Corrected Pages to Amends 82 & 76 to Licenses DPR-29 & DPR-30,respectively
ML20064E048
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/14/1982
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20064E051 List:
References
NUDOCS 8301050054
Download: ML20064E048 (2)


Text

-

r..u u..:-a ea a..:m <..

m....~.

o 3v QUA0 CITIES-DPR-29

2) Main steam isolation valves,
s. With the measured leakage rate which shall be leak tested at exceeding 11.5 scf per hour for least once per 18 months at a any one main steam isolation pressure of 25 psig.

valve, restora the leakage rate to 611.5 scf per hour for any

3) Bolted double-gasketed seals one main steam isolation valve which shall be tested at a prior to increasing the reactor pressure of 48.psig whenever coolant temperature above the seal is closed after 2120F.

being opened and esch operating cycle.

e. All test leakage rates shall be calculated using observed data can'verted to absolute values.

Error analyses shall be performed to select a balanced integrated leakage measurements system.

3. Pressure Suppression Chamber-Reactor. Building vacuum Breakers
a. The pressure suppression chamber-reactor building vacuum c
3. Pressure Suppression Chamber-

-Reactor Building Vacuum Breakers

e. Except as specified in Specification 3.7. A.3.b below, two pressure sup-8301050054 B21214 PDR ADOCK 05000254 P

PDR 3,7jg,7,4 Amendment No. #5, 82

?

. ~

~

~..u..y ;_.,,.

e S.'

i4 QUAD CITIES DPR-30

2) Main steam isolation valves,
s. With the measured leakage rate which shall be leak tested at exceeding 11.5 scf per hour for least once per 18 acnths at a any one main steam isolation pressure of 25 psig, valve, restore tne leakage rate to $ 11.5 scf per nour for anf
3) Bolted. double-gasketed seals one main steam isolation valve which shall be tested.at a prior to increasing the reactor press 0re of 48 psig whenever coolant temperature above the' seal is closed after 2120r.

being opened and each operating cycle.

e. All test leakage rates shall be calculsted using. observed data converted to absolute values.

Error analyses shall be performed to select a balanced integrated leakage measurements system.

3. Pressure Suppression Chamber-Reactor Building VacQum Breakers
a. The pressure suppression chamber-reactor building vacuum l
3. Pressure Suppression Chambe.r-

. Reactor Building Vacuum Breakers a, Except as specified in Specification 3.7.A.3.b below, two pressure sup-

~

u 3.7/4.7-4 Amendment No. "gg, 76 4

h*

m.s e e em e

.