Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064E265 + (01:58:41, 17 December 2024)
- ML20064E253 + (01:58:41, 17 December 2024)
- ML20064E251 + (01:58:42, 17 December 2024)
- ML20064E242 + (01:58:43, 17 December 2024)
- ML20064E246 + (01:58:43, 17 December 2024)
- ML20064E238 + (01:58:44, 17 December 2024)
- ML20064E237 + (01:58:45, 17 December 2024)
- 05000425/LER-1994-001-01, :on 940107,reactor Automatically Tripped Due to Generator Turbine Trip Resulting from Trip of Switchyard Breakers.Caused by Loose Connection on Neutral Side of Shunt Reactor.Connection Tightened + (01:58:47, 17 December 2024)
- ML20064E234 + (01:58:48, 17 December 2024)
- ML20064E231 + (01:58:49, 17 December 2024)
- ML20064E225 + (01:58:50, 17 December 2024)
- ML20064E221 + (01:58:51, 17 December 2024)
- ML20064E217 + (01:58:51, 17 December 2024)
- ML20064E216 + (01:58:52, 17 December 2024)
- ML20064E214 + (01:58:53, 17 December 2024)
- ML20064E193 + (01:58:54, 17 December 2024)
- ML20064E198 + (01:58:54, 17 December 2024)
- ML20064E177 + (01:58:55, 17 December 2024)
- ML20064E180 + (01:58:55, 17 December 2024)
- ML20064E173 + (01:58:58, 17 December 2024)
- ML20064E171 + (01:58:59, 17 December 2024)
- 05000259/LER-1978-031-03, /03L-0 on 781016:two Zones of Fire Protec Fixed Spray Piping in Reactor Bldg Were Found Transposed Due to Misinterpretation of Drawings Causing Incorrect Installation of Piping.Piping Has Been Reconnected to Agree W/Drawings + (01:59:00, 17 December 2024)
- ML20064E167 + (01:59:01, 17 December 2024)
- 05000259/LER-1978-031, Forwards LER 78-031/03L-0 + (01:59:03, 17 December 2024)
- 05000259/LER-1978-030-03, /03L-0:on 781013,four Heat Detectors Found to Be Connected to Incorrect Spray Zones.Elec Panel 1-25-281A Was Wired Incorrectly Causing Improper Sequencing.Detectors Were Rewired & Returned to Oper Per Tech Specs + (01:59:05, 17 December 2024)
- 05000259/LER-1978-030, Forwards LER 78-030/03L-0 + (01:59:13, 17 December 2024)
- ML20064E152 + (01:59:14, 17 December 2024)
- 05000336/LER-1978-025-03, /03L-0 on 781007:daily Tech Spec 4.3.1.1.1.,Table 4.3-1,items 2.a & 2.b,Nuc Pwr Surveillance & Delta-T Pwr Channel Calibr Not Performed Due to Personnel Error. Supervisors Told to Perform Req Surveillance + (01:59:16, 17 December 2024)
- ML20064E148 + (01:59:17, 17 December 2024)
- 05000336/LER-1978-025, Forwards LER 78-025/03L-0 + (01:59:18, 17 December 2024)
- ML20064E140 + (01:59:20, 17 December 2024)
- ML20064E138 + (01:59:20, 17 December 2024)
- ML20064E133 + (01:59:21, 17 December 2024)
- ML20064E132 + (01:59:22, 17 December 2024)
- ML20064E127 + (01:59:22, 17 December 2024)
- ML20064E113 + (01:59:24, 17 December 2024)
- ML20064E103 + (01:59:25, 17 December 2024)
- ML20064E086 + (01:59:25, 17 December 2024)
- ML20064E085 + (01:59:26, 17 December 2024)
- ML20064E080 + (01:59:27, 17 December 2024)
- ML20064E079 + (01:59:27, 17 December 2024)
- ML20064E076 + (01:59:28, 17 December 2024)
- ML20064E064 + (01:59:28, 17 December 2024)
- ML20064E061 + (01:59:29, 17 December 2024)
- ML20064E063 + (01:59:29, 17 December 2024)
- ML20064E055 + (01:59:30, 17 December 2024)
- ML20064E052 + (01:59:30, 17 December 2024)
- ML20064E050 + (01:59:31, 17 December 2024)
- ML20064E048 + (01:59:32, 17 December 2024)
- ML20064D995 + (01:59:38, 17 December 2024)
- ML20064E017 + (01:59:38, 17 December 2024)