._.

t$

~

~

g nbe 6 maw &

PHI 1ADELPHIA ELECTRIC CDdPANY Peach Bottom Atomic Power Station Delta, Pennsylvania 17314 October 19. 1978

[

Mr. Boyce H. Grier Office of Inspection and Enforcement Cv1 Region i e

United States Nuckmar Regulatory Commission N.

l 631 Park Avenue

]

King of Prussia, PA 19406 t

Q

SUBJECT:

REPORTABLE OCCURRENCE - PROIPT NOTIFICATION i

%:nfirming C. E. Andersen's conversation with Mr. Greenman, Region 1,

[

United States Nuclear Regulatory Commission on 10/19/78.

Referencer.

DocketNo.050-27"[/M Peach Botton Units M 3 Technical Specification.

Reference:

3.7.A5 Report No. 3-75-20/IP Occurrence Date: October 19,1978 Identification of Occurrence:

I i

Unit 3 drywell oxygen concentration exceeded Technical Specificaticar Limits' f

by 0.1%.

'landitions Prior to Occurrence:

Unit 3 operating at 100% power.

I Apparent Causu of Occurrence:

I i

Operator error.

)

Analysis of Occurrence::

i i

During the period while Unit 2 was being inerted following startup. Unit 3 exceeded its allowable 02 concentration of 4% by 0.1% for 2 to 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

.%en this was discovered. a shutdown was initiated per Technical Sppificatio Requirements. The drywell was-depressurized and purged to bring 0 concentration back within-seceptable limits. The total time until the drywell was back within Spec. was approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.- After the unit was back in Spec.. shutdown was ceased and reactor power returned to nc, mal.

The safety significance of this event is minimal.

JP/UVMK e.

e

--w-+

.ww

-w

-vy,,,--.-,,,y ec,,.wa,,.,,

e-,,d--.

e.

e-emi,e y m.

,.,*pwe-39 -ry e t

e d

e

- h $$

g rrwetive Action:.

Shutdown initiated and drywell purge initiatM.

Previous Failures:

3-76-55/IP and 3-76-76/IP.

Very truly yours, e

CF W. T. Ullrich, Superintendent i

Peach Bottou Atomic Power Station CEA:1jh e