Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063C254 + (03:08:47, 17 December 2024)
- 05000324/LER-1982-099, Forwards LER 82-099/01T-0 + (03:08:48, 17 December 2024)
- 05000220/LER-1982-010, Forwards LER 82-010/03L-0 + (03:08:48, 17 December 2024)
- ML20063C240 + (03:08:49, 17 December 2024)
- ML20063C242 + (03:08:49, 17 December 2024)
- 05000366/LER-1982-076-03, /03L-0:on 820629,torus Water Level Recorder Found Inoperable During Steady State Full Power Operation.Caused by Component Failure.Differential Pressure Transmitter Equalizing Valve in Valve Manifold Replaced + (03:08:51, 17 December 2024)
- ML20063C235 + (03:08:52, 17 December 2024)
- ML20063C224 + (03:08:53, 17 December 2024)
- ML20063C230 + (03:08:53, 17 December 2024)
- 05000366/LER-1982-076, Forwards LER 82-076/03L-0 + (03:08:54, 17 December 2024)
- ML20063C217 + (03:08:54, 17 December 2024)
- ML20063C206 + (03:08:55, 17 December 2024)
- ML20063C200 + (03:08:59, 17 December 2024)
- ML20063C198 + (03:09:00, 17 December 2024)
- ML20063C191 + (03:09:01, 17 December 2024)
- L-82-354, Final Deficiency Rept Re Contacts Not Reversing Position Upon Operation of Switches.Initially Reported on 820623. Switches Returned to Vendor for Rechecking.Pertinent Documentation Maintained at Site.Not Reportable Per 10CFR50 + (03:09:01, 17 December 2024)
- ML20063C189 + (03:09:02, 17 December 2024)
- ML20063C180 + (03:09:02, 17 December 2024)
- ML20063C174 + (03:09:03, 17 December 2024)
- ML20063C173 + (03:09:05, 17 December 2024)
- ML20063C172 + (03:09:05, 17 December 2024)
- ML20063C168 + (03:09:06, 17 December 2024)
- ML20063C170 + (03:09:06, 17 December 2024)
- 05000259/LER-1982-053, Forwards LER 82-053/01T-0 + (03:09:10, 17 December 2024)
- 05000260/LER-1982-025-03, /03L-0:on 820719,during Startup,Relay Coil Failed, Resulting in Partial Primary Containment Isolation.Caused by Burned Out Coil Relay,Causing Relay to Fail in Safe Direction for Primary Containment Isolation + (03:09:11, 17 December 2024)
- ML20063C144 + (03:09:12, 17 December 2024)
- 05000260/LER-1982-025, Forwards LER 82-025/03L-0 + (03:09:13, 17 December 2024)
- ML20063C141 + (03:09:13, 17 December 2024)
- ML20063C131 + (03:09:15, 17 December 2024)
- ML20063C125 + (03:09:16, 17 December 2024)
- ML20063C119 + (03:09:17, 17 December 2024)
- ML20063C092 + (03:09:18, 17 December 2024)
- ML20063C051 + (03:09:19, 17 December 2024)
- ML20063C049 + (03:09:19, 17 December 2024)
- ML20063C043 + (03:09:20, 17 December 2024)
- ML20063C035 + (03:09:21, 17 December 2024)
- ML20063C012 + (03:09:22, 17 December 2024)
- 05000317/LER-1981-028-04, /04T-0:on 810423,drain Valve for Waste Neutralizing Tank 11 Discovered Open.Caused by Failure of Operators to Follow Procedures.Involved Operators Disciplined + (03:09:23, 17 December 2024)
- 05000317/LER-1981-028, Forwards LER 81-028/04T-0 + (03:09:24, 17 December 2024)
- ML20063B991 + (03:09:25, 17 December 2024)
- ML20063B982 + (03:09:28, 17 December 2024)
- 0CAN019408, Informs That in Order to Implement New 10CFR20 Requirements, Listed Changes to ERDS Data Point Library Implemented on 931231 + (03:09:29, 17 December 2024)
- ML20063B979 + (03:09:29, 17 December 2024)
- ML20063B973 + (03:09:30, 17 December 2024)
- BSEP-94-0017, Forwards Response to NRC Re Violation Noted in Insp Repts 50-324/93-52 & 50-325/93-52.Corrective Actions: Suppl Entries Made to Operations Shift Logs to Provide Adequate Detail for Event + (03:09:31, 17 December 2024)
- TXX-9343, Submits Response to Violations Noted in Insp Repts 50-445/93-41 & 50-446/93-41 & Proposed Imposition of Civil Penalty in Amount of $50,000.Corrective Actions:Licensee Failed to Assure That Design Basis Correctly Translated + (03:09:31, 17 December 2024)
- ML20063B947 + (03:09:32, 17 December 2024)
- ML20063B951 + (03:09:32, 17 December 2024)
- ML20063B946 + (03:09:33, 17 December 2024)
- NG-94-0018, Application for Amend to License DPR-49,consisting of RTS-265 to Change Ielp to Ies Utilities & Title of Manager- Nuclear Div to Vice President,Nuclear + (03:09:34, 17 December 2024)
- U-602240, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/93-23.Corrective Actions:Tent Const Completed & Filtered Ventilation Established Prior to Allowing Addl Work in Response to 931008 TS Violation + (03:09:34, 17 December 2024)
- BSEP-94-0018, Forwards Description of Util Hardware Mod Designed to Satisfy Requested Actions of NRC Bulletin 93-003.Util Reviewed NRC Info Notice 93-089 & Determined Design Problems Do Not Apply to Facility + (03:09:35, 17 December 2024)