Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-13-205, Final Deficiency Rept DR-31 Re Loose Mounting Screws or Fasteners Used to Assemble or Mount Position Switch Assembly on Limitorque Valve Motor Operators.Initially Reported on 811211.Limit Switches to Be Restored + (03:16:30, 17 December 2024)
- 05000267/LER-1982-030-03, /03L-0:on 820719,total Primary Coolant Oxidants Exceeded Tech Specs Twice.Caused by Offgassing of Moisture Due to Increasing Temp During Recovery from Reactor Scram + (03:16:31, 17 December 2024)
- 05000267/LER-1982-030, Forwards LER 82-030/03L-0.Detailed Event Analysis Encl + (03:16:32, 17 December 2024)
- JSP-006-94, Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition + (03:16:34, 17 December 2024)
- ML20062P070 + (03:16:34, 17 December 2024)
- RBG-13-211, Interim Deficiency Rept Re HPCS Diesel Generator Radioactive Heat Loss Value.Initially Reported on 820212.Util Awaiting Info from GE Re Cause of Deficiency & Necessary Corrective Actions.Next Rept Expected by 821028 + (03:16:35, 17 December 2024)
- ML20062P044 + (03:16:36, 17 December 2024)
- ML20062P058 + (03:16:36, 17 December 2024)
- ML20062P033 + (03:16:37, 17 December 2024)
- ML20062P011 + (03:16:38, 17 December 2024)
- ML20062N991 + (03:16:39, 17 December 2024)
- NG-93-5376, Forwards DAEC ASME Section XI ISI Summary Rept RFO 12 for Period from 920428-931013 + (03:16:39, 17 December 2024)
- 05000261/LER-1981-008-03, /03L-0:on 810225 While Performing Monthly Periodic Test CPL-PT-5.5,Hagan Signal Comparator Module Found Inoperable.Cause Not Stated.Comparator Replaced + (03:16:41, 17 December 2024)
- 05000261/LER-1981-008, Forwards LER 81-008/03L-0 + (03:16:42, 17 December 2024)
- ML20062N946 + (03:16:42, 17 December 2024)
- ML20062N925 + (03:16:44, 17 December 2024)
- ML20062N917 + (03:16:45, 17 December 2024)
- BSEP-94-0005, Provides Info Discussed W/Nrc During 931221 Telcon Re Unit 1 Shroud Clamp Bolt Bending Stresses & Max Allowable Bolt pre- Load + (03:16:46, 17 December 2024)
- ML20062N912 + (03:16:46, 17 December 2024)
- ML20062N901 + (03:16:47, 17 December 2024)
- ML20062N890 + (03:16:49, 17 December 2024)
- ML20062N887 + (03:16:50, 17 December 2024)
- ML20062N883 + (03:16:51, 17 December 2024)
- ML20062N880 + (03:16:52, 17 December 2024)
- ML20062N873 + (03:16:52, 17 December 2024)
- ML20062N869 + (03:16:53, 17 December 2024)
- PY-CEI-NRR-1733, Monthly Operating Rept for Dec 1993 for Perry Nuclear Power Plant,Unit 1 + (03:16:54, 17 December 2024)
- ML20062N863 + (03:16:54, 17 December 2024)
- ML20062N860 + (03:16:55, 17 December 2024)
- ML20062N859 + (03:16:56, 17 December 2024)
- ML20062N854 + (03:16:56, 17 December 2024)
- ML20062N848 + (03:16:57, 17 December 2024)
- ML20062N847 + (03:16:58, 17 December 2024)
- ML20062N845 + (03:16:58, 17 December 2024)
- ML20062N843 + (03:16:59, 17 December 2024)
- ML20062N841 + (03:16:59, 17 December 2024)
- ML20062N836 + (03:17:00, 17 December 2024)
- ML20062N840 + (03:17:00, 17 December 2024)
- ML20062N830 + (03:17:01, 17 December 2024)
- ML20062N831 + (03:17:01, 17 December 2024)
- ML20062N826 + (03:17:02, 17 December 2024)
- ML20062N825 + (03:17:03, 17 December 2024)
- 05000333/LER-1982-033-03, /03L-0:on 820706,reserve Power Breaker 10022 Was Open for Approx 4 Minutes,Rendering Light House Hill Line 3 Unavailable.Caused by Lightning Strike.No Corrective Action Required + (03:17:05, 17 December 2024)
- ML20062N821 + (03:17:06, 17 December 2024)
- ML20062N819 + (03:17:06, 17 December 2024)
- 05000333/LER-1982-033, Forwards LER 82-033/03L-0 + (03:17:07, 17 December 2024)
- ML20062N814 + (03:17:07, 17 December 2024)
- ML20062N809 + (03:17:08, 17 December 2024)
- ML20062N808 + (03:17:08, 17 December 2024)
- ML20062N806 + (03:17:09, 17 December 2024)
- 1CAN088205, Advises That Supplemental ECCS Calculations Will Be Provided by 830215,in Response to 820713 Request.Calculations Address Potential Impact of Cladding Models in NUREG-0630 on B&W ECCS Calculations + (03:17:10, 17 December 2024)
- ML20062N802 + (03:17:10, 17 December 2024)