Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247P625 + (19:51:12, 16 March 2025)
- 05000289/LER-1998-005, Forwards LER 98-005-00 Re Inoperable Fire Dampers Determined Reportable on 980416.No New Commitments Made within Ltr + (19:51:15, 16 March 2025)
- 05000336/LER-1997-022-03, Forwards LER 97-022-03,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970602.LER Suppl Provides Update on Results of Analyses & Investigation.Util Commitments Made within Ltr Included in Attachm + (19:51:24, 16 March 2025)
- TAC:61634 + (19:51:29, 16 March 2025)
- ML20247P537 + (19:51:31, 16 March 2025)
- 05000461/LER-1998-018, :on 980416,ESFA,occurred.Caused by Deficiencies in Method Used to Perform Nsps Power Supply Adjustment. Developed Maint Procedure for Replacement of Power Supplies Powered by Nsps Bus + (19:51:42, 16 March 2025)
- GO2-89-131, Forwards Corrected Page I of Change 6 to Guard Training & Qualification Plan.Page Withheld + (19:51:43, 16 March 2025)
- IR 05000254/1997023 + (19:51:53, 16 March 2025)
- IR 05000397/1998002 + (19:51:55, 16 March 2025)
- IR 05000413/1989009 + (19:52:02, 16 March 2025)
- 05000395/LER-1989-015, :on 890825,pressurizer Safety Valve Body Inlet a Temp Increased to Greater than 450 F & Plant Shutdown Initiated.Licensee Continuing to Evaluate Cause.Manual Reactor Trip Initiated + (19:52:06, 16 March 2025)
- 05000423/LER-1998-016-01, Forwards LER 98-016-01,determined Reportable at Millstone Unit 3 on 980223,per 10CFR50.73(a)(2)(vii).Commitments Made within Ltr,Encl + (19:52:14, 16 March 2025)
- IR 05000289/1988030 + (19:52:15, 16 March 2025)
- IR 05000289/1988007 + (19:52:17, 16 March 2025)
- IR 05000289/1987019 + (19:52:20, 16 March 2025)
- IR 05000289/1987016 + (19:52:23, 16 March 2025)
- IR 05000424/1989022 + (19:52:24, 16 March 2025)
- IR 05000289/1987014 + (19:52:33, 16 March 2025)
- 05000423/LER-1997-060-01, Forwards LER 97-060-01,determined Reportable at Millstone Unit 3 on 971209,per 10CFR50.73(a)(2)(i)(B).Commitments Made within Ltr,Encl + (19:52:35, 16 March 2025)
- IR 05000289/1987008 + (19:52:41, 16 March 2025)
- IR 05000344/1989017 + (19:52:52, 16 March 2025)
- TAC:53148 + (19:53:03, 16 March 2025)
- IR 05000333/1998001 + (19:53:09, 16 March 2025)
- 05000416/LER-1989-008, :on 890523,two Redundant Secondary Containment Isolation Valves Failed to Close within 4 Limit.Caused by Failure of Internal Disks of Exhaust Valves.Exhaust Valve of Actuator of Each Damper Replaced + (19:53:11, 16 March 2025)
- 05000206/LER-1989-018, :on 890527,voluntary Entry to Tech Specs 3.0.3 Done to Perform Surveillance of Containment Spray Sys Pump. Caused by Inadequate Tech Specs (Ts).Ts 3.3.1 Rev Planned to Preclude TS 3.0.3 Entries for Similar Events + (19:53:58, 16 March 2025)
- IR 05000293/1998003 + (19:54:05, 16 March 2025)
- TAC:65955 + (19:54:21, 16 March 2025)
- A07039, Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Pole Shafts for All Four Breakers Replaced During Recently Completed Refueling Outage + (19:54:22, 16 March 2025)
- IR 05000289/1989009 + (19:54:27, 16 March 2025)
- A07335, Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Local Leak Rate Test Procedure Revised to Require Weld Insps Whenever Thermal Stress Detected Due to Leakage of Sufficient Rate + (19:54:28, 16 March 2025)
- IR 05000313/1989028 + (19:55:10, 16 March 2025)
- ML20247N520 + (19:55:40, 16 March 2025)
- IR 05000498/1987075 + (19:55:53, 16 March 2025)
- IR 05000298/1988029 + (19:55:57, 16 March 2025)
- TAC:59334 + (19:56:00, 16 March 2025)
- IR 05000313/1988035 + (19:56:04, 16 March 2025)
- ML20247N361 + (19:56:20, 16 March 2025)
- NUREG-0612, Safety Evaluation Supporting Util Request to Delete Three Commitments in Response to NUREG-0612 Re Heavy Load Control on 5-ton Electric Monorail Hoist W/Integral Trolley & 4-ton Monorail Chain Hoist W/Geared Trolley + (19:57:22, 16 March 2025)
- ML20247N218 + (19:57:27, 16 March 2025)
- IR 05000298/1989006 + (19:57:29, 16 March 2025)
- IR 05000324/1998001 + (19:57:36, 16 March 2025)
- TAC:68529 + (19:57:38, 16 March 2025)
- 05000266/LER-1998-014, :on 980417,ESF Actuation Automatic Start of Swp Occurred.Caused by Inadequate Procedure That Failed to Provide Info on Expected Start of Swps P32A & P32B.Revised Procedure Iwp 95-048-02 to Provide Necessary Info + (19:58:49, 16 March 2025)
- IR 05000445/1989006 + (19:59:05, 16 March 2025)
- 05000461/LER-1998-019, :on 980417,noted Failure to Satisfy TS for Ensuring That Electrical Loads Properly Sequence Onto safety-related Buses.Caused by Inadequate Surveillance Procedures.Will Revise Procedures 9080.21 & 9080.22 + (19:59:17, 16 March 2025)
- ML20247M947 + (19:59:48, 16 March 2025)
- IR 05000289/1989019 + (20:00:04, 16 March 2025)
- IR 05000333/1988025 + (20:00:07, 16 March 2025)
- ML20247M915 + (20:00:14, 16 March 2025)
- ML20247M909 + (20:00:17, 16 March 2025)
- TXX-8948, Forwards Advance FSAR & Tech Spec Changes Re Util Organization.Only Draft Pages Encl.Changes Will Be Included in Future FSAR Amend + (20:00:35, 16 March 2025)