ML20062P058

From kanterella
Jump to navigation Jump to search
Amends 81 & 75 to Licenses DPR-29 & DPR-30,respectively, Replacing Water Quality Requirements W/Environ Protection Plan
ML20062P058
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/06/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Commonwealth Edison Co, Iowa Illinois Gas & Electric Company
Shared Package
ML20062P060 List:
References
DPR-29-A-081, DPR-30-A-075 NUDOCS 8208240046
Download: ML20062P058 (18)


Text

pg.

~ ~ ~~L pen UNITED STATES

[

}

NUCLEAR REGULATORY COMMISSION 7;

p WASHINGTON, D. C. 20555 4

4

%,*****/

COMMONWEALTH EDISON COMPANY AND 10WA4 ILLINOIS GAS AND ELECTRIC COMPANY DOCKET NO. 50-254 OUAD CITIES STATION UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 81 License No. DPR-29 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated July 16, 1981 complies with standards and a5 /b 67.

=: requirements ofnthe-Atomic Energy Act ofJ.1954, as. amended.(the.Act), N p r.;.-

L..

r= " g ~and the Comission's rules and regulations set forth in 10 CFRf ~

~~ C -

4 ':

Chapter I;

~

B.

The facility will operate ih conformity dith the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There i-s reasonable assurance (i) that the activities authorized

-~

by this amendment can be conducted without endangering the health

,, and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common l

defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part l

51 of the Commission's regulations and all applicable requirements l

have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Spec-ifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility License No. DPR-29 is hereby amended to read as follows:

B.

