ML20063C217

From kanterella
Jump to navigation Jump to search
Discusses Revised Small Break LOCA Model Re License NPF-9, Westinghouse on 820326
ML20063C217
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/30/1982
From: Parker W
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
References
TASK-2.K.3.30, TASK-TM NUDOCS 8205040604
Download: ML20063C217 (1)


Text

V DUKE POWER COMPANY Powzu Bu Lorno 4ee Sourn Cnuncu Sruzer, CnAntorre, N. C. 20a4a w w m o.e m ca,m.

30 1982 ftttPwoNt; Anta 704 VsCF Patsiotwv

$ttAme PRODUCTIOse 373-4083 Mr. Harold R. Denton, Director

@ M/ /

f['

Office of Nuclear Reactor Regulation vq, c;g% $g\\,p U. S. Nuclear Regulatory Commission Washington, D. C.

20555

.m Attention:

Ms. E. G. Adensam, Chief g '!.}

..g Licensing Branch No. 4

\\.

y,9 1

s

.a

\\,

h)

J Re: McGuire Nuclear Station C

%.. _,_b.

Docket Nos. 50-369, 50-370

' %l P

Dear Mr. Denton:

The McGuire Facility Operating License-No. NPF-9 contains the following condition [2.C.(11)1.(2)]:

"With respect to a revised small break LOCA model, (II.K.3.30),

the licensee shall, prior to May 1, 1982, submit to the NRC a revised model to account for recent experimental data including data from the LOFT Test Facility and the Semiscale Test Facility."

On March 26, 1982 Westinghouse submitted such a revised model to the NRC for their review, (NS-EPR-2581, E. P. Rahe, Jr. to Darrell G. Eisenhut).

With the submittal of this information by Westinghouse, Duke Power considers the above license condition satisfied.

i l

Very truly yours, 4

7 e

l William O. Parker, Jr.

I I

GAC/jfw l

l cc:

Mr. P. R. Bemis Mr. James P. O'Reilly, Regional Administrator Senior Resident Inspector U. S. Nuclear Regulatory Commission 30p/

McGuire Nuclear Station Region II

(

101 Marietta Street, Suite 3100 3

Atlanta, Georgia 30303 O

/

l 8205040604 820430 PDR ADOCK 05000369 P

PDR