MONTHYEARBVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station BVY-98-068, Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Vermont Yankee Nuclear Power Station BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp1998-03-31031 March 1998 Monthly Statistical Rept for Mar 1998 for Vynp ML20248L1581998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Vermont Yankee Nuclear Power Station ML20217M7801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Vynp Station ML20198L6111997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Vynp Station BVY-97-161, Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Vermont Yankee Nuclear Power Station BVY-97-145, Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Vermont Yankee Nuclear Power Station BVY-97-126, Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Vermont Yankee Nuclear Power Station BVY-97-111, Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Vermont Yankee Nuclear Power Station BVY-97-098, Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Vermont Yankee Nuclear Power Station BVY-97-088, Monthly Operating Rept for June 1997 for Nynps1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Nynps BVY-97-074, Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Vermont Yankee Nuclear Power Station BVY-97-059, Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Vermont Yankee Nuclear Station BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station BVY-97-033, Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Vermont Yankee Power Station BVY-97-021, Monthly Operating Rept for Jan 1997 for VYNPS1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for VYNPS BVY-97-001, Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Vermont Yankee Nuclear Power Station BVY-96-154, Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Vermont Yankee Nuclear Power Station BVY-96-138, Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Vermont Yankee Nuclear Power Station BVY-96-114, Monthly Operating Rept for Sept 1996 for Vynp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Vynp BVY-96-103, Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Vermont Yankee Nuclear Power Station BVY-96-095, Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station1996-07-31031 July 1996 Monthly Operating Rept for July 1996 for VT Yankee Nuclear Power Station BVY-96-087, Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Vermont Yankee Nuclear Power Station BVY-96-072, Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Vermont Yankee Nuclear Power Station BVY-96-057, Monthly Operating Rept for Apr 1996 for VT Yankee Power Station1996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for VT Yankee Power Station BVY-96-041, Monthly Operating Rept for Mar 1996 for Vynp1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Vynp BVY-96-018, Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station1996-02-29029 February 1996 Monthly Statistical Rept for Feb 1996 for VT Yankee Nuclear Power Station BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station BVY-96-001, Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Vermont Yankee Nuclear Power Station ML20095F6601995-11-30030 November 1995 Last Page of Monthly Operating Rept for Nov 1995 for Vermont Yankee BVY-95-131, Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Vermont Yankee Nuclear Power Station BVY-95-118, Monthly Operating Rept for Oct 1995 for Vynp1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Vynp BVY-95-106, Monthly Operating Rept for Sept 1995 for Vynp1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Vynp ML20092F5901995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Vermont Yankee Nuclear Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
t.
VER.\10NT YANKEE NUCLEAR POWER STATION F10NT11LY STATISTICAL REPORT 78-10 FOR THE F10NTil 0F OCTOBER,1978 50- L1 t - R
s .. .
f*% '
[ OPERATING DATA REPORT l
50-271 DOCKET NO.
DATE -761110 CO31PLETED BY R.M. Siogren TELEPHONE A17 166 9011 X2281:
OPERATING STATUS
- 1. Uni Name: Vermont Yankee yyNchangeduringmonthof
- 2. Reporting Period: October 1978 October.
1593
- 3. Licensed Thermal Power (31Wt):
- 4. Nameplate Rating (Gross 31We):
540
- 5. Design Electrical Rating (Net 31We):
514 (open cycle) 504 I closed)
D3#
- 6. Staximum Dependable Capacity (Grcss 31We):
504
- 7. Staximum Dependable Capacity (Net 31We).
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Gise Reasons:
- 9. Power Level To Which Restricted.lf Any (Net 31We): N ne
- 10. Reasons For Restrictions,if Any: N/A This Stonth Yr to.Date Cumulative .
- 11. Hours in Reporting Period 745 7,296 53.570.75
- 12. Number Of flours Reactor was Critical 298.92 5,405.17 42,441.03 0 0 o
- 13. Reactor Resene Shutdown Hours
- 14. Hours Generator On.Line 199 5,217 .
40;665 0 0 0 t.
- 15. Unit Resene Shutdown Hours 234,304.5 7,847,385 56,188,528
- 16. Gross Thermal Energy Cenerated (31WH) ,
- 17. Gross Electrical Energy Generated (SIWH) 74,382 2,644,596 _18,589,306 70,823 2,520,328 17,599,161
- 18. Net Electrical Energy Generated (31WH) *
- 19. Unit Senice Factor 26.7 71.5 75.9 Zb./ 71.5 ed.9 .
