ML20063C198

From kanterella
Jump to navigation Jump to search
Forwards Rev 12a to Palisades Suitability,Training & Qualification Plan in Response to NRC Determining Suitability Plan Unacceptable Under 10CFR50.54(p).Encl Withheld
ML20063C198
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/17/1994
From: Rogers D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9402040086
Download: ML20063C198 (1)


Text

-

I i'

/

CODSumBIS

?

David W. Rogers Plant Safety and Licensing Director POWERING MKNIGAN'S PROGRESS Pahsades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, MI 49043 t

January 17, 1994 F

b i

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

.j i

DOCKET 50-255 - LICENSE DPR PALISADES PLANT - PALISADES SUITABILITY, L

TRAINING AND QUALIFICATION PLAN, REVISION 12a

.j Attached is one original and three copies of Revision _12a to the Palisades Suitability, Training and Qualification Plan (STQP). This revision is-submitted in response to your letter to Consumers Power Company dated December 2, 1993 which determined that certain changes contained ~in Revision 12 to the Palisades STQP were unacceptable under the criteria of ICCFR50.54(p). The changes determined to be unacceptable' have been restored to previous Plan wording. The other items have been clarified in response to the Review Comments.

Consumers Power has determined that the changes contained in.this Revision do not degrade the safeguards effectiveness of the Plan. Accordingly this i

revision is submitted under the provisions of 10CFR50.54(p)(2).

1 O

David W. Rogers Plant Safety and Licensing Director CC Administrator, Region III, USNRC i

NRC Resident Inspector - Palisades Attachment l

i

' /[

0<1000 G 9402040006 940117

/ /-

1PDR ADOCK 05000255

-F PDR A C4t5 ENE72GYCOMPANY-

..