Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML042450071 + (06:35:06, 16 January 2025)
- ML042450066 + (06:35:07, 16 January 2025)
- ML042450067 + (06:35:07, 16 January 2025)
- ML042450061 + (06:35:08, 16 January 2025)
- ML042450056 + (06:35:09, 16 January 2025)
- ML042450045 + (06:35:10, 16 January 2025)
- ML042450041 + (06:35:10, 16 January 2025)
- ML042450021 + (06:35:11, 16 January 2025)
- ML042450002 + (06:35:12, 16 January 2025)
- ML042440886 + (06:35:12, 16 January 2025)
- ML042440849 + (06:35:13, 16 January 2025)
- ML042440831 + (06:35:14, 16 January 2025)
- RIS 2004-03, NRC Regulatory Issues Summary (RIS) 2004-03, Revision 1: Risk-Informed Approach for Post-Fire Safe-Shutdown Circuit Inspection (Formerly RIS 2004-003) + (06:35:15, 16 January 2025)
- ML042440820 + (06:35:15, 16 January 2025)
- ML042440776 + (06:35:16, 16 January 2025)
- ML042440721 + (06:35:17, 16 January 2025)
- ML042440763 + (06:35:17, 16 January 2025)
- ML042440701 + (06:35:18, 16 January 2025)
- 05000353/LER-2004-001, Re Automatic Scram Due to 500 Kv Switchvard Faults + (06:35:20, 16 January 2025)
- CY-04-167, Registration of Spent Fuel Dry Cask in Use at the Plant (HNP) Independent Spent Fuel Storage Installation (ISFSI) + (06:35:21, 16 January 2025)
- ML042440689 + (06:35:22, 16 January 2025)
- 05000271/LER-2004-003, Regarding Automatic Reactor Scram Due to a Main Generator Trip as a Result of an Iso-Phase Bus Duct Two-Phase Electrical Fault + (06:35:26, 16 January 2025)
- ML042440671 + (06:35:27, 16 January 2025)
- ML042440673 + (06:35:27, 16 January 2025)
- ML042440664 + (06:35:28, 16 January 2025)
- CPSES-200401957, July 2004 Monthly Operating Report for Comanche Peak Steam Electric Station + (06:35:29, 16 January 2025)
- BSEP 04-0091, Request for License Amendment - Addition of Tracg Methodology for Determining Core Operating Limits + (06:35:30, 16 January 2025)
- ML042440659 + (06:35:30, 16 January 2025)
- ML042440656 + (06:35:31, 16 January 2025)
- ML042440649 + (06:35:32, 16 January 2025)
- ML042440647 + (06:35:33, 16 January 2025)
- W3F1-2004-0072, Fitness for Duty Performance Data-Six Month Report Waterford Steam Electric Station, Unit 3 (Waterford 3) + (06:35:33, 16 January 2025)
- ML042440642 + (06:35:34, 16 January 2025)
- ML042440640 + (06:35:35, 16 January 2025)
- LR-N04-0369, Notification of Revised Application of Westinghouse Dynamic Rod Worth Measurement Technique + (06:35:36, 16 January 2025)
- ML042440636 + (06:35:36, 16 January 2025)
- L-2004-185, Units I and 2, Proposed License Amendments Supplement 2 - Request for Additional Information Response Elimination of RPS, Afas and ESFAS Pressure Sensor Response Time Testing Requirements + (06:35:37, 16 January 2025)
- RBG-46314, Supplement to Amendment Request for a One Time Extension of the Drywell Bypass Test, Response to Request for Additional Information 2, River Bend Station, Unit 1 + (06:35:38, 16 January 2025)
- RBG-46303, Supplement to Amendment Request, Deletion of Technical Specification 3.6.4.4 Shield Building Annulus Mixing System and Revision of Main Steam Isolation Valve (MSIV) Surveillance Requirement SR 3.6.1.3.10 + (06:35:40, 16 January 2025)
- LR-N04-0359, Response to Request for Additional Information for LCR-S02-10, Request for Change to Technical Specifications Relaxation of Requirements Applicable During Movement of Irradiated Fuel + (06:35:41, 16 January 2025)
- LR-N04-0376, 10CFR21 Interim Report, GE 10CFR Part 21 Communication Document SC04-05, Loose Internal Terminal Strip, Barksdale Pressure Switch Hope Creek Generating Station + (06:35:41, 16 January 2025)
- ML042440621 + (06:35:42, 16 January 2025)
- ML042440622 + (06:35:42, 16 January 2025)
- ML042440618 + (06:35:43, 16 January 2025)
- LR-N04-0377, 10CFR21 Interim Report, Fisher Controls 10CFR Part 21 Information Notice FIN 2004-02, Fisher Pneumatic Instrument Relays with Nitrile Elastomer Diaphragms + (06:35:44, 16 January 2025)
- ML042440609 + (06:35:44, 16 January 2025)
- ML042440605 + (06:35:45, 16 January 2025)
- ML042440608 + (06:35:45, 16 January 2025)
- LR-N04-0371, Response to RAI Regarding Request for Authorization to Use a Risk-informed Inservice Inspection Alternative to the Asme Boiler and Pressure Vessel Code Section XI Requirements for Class 1 and 2 Piping + (06:35:46, 16 January 2025)
- ML042440591 + (06:35:47, 16 January 2025)
- ML042440594 + (06:35:47, 16 January 2025)
- ML042440590 + (06:35:48, 16 January 2025)