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using SIDC Net)
M.9 68.5 65.2 Mb 07 2 63.9
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 54.9 21.0 7.5
- 24. Shutdowns Scheduled Oser Next 6 Stonths(Type.Date.and Duration uf Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed
.- INITIA L CRITICA LITY INITIA L ELECTRICITY CONI.\1ERCIAL OPER ATION (9/77)
s, . .
i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee 781110 DATE COMPLETED BY R.Fl. Sjogren TELEP110NE 617-366-9011 X2281 A!ONTH October 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mhe Net) (MWe Net) 0 375 1 37 12 2 18 3
278 39 4 l 20 381 466 5 23 i
. 6 t
2: 510 i-( 7 23 4
l 8 0 24 l
i 9 35 10 26 f
Il 27
./ I g, '
28 11 l 13 29 14 197 30 5
15 3t V 16 364 INSTRUCTIONS On this format. list the aserage daily unit power levelin MWe Net for each day in the reportine -
month. Compute to the nearest whole rnegawstt.
(9/77)
U
_ _ _ ________________- _ _ _ _ _ _ _ _ _ .1
o".
( .
II DOCKET NO. 50-271 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT N AME Vemont Yankee DATE 78111o COMPLETED ilY -R.M. Sincren REPORT MON'ill October 1978 TELLPilONE 617-366 'J011 X2281-e.
- E a
.5 E };; j s'E Licensee E t, ., Cause & Currective No. Date g 3g jg5 Event g? [*1 9
gu Action to l
H
$2 5 3 e-if3 Report
Prevent Recurrence l
Q 78-17 731001 S 303 C 1 NA RCA FUELXX NA l
78-18 781018 F 26 ll 3 NA CBA PUMPXX B - Reactor Recirculation Pump overspeed 78-19 781023 F 216 11 2 NA NA NA B - Turbine bearing problems l
l 2 3 4 F: Forced Reason: Method: E xhibit G - Instructisms S: St heduleil A. Equipment Failure (Explain) 1 Manual for Preparation of Data H. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3-Automatic Scram. Event Repor (LERI File INtlREG-D-Regulatory Restriction 4-O:her (Explain) 0161)
- 1. Operator Training & License Examination F Administrative 5 G-Operational Le ror (Explain) E xhibis 1 - Same Source C1/77) 11 Other (E xplain)
> . . m DOCKET NO. 50-271 UNIT Vermont Yankee DATE 781110 COMPLETED BY R.M. Sjogren TELEPHONE 617-366-9011 X2281' REPORT MONTH October 1978 SU:CIARY OF OPERATING EXFERIENCES Highlights Vermont Yankee operated for 11 of 31 days in the report period. For the entire month of October, the plant operated at an average of 19.8%
of rated thermal power. Gross electrical generation for the month was 74,382 MWHe or 18.5*. of design electrical capacity.
Operation Summary The following is a chronological description of plant operations in-cluding other pertinent items of interest for the month:
10-1 At the beginning of this report period, the plant was in the shutdown mode for refueling.
~
10-12 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, a return to full power was initiated ending the September-October refueling outage.
10-18 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, having achieved 84% of rated thermal capacity, a reactor scram occurred. This scram was due to a reactor recirculation punp overspeed. A return to full power was initiated at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.
10-23 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, while at 99% power, the reactor was manu-ally shut down iue to turbine bearing problems.
10-30 At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, . return to full power was initiated.
10-31 At the conclusion of this report period, the reactor was operating at 55 of rated thermal power and increasing in preparation for plant startup.
l
- - - - - - - - - - ---- - - - - - - - - -- - - - - _ -J
DOCKET NO. 50-271 .
UNIT Vermont Yankee -
l DATE 781110 ,
i C0f!PLETED BY R.M. Sjogren TELEP110NE 617-366-9011 X2281 Sg *ITY RELATED f1AINTENANCE October 1978 Page 1 of 3 NATURE OF LER OR OUTAGE MALFUNCTION EQUIP?!!.NT MAINTENANCE NUMBER CAUSli RLSulir C0ltRECTIVE ACTION ;
RilR Valve V10-46A Corrective Outage Worn Parts f Dirt i Leakage Past Seat Replaced Disc FR 78-345 78-06 HPCI Valve V23-65 Corrective Outage Valve Inspection Sa tis factory None MR 78-364 78-06 During Trouble-shooting Reactor Water Cleanup Corrective Outage Worn Parts Excessive Seal Replaced Rotating Pump MR 78-590 78-06 Leakage Assembly "A" Diesel Generator Corrective Outage Dirt Noisy Relay Cleaned as Necessary 480V Auxiliary Power MR 78-705 78-06 Cabinet Reactor Water Cleanup Corrective NA Failed Gasket Excessive Flange Repaired Regenerative lleat MR 78-879 Leakage
- Exchanger RCIC Testable Check Corrective Outage Worn Gasket Leakage Past Seat Repaired Valve MR 78-893 78-06 Surfaces .
Reactor Vessel Drain Corrective Outage Valve Stem and Unable to Open Replaced Valve .
