August 30, 2004 George A. Williams, Site Vice President Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

GRAND GULF NUCLEAR STATION

Dear Mr. Williams:

On August 2, 2004, the NRC staff completed its midcycle plant performance assessment of the Grand Gulf Nuclear Station. The midcycle review for Grand Gulf involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and inspection plan does not include physical protection information.

A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2006.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 12 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

Entergy Operations, Inc. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817/860-8148 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

William D. Johnson, Chief Project Branch A Division of Reactor Projects Dockets: 50-416 Licenses: NPF-29

Enclosure:

Grand Gulf Nuclear Station Inspection/Activity Plan cc:

Senior Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, MS 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Washington, DC 20005-3502

Entergy Operations, Inc. Jay Barkley, Chief Energy & Transportation Branch Environmental Compliance and Enforcement Division Mississippi Department of Environmental Quality P.O. Box 10385 Jackson, MS 39289-0385 President, District 1 Claiborne County Board of Supervisors P.O. Box 339 Port Gibson, MS 39150 General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 The Honorable Charles C. Foti, Jr.

Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, LA 70804-9005 Governor Haley Barbour Office of the Governor State of Mississippi Jackson, MS 39201 Mike Moore, Attorney General Frank Spencer, Asst. Attorney General State of MS P.O. Box 22947 Jackson, MS 39225 Dr. Brian W. Amy State Health Officer State Board of Health P.O. Box 1700 Jackson, MS 39215

Entergy Operations, Inc. Robert W. Goff, Program Director Division of Radiological Health Mississippi Dept. of Health P.O. Box 1700 Jackson, MS 39215-1700 Michael A. Krupa, Director Nuclear Safety & Licensing Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213-8298 Director, Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.

P.O. Box 756 Port Gibson, MS 39150 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Entergy Operations, Inc. Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (TLH4)

Branch Chief, DRP/A (WDJ)

Senior Project Engineer, DRP/A (TRF)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (KEG)

RidsNrrDipmlipb V. Dricks, PAO (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (LJS, MPS1, ATG, JAC)

L. Reyes, EDO (LAR1)

S. Richards, Chief, NRR/DIPM/IIPB (SAR)

R. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)

C. Carpenter, Deputy Dir. for Inspection and Programs (CAC)

B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

T. Bergman, Chief, ROPMS, OEDO (TAB)

H. Berkow, Director, LPD4, NRR/DLPM (HNB)

R. Gramm, Chief, PDIV-1A, NRR/DLPM (RAG)

T. Alexion, NRR Project Manager (TWA)

ADAMS:  Yes G No Initials: WDJ

 Publicly Available G Non-Publicly Available G Sensitive

 Non-Sensitive S:\\DRP\\DRPDIR\\MIDCYCLE2004\\GG.wpd RIV:SPE/A C:DRP/A D:DRS D:DRP C:DRP/A signature TRFarnholtz WDJohnson DDChamberlain ATHowell WDJohnson

/RA/

/RA/

VLOrdaz for

/RA/

/RA/

8/16/04 8/17/04 8/25/04 8/26/04 8/27/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Grand Gulf Inspection / Activity Plan 08/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2004 07:51:03 Report 22 1

ALARA2

- ALARA PLANNING AND CONTROLS Baseline Inspections 11/15/2004 11/19/2004 ALARA Planning and Controls IP 7112102 1

1 PEB-07B

- HX & HEAT SINK PERFORMANCE TESTING Baseline Inspections 12/06/2004 12/10/2004 Heat Sink Performance IP 7111107B 1

3 PEB-52

- GG PIR INSPECTION Baseline Inspections 03/07/2005 03/11/2005 Identification and Resolution of Problems IP 71152B 1

Baseline Inspections 03/21/2005 03/25/2005 Identification and Resolution of Problems IP 71152B 1

3 OB-EP EX

- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections 03/21/2005 03/25/2005 Exercise Evaluation IP 7111401 1

Baseline Inspections 03/21/2005 03/25/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 03/21/2005 03/25/2005 Performance Indicator Verification IP 71151 1

1 PEB-12B

- MAINTENANCE RULE BIENNIAL Baseline Inspections 03/28/2005 04/01/2005 Maintenance Effectiveness IP 7111112B 1

4 PEB-05T

- TRIENNIAL FIRE PROTECTION Baseline Inspections 04/11/2005 04/15/2005 Fire Protection IP 7111105T 1

Baseline Inspections 05/02/2005 05/06/2005 Fire Protection IP 7111105T 1

3 OB-INIT

- INITIAL EXAM Not Applicable 07/25/2005 07/29/2005 GRAND GULF (05/05) - INITIAL EXAM X02285 1

Not Applicable 08/15/2005 08/19/2005 GRAND GULF (05/05) - INITIAL EXAM X02285 1

1 OB-RQ

- REQUAL INSPECTION Baseline Inspections 07/25/2005 07/29/2005 Licensed Operator Requalification Program IP 7111111B 1

2 EB02/17B

- 50.59 & PERMANENT PLANT MODS Baseline Inspections 08/29/2005 09/02/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 08/29/2005 09/02/2005 Permanent Plant Modifications IP 7111117B 1

4 RP TEAM

- RADIATION SAFETY TEAM INSPECTION Baseline Inspections 09/12/2005 09/16/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 09/12/2005 09/16/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

Baseline Inspections 09/12/2005 09/16/2005 Radioactive Material Processing and Transportation IP 7112202 1

Baseline Inspections 09/12/2005 09/16/2005 Radiological Environmental Monitoring Program IP 7112203 1

1 EB08B

- ISI Baseline Inspections 09/26/2005 09/30/2005 Inservice Inspection Activities - BWR IP 7111108G 1

1 ACRSA

- ACCESS CONTROL TO RAD SIGNIFICANT AREAS Baseline Inspections 10/17/2005 10/21/2005 Access Control to Radiologically Significant Areas IP 7112101 1

1 ALARA3

- ALARA PLANNING AND CONTROLS Baseline Inspections 12/12/2005 12/16/2005 ALARA Planning and Controls IP 7112102 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Grand Gulf Inspection / Activity Plan 08/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2004 07:51:03 Report 22 10 EB

- SSD&PC Baseline Inspections 02/06/2006 02/10/2006 Safety System Design and Performance Capability IP 7111121 1

Baseline Inspections 02/20/2006 02/24/2006 Safety System Design and Performance Capability IP 7111121 1

1 OB-EP1

- EMERG PREP PROGRAM Baseline Inspections 03/20/2006 03/24/2006 Alert and Notification System Testing IP 7111402 1

Baseline Inspections 03/20/2006 03/24/2006 Emergency Response Organization Augmentation Testing IP 7111403 1

Baseline Inspections 03/20/2006 03/24/2006 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 03/20/2006 03/24/2006 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1

Baseline Inspections 03/20/2006 03/24/2006 Performance Indicator Verification IP 71151 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.