Technical Specifications

~

~~~

~

-a f

The. Technical Specifications contained.in Appendices A and B l

(Environmental Protection Plan), as revised through Amendment No.81 are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

8 20 8 24 0 0 9 fa 1

{i..

~

3 L: _.

2 This license ahndment is effective as of the date of issuance.

3.

FOR THE fi '1 EAR REGULATORY COMMISS10ft L.

Domenic B. Vassal o, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Appendix B Technical SpeiifiFations Dpte of Issuance: August 6,1982 Q&;..jju ~~ijk x : ~".C_',e.-.=+----'=-.----:

-. T. N :-;=y : ~: ~ =.

g.-.,

r e

I i

8 6

9 R

W ATTACHMENT TO LICENSE AMENDMENT NO. 81 TO FACILITY OPERATING LICENSE N0. DPR-29 DOCKET N0. 50-254 Revise Appendix B as follows:

Remove Pages Insert Pages Appendix B Title sheet Appendix B Title sheet i

1-1 ii 2-1 El.1/2.1-1 2-2 E1.1/2.1-2 2-3 El.1/2.1-3 3-1 El.2/2.2-1 El 2/2.2-2 ~

Figure 2.2-1 El.3/2.3-1 El.3/2.3-2 El.4/2.4-1 El.4/2.4-2 E3.1-1 9

W

]

y v.

~

. g..

M eM4-A APPENDIX B-i TO FACILITY OPERATING LICENSE NO. DPR-29 QUAD CITIES STATION UNIT 1 COMMONWEALTH EDISON COMPANY.,.-

m.

g ~.

e,.,

. E f' *n. n._ --- % f-: m..g....,;..,,7..: DOCKET NO.~~.

50-254T'."50 ~ ??

-t* 1 W~24 7:'T2;

... ~.

..m p =A.;r ;

-.. a f.-.

7-;

e M

J l

f ENVIRONMENTAL PROTECTION PLAN i

(NON-RADIOLOGICAL) l, e

o*

e 9

9 V

-y -

3

_r,

~.:. 2.

~

Objectives of the Environmental Protection Plan

1. 0 The Environmental Protection Plan (EPP) is to provide for pr,otection of environmental values during construction and operation of the nuclear facility, e

The principal objectives of the EPP are as follows:

(1)

Verify that the plant is operated in'an environmer. tally acceptable manner, as established by the FES and other NRC environmental impact assessments.

(2)

Coordinate NRC requirements and maintain consistency with other Federal,

.-- State and local requirements for environmental protection.

..__u...

~, : - _=.....

q L;. w -;. gr.r y..

.L T.=;;c

-- - 2 n

--r.

...,. ~

n

._r (3)

Keep NRC informed of the environmental effects of facility constructior}

and operation and of actions taken to control those effects.

Environmental concerns identified in the FES which relate to water quality matters are ' regulated by way of tfie licensee's flat [ional Pollutant Discharoe E-limination-(i!PDES) permit, issued by the Illinois Environmental Protection' Agency.

i e,

9 1

l L

1-1

7-es 2.0 Consistency Requirements 2.1 Plant Design an'd Operation o

The licensee may make chang,es in station design or operation or perform tests or experiments affecting the environment provided such changes, tests or experiments do not involve an unreviewed environmental question.

Changes in plant design or operation or performance of tests or experiements which do not affect the environment aie not subject to this requirement.

Activities governed by Section 2.3 are not subject to the requirements of this section.

Before engaging in unauthorized construction or operational activities which may affect the environment, the licensee shall prepare and record an en iron-mental evaluation of such activity.* When the. evaluation indicates that such

. activityinvolvesanunreviewedenviron'mentalquestion,thelicensee,shall; provide a written evaluation of such activities and obtain prior approval.,',

3

~

~

from the NRC.

1 l

A proposed change, test or experiment shall be deemed to involve an unreviewed i

environmental question if it concerns (1) a matter which may result in a significant increase in any adverse environmental impact previously evaluated in the final environmental statement (FES) as modified by staff's testimony to the Atomic Safety and Licensing Board, supplements to the FES, environmental

~

impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; or (2) a significant change in effluents or power level (in accordance with'10 CFR Part 51.5(b)(2)) or (3) a matter not previously reviewed and evaluated in the documents specified in.(1) of this Subsection, which may have a significant adverse environmental impact.

  • Activities are excluded from this requirement if all measurable nonradioloaical

~

effects are confined to the on-site areas previously disturbed during site pre;:aration and plant constructicn.

~

The licensee shall maintain records of changes in facility design or operation and of tests and ex'periments carried our pursuant to this Subsection. These records shall include a written evaluation which provide bases for the determination that the change, test, or experiment does not involve an unreviewed environmental question.

2.2 Reporting Related to the NPDES Permits and State Certifications Violations of the NPDES Permit or the State certification (pursuant to Section 401 of the Clean Water Act) shall be reported to the NRC by submittal

~

of copies of the reports required by the NPDES Permit or' certification.

The i

~

licen'see shall also provide the NRC with copies of the results of environmental studies at the same time they are submitted to the pe_rmitting agency.

~

Changes and additions to the NPDES Permit or the State certification shall bereportedtotheNRCwithin30daysfollowingthedatethechangeisapproveh, If a permit or certification, in part or in its entirety, is appealed and stayed, the NRC shall be notified within 30 days following the date the stay is granted.

The NRC shall be notified of changes to the effective NPDES Permit proposed by the licensee by providing NRC with a copy of the proposed change at the same time it is submitted to the permitting agency.

