MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
. -
OPERATING DATA REPORT ,
DOCKET NO. 50-266 .
DATE Noverser 3,1978 COMPLETED BY W5SCONS N ELECTR C FOWER CO'.
TEL'EPHONE 1, 1NTT tjAME: POltJT BFACH NilCLEAR PL ANT l> NIT 1 ,. NOTES 2, FEcoPTitfG PFRTOO . OCTORER 1978. , ,
3,. LirFliCFO TH,FRP;'AL PotER (MWT): 1518,. ,. ,.
- 4. tlAMFDI.ATF, RATING (gross Mt.E): 523.8 .
5, OFCTGU FIFrTRICAL k.ATING.(NET MWE): 497. . . . ,
6,. MAXTMleM DF PFNOARI E C AP ACITY (GRO;9 MhE): . 5,19. , , , , , , , , , , , , , , , , , , ,.
7p if AX T Ml eM OFPFNOARI.E CAPACITY (NET.MWE):. 495. .
8.
TF CHANGES.0crDR tJOT AprLTrAR(F TM CAPACITY RATINGS (ITEMS NilMRER 3 THROIGH 71 stNCE LAST REPORTe GIVE REASONS! "
_ 9,. POWEP LEVFL To :a iCH.RESTRICTFpe IF ANY.(NET.MkF):, ilOT APPLTCABIE
- 10. REACON9 FOR RFC' SCTIONSe (TF ANY): NOT APPL.ICABLE iHis MONTH YR TO DATE' CbMbLA'TiVE II,'. Hnl 5% Itl,4FPnDT iltn ( F5 TOO., ,,, .._ i45, ie 2U6, 70,008, 12,. t'pMPFP OR. Hot-RC RFA,*TnR WAS CRITICAL 431,.2 6,53R.8 58,423,.9 13,. nrArTOP RFCfRVF SHiTOOWN HOllRS ._0 0 2,. 6
. . 439,.6 1 4,. Hol, R 4 r,F,tJFR ATOA Otl 1. T NF 401.2
. 6,405 2 56,473,.0 1 %,. I HTT PFCFAVE %HiyTOOWN ,HollRS ., ., .. . 0.4 , _. 2.5 , .. 383.4 1 6,. Go,oCC .THFPMAI, ENFPGY,GFNFRATFO.(MWH) 543,450 9,419,410 79,197e435 17 GonCc FIFCTRICAI FMFRGY,GFNFRATFD (MWH) 186,200 3,224,600 26e683e200 1 A, NFT.r/FrTATCAL_ENFRGY GFNERATEO (MWH) 176,296.. 3,081 865, 19, I t i T T croyTCF. FACTOR . 25e422:021.
53,.9 87,.8 80.7 P _n,. I, H T' .' AyATIARTLTTY FACTOA. _ 53.9 87,.8 81,.2 P1, IWTT CADACITY FACTOR (l'9JNQ MOC NET) 47 8 85,.3 74 8 RR,. 8. NIT PAPACTTY FACTOR _(liRING DER NET) 47 6 2 3,. I NTT FORCFD. OPTAGF R ATE 85,.n 73,.1
.. . . . . _ _ 0 . 0, . . . .2.2 3.0 24 CHliTOOkN4 SCHEDllLED OVER NEXT 6 MONTHS .(TYPEe DATEe ANO DiPATION OF EACH):
29..TF SHl2TDOWN AT END OF REPORT PERTOOr ERTTMATFD OATE OF cTARTiiP!
NOT chi TOOWN
$ lN
/
sf2D zg g -pQ UT EFbobihb NO d b 064 h I bi'i khn C D'r Ql E FC bn TilN6bFi'ii'P r h i'rh chDi'rMRED 2ke 19ii
} .
OPERATING DATA REPORT . . . . . ... .
DOCKET NO. 50-301._ . -
D TF November 3, 1978 COMPLETED BY WISCONSIN ELECTRIC POWER CO.