Valve V2-99 MR 78-910 78-06 Disc Separation Valve i
i "D" RilR Service Water Corrective Outage Failed Seal Excessive Seal Replaced Seal , ,
Pump MR 78-936 78-06 Leakage !
RilR Service Water Valve Corrective Outage Worn Packing Packing Leaks Replaced Valve ,
V89-B MR 78-953 78-06 t
a f
- . -. _ -. . - ~ . - _ __ . -. . .
(
Page 2 of 3 i Docket No. 50-271 SAFETY RELATED MAINTENANCE October 1978 NA1URE OF LER UUTAGE MALFUNCT i CAUSL I ItLSULT CORRECTIVE ACTION MAINTENANCE NEIDER :
EQUIP: LENT .
?
System I Core Spray, RilR, Corrective Outage Failed Potential False Power Failure Replaced Transformer .
a f. ItPCI logic Bus Power MR 78-967 78-06 Trans former Alarm , !
- Monitor Feedwater Check Valve Preventive Outage Valve Inspection Satisfactory None -
V2-96-A MR 78-971 78-06 .
a
, "B" Station Battery Charger Corrective Outage Failed Diodes f. Loss of liigh Voltage Replaced Diodes and MR 78-975 78-06 Broken Wire Control Repaired Broken Wire Reactor Vessel Drain Line Corrective Outage Manufacturing Linear Surface Indi- Indications Removed by CUW-16 MR 78-976 78-06 Defect cations Found During Mechanical Grinding and in-Service Inspectio i lland Filing "B" Reactor Recirculation Corrective Outage Construction Weld Linear urface Indi- Indications Removed by i Pump Support Welds MR 78-977 78-06 Defect cation,Found During Mechanical Grinding and '
In Service Inspec- Iland Filing tion IRM 7-41D Corrective Outage Failed Detector No Response Replace Detector MR 78-980 78-06 I r
1 Uninterruptible Power Corrective Outage Failed Capacitor Blown Fuses but Unit Replaced Capacitor and Supply 1-B MR 78-982 78-06 Remaine'd Operable Fuses ,
l ilCU 34-07 Valve III Corrective Outage Worn Packing Packing { Leak Replaced Cartridge Valve ;
MR 78-986 78-06 ! ;
i ilPCI Valve 23-38 Corrective lutage Worn Packing Packing' Leak Adjusted Packing l i
MR 78-991 78-06
' l Alternate Cooling Cell Fan Corrective- hitage Failed Pick Up Coil 7an Inoperative Replaced Coil
(#1 West Tower) t1R 78-10045 78-06 IICU 18-27 Accumulator :orrective lutage Failed "O" Ring ..eaking Accumulator Replaced Accumulator stR 78-1009 78-06 i
Drywell Floor Drain Sump :orrective hitage : logged System Sumps Could Not be Removed and Cleaned i System MR 78-1011 78-06 Pumped Valves, Cleared Piping
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ .. _ . _ _ . . _ . . . _ ___._ _ _. ..__m . _ . _ _ . . __ _
IEIAILD MAIN'lLAAACE October 1978 page 3 ol 3 Docket No. 50-271 '
NATURE OF LLR OtHAGE MALEUNC1 -
CAUSL '
ItLSU LI CORRECTIVE ACTION IIAINTENANCE NU51BER
llCU 18-43 Valve 111 Corrective Outage Worn Packing Valve Leakage Replaced Cartridge Val,e MR 78-1012 78-06 Reactor Building Vent Corrective Outage Solenoid Valve SB-10 Would Not Ope Repaired Solenoid Valve. ,
Supply Valve SB-10 MR 78-1014 78-06 Supplying Opening .
Air Failed IRM-B Corrective Outage Defective Connector Instrument Would Not Repaired Connector MR 78-1017 78-06 Under Reactor Vessei Follow Power Chang ( s
- IICII 14-31 Valve 13-126 Corrective Outage Worn Valve Seat Reactor Control Rod Replaced Worn Parts ;
MR 78-1018 78-06 Drift t "B" Diesel Generator Corrective Outage Normal Operations low Governor Oil Added Oil MR 78-1028 78-06 Level Reactor Vessel Water Level Corrective Outage Out of Calibration Reads 10" tower Calibrated Unit Yarway 2-3-58B MR 78-1032 78-06 Than Other Yarways !
Main Steam Isolation Valve Corrective Outage loose Bolting Speed Control Valve Replaced Control Valve V2-86-C MR 78-1049 78-071 Sheared from its and Bolting.
LER 78-32 Mount Causing MSIV to Close too fast.
Reactor Recirc Cross Corrective Outage Worn Packing Leakage Replaced Packing "
Connect Valve V2-653 MR 78-1055 78-08 Reactor Water Cleanup Pump Corrective Outage Normal Operations Low Oil Added Oil MR 78-1064 78-07 a
[
l i
e- s