The licansee shall provide the fRC a copy of the application for renewal of the NPDES Permit.

l at the same time the application is submitted to the permitting agency.

1 2-2 l

...2 C...

2.3 Changes Required for Compliance with Other Environmental Regulations Changes in plant design or operation and performance of tests or expert-ments which are required to achieve compliance with other FAderal, State, or local environmental regulations are not subject to the requirements of Section 2.1.

e 0

0 e

e 9

/

e, e

/

S 6

O e

2-3

3.0 Environmental Conditions 3.1 Uqusual or Impor. tant Environmental Events Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to station D

operation shall be recorded and promptly reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> followed by a written report within 30 days.

No routine monitoring programs are required to implement this conditions.

The written report shall (a) describe, analyze, and evaluate the event, including extent and magnitude of the impact and plant operating charac-teristics, (b) describe the probable cause of the event, (c) indicate the

^

action taken to correct the reported event, (d) indicate the' corrective action taken to preclude repetition of the even't and to prevent similar occurrences involving similar components or systems, and (e) indicati the l

agencies notified and their preliminary responses.

4-Events r'eportable under this subsection which also require reports to other Federal, State or local agencies shall be reported in accordance with those reporting requirements in lieu of the requirements of this subsection.

The NRC shall be provided a copy of such report at the same time it is submitted to the other agency.

I The following are examples of unusual or important events:

excessive bird impaction events; onsite plant or animal disease outbreaks; mortality or-unusual occurrence of any species protected by the Endangered Species Act 1

of 1973; unusual fish kills; increase in nuisance organisms or conditions; and unanticipated or emergency discharge of waste water or chemical substances.

l 3-1

,e

g.....

jP" UNITED STATES p"

NUCLEAR REGULATORY COMMISSION 5

g WASHINGTON, D. C. 20556

?,,

e K*****,$'.

COMMONWEALTH EDISON COMPANY AND IDWA-ILLIN0IS GAS AND ELECTRIC COMPANY DOCKET NO. 50-265 OVAD CITIES STATION UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENCE Amendment No. 75 License No. DPR-30 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated July 16, 1981 complies with standards and m Na_=r requirements of-the Atomic Ener f 1954,~as amended (the Act),

Jand the~ Commission'i rules a'nd.'gy Act o. g61ations set forth in 10 CFR M..z re

.g, B.

The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common

~

defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

l 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amend-ment, and paragraph 3.B of Facility Operating License No. DPR-30 is hereby amended to read as follows:

Technical' Specifications B.

The. Technical Specifications contained.in Appendices A and B (Environmental Protection Plan), as revised through Amendment No. 75 are hereby incorporated in the license. The licensee shall operate l

the facility in accordance with the Technical Specifications.

l l

W. =....

[~Z.~

3.

This license amendment is effective as of the date of issuance.

FOR THE NU EAR REGULATORY COMMISSION Domenic B. Vass lo, Chief Operating React rs Branch #2 Division of Licensing

Attachment:

Changes to the Appendix B Technical Specifications

~

Date of Issuance: Atiigust 6,1982

.. ~ r.

.~

._.3,,

4, 5-v - T * *~{[ ' V~ '

_. ~ ~. [' W' ~ T~.'

  • ~^

~~Y.

.W y

S

=

s e

l l

J"

'e a

4

7 i 1: ~

1

- ATTACHMENT TO LICENSE AMENDMENT NO. 75 TO FACILITY OPERATING LICENSE NO. DPR-30 DOCKET NO. 50-265~

Revise Appendix B as follows:

Remove Pages Insert Pages Appendix B Title sheet Appendix B Title sheet i

1-1 ii 2-1 El.1/2.1-1 2-2 El.1/2.1-2 2-3 El.1/2.1-3 3-1 El.2/2.2-1.___

El.2/2.2-2 l

".5= w

-.._.. _. _ _ ~

w "- '--

Figure 2.2-1___.

._ m

... :._. *r-

- u._-

"~ "I

~

El.3/2.3-1 W"~,..

>~"

" I "

~ ~ -~ " ~ ~ ~ ' ' ~

~-

El.3/2.3-2

~

El.4/2.4-1 El.4/2.4-2

~

E3.1-1 O

(

i e

O?

r f

p,...,..

h_

g;._... _

L.

APPENDIX B 8

8 TO FACILITY OPERATIt!G LICENSE N0. DPR-30 i

QUAD CITIES STATION 1

I UNIT 2 I

l l

COMMONWEALTH EDIS0N COMPANY m%ls...

' -n

(%. ? -...,.. -

..".n.->-.....-:

50-265 %.."..

.7 '.1, t 3- ~. -- n.
-. a..&:,h,. *-

..= '.2 : = -

e,c

~;.. 1. ~.. m..,,;.x

.y

. ~.

r,-

,;- cDOCKET.NO.'

[g;.;.;; _ _..

~~ ~

v

~-

. ~;.

\\.

ee 1,'

t, i

I

  • e e

~

ENVIRONMENTAL PROTECTION PLAN (NON-RADIOLOGICAL) e b

O

/

e 9

4 4

~$.

[

1.0 Objectives of the Environmental Protection Plan The Environm. ental Protection Plan (EPR) is to provide for pro'tection of environmental values during construction and operation of the nuclear facility.

The principal objectives of the EPP are as follows:

(1)

Verify that the plant is operated in an environmentally acceptable manner, as established by the FES and other NRC environmental impact assessments.

(2)

Coordinate NRC requirements and maintain consistency with other Federal, State and local requirements for environmental protection..

y.

x=p ".

,.. c:

~

. c=

-(3)

Keep NRC informed of the environmental effec-ts of facility construction.

and operation and of actions taken to control those effects.