TFLEPHONE OPERATING STATUS 1,. lHiT NAME! POINT BEAhH NilCLEAR PLANT UNTT 2 ,. NOTES 2,. RFP.ORTING.PERIODt OCTOBER 1978. , p 3p LTCrNCEO THFRMAL POWER (MWT): '1518,. ,. p 9,. NAt.*FPIATF RATING (GROS 9 MWE)! 523.A. ,.
5,. DF47GN FI,FrTRICAL RATING (NFT MWE)! 497. . , ,. .
6p M.AXTMUM DFPFtJDARLF CAPACTTY (G.ROS9 MWE)!, 5,19. ,. , , , , , , , , , , , , , , ,
73 MAX]MUy OFPFUDARLE,CAEACITY (NET.MWF)t. 995.., , , ,
,. , ... . ,... . . e .. . ., . ... . .. ..... . . . . . . .
A. TF rHANGF5.Or. cup .TN CAPACITY RATINGS (TTFMS Ni1MBER 3 THRollGH 7) RINCE LART RFPORTe GIVF REA90NS!
.. . ..NOT ,APPLTCARLE .. . _ . . . . _ .. .._ . . , , . , , ., _ . , . . . .
_9, PONFR 1FyFL T,O_THICH.RE4TRICTFDe,TF ANV (NET,.MEE)!. NOT ADPl.TCARLE
- 10. REACON4 FOD RFCTDTCTTON4e (TF ANY)2 NOT APDITCARI.E THIS MONTH YR TO DATE Cl.lMi'LATIVE 11,. HOUR S . IN . R EPORTING_ PER IOD.. .
12 3 NilMBER OF, HOURS REACTOR WAS, CRITICAL
. .,......, 745,. 7e296,_ 54 703, _
745,.0 6e667,.1 49,632,.1 13,. REACTOR RFSERVE RHUTOOWN HOURS 0,. 0 14,. HOUR 4 GENFRATOR ON LINF.
. 66 . 147,.8
. 745 0 6 600,.9 48,599,.8 15,. I!P)T T RECERVE SHUTDOWN HOURS, . 0.0 j 16, GRO44 THERt.4 AL_ ENERGY GENFR ATED . .(MWH)
.. . .. , . . .Q . 0 . .. .85.9 le104e830 9,546,319 64e131 281 17f GROC4 EL ECTRIC AL ENERGY. G,FNER ATFD (MWH) 382,060 3e303e210 21,736,920 16 ' JET.Fl. FCTR T C AL_ Ft,lERGY GENFR ATED (MWH) 3 6 5 e 3 ). 4 , . 3,153 274,. 20e662e076, 1or 8.' NIT 5FAV T CF. FeCTon_ . . 100,.0 90,5 88.6
?Or I.'NT T AVA TI AR TI. TTY . F ACTOR. . ,, 100,.0 90,.5 88 8 l P1 l.INTT CAP.ACITY FACTOR (lj4ING MDC NET) 99,.1 87,.5 1 2P r 1.IN T T C AP Ar f TY.EACTOR_ {!!97NG DER NET) 77 1 l 98 7 87,.0 75 9 23,. l'NTT FORCFD OllTAGF R ATF. 0.0_ 0.4
. _ . , ,. . . , , . 1.7 l24.RHilTDOWNS9CHEDilLEDOVFR NEXT 6 MONTHS (TYPEr . . _. DATEe AND DisRATION OF EACH)!
Refueling maintenance shutdown scheduled for March 9, 1978, to last approximately four weeks.
25 TF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTl5P! NOT SHUTDOWN
__._ . . ... .-- . _ - . . . _ . . . . . . . . . _, . . . ,, . . . . _ . ..........l-.,'_ . . . . . , . . . . . . . _...
DATA REPORTED AND FACTORS CALCULATFD AS REQUESTFD TN NRC LFTTFR DATED SEPTFMBER22, 1977
DOC T NO. 'fj-266 ,
UNIT NAME Point Beach Unit 1
~
DATE November 3, 1978 COMPLETED BY Wisconsin Electric Power Co.
