Forwards Application for Amend to License DPR-59,proposing Changes to TS to Eliminate Inconsistency Between RCS Leakage Detection & Operability Requirements in LCOs 3.6.D.1 & 3.6.D.4
ML20059B395
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/29/1993
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059B398 List:
References
JPN-93-090, JPN-93-90, JPTS-92-031, JPTS-92-31, NUDOCS 9401040113
Download: ML20059B395 (2)


Text

Wiy h.) ' , ,

h , "Si ,

h; N , . ^*

  • 123 IJmn Street 1 .

While P!Ains, New York 10601 '

f 4 *

'* S14 681 6846 a,' ..

p.-

  1. > NewYorkPower
  • Ralph E. eeedle M;. Authority -

Execut~e vice eresident Nuciear Generabon  ;

December 29,1993 l JPN-93-090 m >

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk -

Mail Station P1-137  !

Washington, D.C. 20555

SUBJECT:

James A. FitzPatrick Nuclear Power Plant h Docket No. 50-333 ,

Proposed Change to the Technical Specifications '

RCS Laak Detection LCO - (JPTS-92-031)

L

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical Specifications proposes a change to eliminate an inconsistency between the ag Reactnr Coolant System (RCS) leakage detection and operability requirements in ,

" 'S Linsting Conditions for Operation (LCO) 3.6.D.1 and 3.6.D.4.

m

, LCOl6.D.1 currently requires that RCS leakage be below specified limits when there is irradiated fuel in the reactor vessel and reactor coolant temperatura is greater than 212*F. LCO 3.6.D.4 requires.the leakage monitof..ig .

s'/ stems to be operable during power operation (i.e., when the mode switch is in the Startup/ Hot Standby position or the nun position with the reactor critical above 1 percent rated power, as defined per Specification 1.0.O). These two

, LCOs are not consistent. The proposed revision of LCO 3.6.D.4 will take the '

more conservative' approach of requiring the laakage monitoring systems to be f operable when the leakage limits of LCO 3.6.D.1 are in effect. ,

The proposed changes also make editorial corrections which are considered administrative in nature. These will improve the overall quality and consistency within the Technical Specifications.

The signed criginal of the Application for Amendment to Operating License is enclosed for filing. Attachments I, ll and lit to this application contain the proposed changes to the Technical Specifications, the associated Safety Evaluation and a markup of the affected Technical Specifications pages.

3; '

A copy of this application and the associated attachments are being provided to the designated New York State officialin accordance with 10 CFR 50.91.  :

03n f o ,i 9401040i13 931229 #

es.

'PDR p.

AD)CK 05000333 M- ' 4Nd/~

PDR (T

. I II

if . I' i.

['.. '_/., a4 g If you have any questions, please contact Mr. J. A. Gray, Jr. l Very truly y urs,-

g4N ' .cr her.

tj5 ee ,

/

att: as stated {

cc: U.S. Nuclear Regulatory Commission ,

475 Allendale Road {

King of Prussia, PA 19406 Office of the Resident inspector ,

U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093

, s Mr. Brian C. McCabe Project Directorate 1-1

. Division of Reactor Projects - 1/11 U.S. Nuclear Regulatory Commission Mail Stop 14 B2 Washington, DC 20555 Ms. Donna Ross New York _ State Energy Office 2 Empire State Plaza 16" Floor Albany, NY 12223 c.