s Environm' ental concerns identified in the FES which relate to water quality matters are regulated by wdy of the licensee's National Pollutant Discharge Elimination System (NPDES) permit, issued by the Illinois Environmental Protection Agency.

e G

e e

9 1-1

e.u

'.0 Consistency Requirements

~~

2 2.1 Plant Design and Operation The licensee may make changes in station design or operation ~or perform tests orexperimentsaffectingtheenhironmentprovidedsuchchanges,testsor experiments do not involve an unreviewed environmental question.

Changes in plant design or operation or performance of tests or experiements which do not affect the environment a're not subject to this requirement.

Activities governed by Section 2.3 are not subject to 'the requirements of this section.

3 Beforeengaginginunauthorizedconstructionoroperationalactihitieswhich

(,

e may affect the environment, the licensee shall prepare and record an environ-E mentalehaluationofsuchactivity.* When the. evaluation indicates that such activity involves an unreviewed environmental question, the licensee,shall 3

provide a written e aluation of such activities and obtain prior approval,

'fromthet}RC.

A proposed change, test or experiment shall be deemed to involve an unreviewed environmental question if it concerns (1) a matter which may result in a-significantincreaseinanyadverseenvironmentalimpactpreviouslyehaluated'

~

in the final environmental statement (FES) as modified by staff's testimony to the Atomic Safety and Licensing Board, supplements to the FES, environmental impact appraisals, or in any decisions of the Atcmic Safety and Licensing Board; or (2) a significant change in effluents or power level (in accordance-with-10 CFP, Part 51.5(b)(2)) or (3) a matter not previously reviewed and evaluatedinthedocumentsspecifiedin.(1)ofthisSubsection,whichmayhaYe a significant adverse environmental impact.

" Activities are excluded from this requirement if all measurable nonradiological effects are confined to the on-site areas previously' disturbed during site

re:aration and plant constructione

L v.:

~

The licensee shall maintain records of changes in facility design or operation and of tests and experiments carried our pursuant to this Subsection. These.

records shall include a written evaluation which provide bases for the determination that the chan'ge, test, or experiment does not involve an unreviewed environmental question.

2.2 Reporting Related to the NPDES Permits and State Certifications Violations of the NPDES Permit or the State certification (pursuant to Section 401 of the Clean Water Act) shall be reported to the NRC by submittal of copies of the reports required by the NPDES Permit or' certification. The

,i

~

~

licensee shall also provide the NRC with~ copies of th'e results of environmental studies at the same time they are submitted to tire permitting agency.

~

Changes and additions to the NPDES Permit or the State certification shall.

be reported to the NRC within 30 days following the date the change is approv Tf a permit or certification, in part or in its entirety, is appealed' and stayed, the NRC shall be notified within 30 days following the date the l

stay is granted.

The NRC shall be notified of changes to the effective NPDES Permit proposed l

by the licensee by providing NRC with a copy of the proposed change at the l

same time it is submitted to the permitting agency.

The licensee shall provide the NRC a copy of the application for renewal of the NPDES Permit l

at the same time the application is submitted to the permitting agency.

l l

l 2-2

= _ _ _

q, 2.3 Changes Required for Compliance with Other Environmental Regulations Changes in plant design or operation and perfomance of tests or experi-

- c ments which are required to achieve compliance with other F5deral, State, i

or local environmental regulations are not subject to the requirements of Section 2.1.

e e

0 e

e e

'~

G g

e me 4

e 2

-[,

l i

O l

l l

G I

2-3

~

3.0 Environmental Conditions l

3.1 Unusual or Important Environmental Events An'y occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to station operation shall be recorded and promptly reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> followed by a written report within 30 days.

No routine monitoring programs are required to implement this conditions.

The written report shall (a) describe, analyze, and evaluate the event, including extent and magnitude of the impact and plant operating charac-teristics, (b) describe the probable cause of the event, (c) indicate the action taken to correct the reported event,'.(d) indicate the' corrective

~

preclude repetition of the even't and to prevent similar action taken to occurrences involving similar components or systems, and (e) indicati the agencies notified and their preliminary responses.

4' Events reportable under this subsection which also require reports to other Federal, State or local agencies shall be reported in accordance with those The reporting requirements in lieu of the requirements of this subsection.

NRC shall be provided a copy of such report at the same time it is submitted to the other agency.

excessive bird The follow-ing are examples of unusual or important events:

impaction events; onsite plant or animal disease outbreaks; mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973; unusual fish kills; increase in nuisance organisms or conditions; and unanticipated or emergency discharge of waste water or chemical substances.

3-1

.a

-