TELEPHONE 1
AVERAGE DAILY UNIT POWER LEVEL
, MONTH October, 1978 l AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 -1 11 -
6 21 493 2 -1 12 -
9 22 494 3 -1 13 -
9 23 494 4 -1 14 - 13 24 493 5 -1 15 67 25 494 6 -1 16 292 26 493 7 -1 17 325 27 494 8 -1 18 369 28 493 9 -1 19 410 29 494 10 -1 20 481 30 494 31 494
. l AD-28A (1-77)
DOCawT NO. 50-301 , ,
UNIT NAME Point Beach Unit 2
~.
DATE November 3, 1978 COMPLETED BY Wisconsin Electric Power Co.
TELEPHONE AVERAGE DAILY UNIT POWER LEVEL MONTH October, 1978 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe HET DAY MWe NET DAY MWe NET 1 499 11 496 21 416 2 498 12 497 22 459 _
3 498 13 497 23 493 4 499 14 497 24 496 5 497 15 495 25 498 6 497 16 471 26 496 7- 498 17 493 27 497 8 497 18 491 28 494 9 495 19 492 29 489 10 498 20 466 30 495 31 496
. i AD-28A (1-77)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit,'l REPORT MONTH October, 1978 COMPLETED B Vs E ec Pwr Co.
TELEPHONE m
ci omo 4 o
2s 4u "co 5t mam lNo ao En ao No. Date g; gg g jgg Licensee Event gjp oy Cause and Corrective Action e
am o ae Report No. m Eo To Prevent Recurrence Qw % omc o E g U Q
8 780920 S 342.6 C 1 78-014/OlT-0 CB IITEXCIJ The unit's annual refueling outage scheduled for 9-28-78 was resched-uled to commence with an unexpected shutdown 9-20-78 for steam generator primary-to-secondary leakage repair.
The forced shutdown hours listed
- for September, 1978, reflect the extension of scheduled refueling time due to steam generator leakage.
9 781015 S 1.2 B 1 N/A N/A N/A Unit taken off line to conduct -
routine post-refueling turbine overspeed tests.
F: Forced Reason: 3 Method: ' Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram D- Regulatory Restriction Sheets for LER File 4 ,Other (explain) (NUREG-OlS1)
E- Operator Training & License Exam ,
F- Administrative 3 4D-28B Exhibit I- Same
]01-78) G- Operational Error (explain) Source 11- Other (explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 REPORT MO"'.'t! October, 1978 DATE November 3, 1978 COMPLETED BY Wis. Elec. Pwr. Co.
TELEPHONE m
c . ~ wu a o
.M au "co ." t Po En co a to a co ao No. Date D. gg m jjg Licensee Event gg o'g Cause and Corrective Action N a :::
a-c3 a .c Report No. to so To Prevent Recurrence
% o tn a o
- C 3 0 8
F: Forced Reason: 3 4 Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram D- Regulatory Restriction Sheets for LEP. File 4 ,Other (explain) (NUREG-0161)
E- Operator Training & License Exam /
F- Administrative 5 AD-28B G- Operational Error (explain) Exhibit I- Same.
(01-78) 11- Other (explain)
Source
NARRATIVE SUM. MARY OF OPERATING EXPERIENCE DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE ,
November 3, 1978 COMPLETED BY Wisconsin Electric Power Company Unit 2 was base loaded for approximately 90% of the period, with seven load reductions. Power Supply reouested, on four occasions, that load be reduced to an average of 415 MWe for an average duration of three hours each.
Load was reduced to 60 MWe for seven hours on October 20-21, 1978 to repair a steam leak on a turbine cross-f under pipe drain. Load was reduced to 335 MWe for four hours on October 16, 1978 to conduct turbine stop valve tests.
Load was decreased by 5 MWe for 76 hours8.796296e-4 days <br />0.0211 hours <br />1.256614e-4 weeks <br />2.8918e-5 months <br /> on October 28-31, 1978 to provide additional operating margin below core thermal power limitations while the unit's monitoring computer was out of service.
No major safety-related maintenance was performed during the period.
