML20059B414 + (08:29:38, 17 December 2024)
- ML20059B412 + (08:29:39, 17 December 2024)
- PNO-IV-93-030, on 931021,licensee Reported Lost Pu-beryllium Sealed Source.Licensee Plans to Remove All Neutron Sources from Storage Facility & Conduct Survey to Determine If Missing Source in Storage Bunker + (08:29:40, 17 December 2024)
- ML20059B409 + (08:29:41, 17 December 2024)
- HL-4433, Forwards Revs to Relief Requests RR-V-17,RR-V-19,RR-V-20, RR-V-32,RR-V-40 & RR-V-41,providing Addl Info as Discussed in 930901 Telcon Re Second 10-yr Insp Interval IST Program + (08:29:42, 17 December 2024)
- ML20059B408 + (08:29:42, 17 December 2024)
- IR 05000456/1990013 + (08:30:01, 17 December 2024)
- LG-90-025, Effluent Monitoring Rept for Jan-June 1990 + (08:30:02, 17 December 2024)
- 05000266/LER-1990-009, :on 900723,reactor Protection Sys Actuation Occurred.Caused by Fuse Failure.Failed Fuse & Fuse in Circuit Replaced + (08:30:04, 17 December 2024)
- ML20059B400 + (08:30:06, 17 December 2024)
- 05000313/LER-1990-006, :on 900720,discovered motor-operated Valves & Actuators Located Below Current Accident Flood Elevation W/O Being Qualified for Submergence.Caused by Personnel Error. Change Initiated to Replace Components + (08:30:07, 17 December 2024)
- ML20059B397 + (08:30:09, 17 December 2024)
- ML20059B396 + (08:30:10, 17 December 2024)
- ML20059B395 + (08:30:11, 17 December 2024)
- ML20059B394 + (08:30:12, 17 December 2024)
- ML20059B390 + (08:30:13, 17 December 2024)
- PNO-I-93-075, on 931228,personnel at Plant Observed Smoke Emanating from Area Between Remaining Lower Portion of Reactor Vessel & Biological Shield at About 78 Elevation + (08:30:16, 17 December 2024)
- ML20059B388 + (08:30:17, 17 December 2024)
- ML20059B387 + (08:30:18, 17 December 2024)
- ML20059B381 + (08:30:19, 17 December 2024)
- ML20059B379 + (08:30:21, 17 December 2024)
- ML20059B375 + (08:30:23, 17 December 2024)
- ML20059B376 + (08:30:23, 17 December 2024)
- ML20059B374 + (08:30:25, 17 December 2024)
- IR 05000498/1993046 + (08:30:27, 17 December 2024)
- PNO-II-93-073B, provides Update to Info Previously Provided by State of Fl Re Misadministration Using microselectron-HDR Device.State of Fl Has Drawn Listed Conclusions as Result of State Investigation + (08:30:28, 17 December 2024)
- ML20059B369 + (08:30:28, 17 December 2024)
- ML20059B364 + (08:30:30, 17 December 2024)
- ML20059B362 + (08:30:31, 17 December 2024)
- ML20059B361 + (08:30:32, 17 December 2024)
- ML20059B359 + (08:30:33, 17 December 2024)
- ML20059B360 + (08:30:33, 17 December 2024)
- ML20059B358 + (08:30:34, 17 December 2024)
- ML20059B357 + (08:30:34, 17 December 2024)
- ML20059B356 + (08:30:35, 17 December 2024)
- ML20059B353 + (08:30:36, 17 December 2024)
- ML20059B352 + (08:30:37, 17 December 2024)
- IR 05000331/1993017 + (08:30:43, 17 December 2024)
- IR 05000354/1991080 + (08:30:44, 17 December 2024)
- ML20059B349 + (08:30:45, 17 December 2024)