N, O $
)
NARRATIVE SU[1 MARY OF OPERATING EXPERIENCE DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 -
DATE November 3, 1978 COMPLETED BY Wisconsin Electric Power Company Unit 1 returned to the line at 6:37 a.m., October 15, 1978, to complete refueling three days ahead of schedule, setting a new 22-day refueling outage record for Point Beach. The unit was soaked at 120 MWe for nine hours before it was taken off line at 3:25 p.m., October 15, 1978, to conduct turbine overspeed trip tests. The results of the overspeed trip tests were: 1864, 1863 and 1862 RPM. The unit was returned to the line at 4:37 p.m., and commenced a gradual .
f escalation to 75% (370 MWe) for fuel conditioning. Load was reduced to 270 MWe for nine hours on Octobsr 17, 1978, for condenser tube plugging. Load was maintained at 75%
until 11:20 a.m., October 19, 1978, in order to reach equilib-rium xenon conditions in the core before conducting axial offset tests. Load was then increased to 95% (470 MWe) where it was held for fuel conditioning until 10:40 a.m., October 20, 1978, when escalation to full power commenced. .The unit operated at full power for the remainder of the period.
Indications of primary-to-secondary leakage were noted about 8:00 p.m., October 23, 1978. At 10:30 p.m., October 23, 1978, the leakage was determined to be 26 gallons per day in the "A" steam generator. The leakage gradually increased to 47 gallons per day at 2:45 p.m., October 24,.1978, and to 61 gallons per day at 4:00 p.m., October 24, 1978. The leak then stabilized and even decreased gradually to 52 gallons per day on October 31, 1978.
Major refueling-maintenance outage work included
~ refueling; seals overhaul and motor inspection and cleaning on one reactor coolant pump; steam generator eddy current testing, tube plugging and sludge lancing; inservice inspection of primary system components; charging pump discharge dampener installation; high pressure turbine extraction piping modification to reduce erosion problems; condenser expansion joint replacement; overhaul of one main steam generator feedwater pump; inspection and cleaning of one main circulating water pump motor; and replacement of safety-related BFD relays.
Steam generator sludge lancing removed 25 gallons -
sludge from the "A" steam generator and 58 gallons from the "B" steam generator. Six gallons of sludge remained in the "A" steam generator and 29 gallons in the "B" steam generator.
Installation of pulsation dampeners on the "B" and "C" charging pump discharge lines was completed. No dampener was installed on the "A" pump due to time limitations.
2 All 62 of the BFD type relays in the reactor protection system were replaced during the refueling outage.
A 14 day reportable event (LER No. 78-015/01T-0) occurred on October 9, 1978, when a hydraulic snubber (No. 3221) located on the pressurizer relief line was determined to be inoperable. The snubber did not lock up when the specified load rate was applied during surveillance testing. The snubber and its control valve were disassembled and inspected, but no problems could be found. After reassembly, the snubber still failed to lock up so it was replaced. The snubber surveillance program was expanded as required by Technical Specifications.
Inspection of the fuel discharged from the core during '
,' the refueling has been completed with no significant findings.
No other major safety-related maintenance was performed during the period.
e 9
e
SUPPLEMENT TO MotiTHLY REPORT FOR October, 1978 REFUELING Ir1FORMATI0tl REQUEST In accordance with our letter dated February 21, 1978, which provided certain refueling information, we are providing the following update to that refueling information: (NC = No Change) a) Next Scheduled Refueling Shutdown: Unit 1: 9/28/79
- c. Unit 2: NC b) Scheduled Date for Restart: Unit 1: 11/2/79 Unit 2: NC c) License Amendment Required / Staff 10 CFR 50.59 Review Completed: Unit 1: None Anticipated Unit 2: NC d) Scheduled Date for Submitting Supporting Information: Unit 1: August 1979
(
, Unit 2: NC e) Important Licensing Considerations: Unit 1: None Anticipated Unit 2: NC f) Number of Fuel Assemblies in Storage Pool: 180 g) Other: