MONTHYEARML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23312A2022023-11-0808 November 2023 Relief Request Acceptance Review Results; IST Impracticality P-1 P-2 RHR Containment Pumps ML23312A2962023-11-0808 November 2023 Email - Surry Relief Request Acceptance Review Results; Surry Unit 1 and 2 IST P-3 P-4 Pumps ML23283A3262023-10-10010 October 2023 Update Acceptance Review Status Surry TS Change Apply RG 1.97, Rev 3 Instrumentation to Lhsi ML23255A2772023-09-12012 September 2023 Acceptance of Requested Licensing Action: Surry TS Change, Lhsi Indication and Instrumentation ML23193A9552023-07-12012 July 2023 NRR E-mail Capture - Acceptance Review for VC Summer and Surry Relief Request (L-2023-LLR-0029) ML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23107A2212023-04-10010 April 2023 Amendment Turbine Building Wind Load Basis Reclassification License Amendment Request - State Consultation No Comment ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22354A0352022-12-19019 December 2022 Acceptance Email TSC Relocations LAR ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML23058A1442022-12-0909 December 2022 Record of Surry Verbal Relief Request Authorization - V-01 Mechanical Agitation Vavle 1-SI-241 ML22342A1002022-12-0707 December 2022 Relief Request Acceptance Review Results; Surry ISI Alternative, Prz and SG Welds and Nozzles ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22277A7252022-10-0303 October 2022 Additions to Turbine Bldg Wind Load Audit ML22256A2312022-09-13013 September 2022 Acceptance Email TS Change for New Fuel Framatome Agora and SFP Criticality Review ML22256A3032022-09-13013 September 2022 Change in Completion Hours Estimate Amendment Turb Bldg. Loading Basis Change LAR ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22224A1442022-08-11011 August 2022 Acceptance Email TS Change AFW Cross Connect AOT LAR ML22223A1182022-08-0404 August 2022 2022004 - Plant Surry RP Inspection - Document Request Letter E-mail ML22200A1032022-07-19019 July 2022 Acceptance of Requested Licensing Action: Surry Risk-Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML22193A0052022-07-11011 July 2022 Acceptance of Requested Licensing Action: Admin Changes to Technical Specifications ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22161B0052022-06-0909 June 2022 Acceptance Email TSTF 547 LAR ML22137A1622022-05-17017 May 2022 Acceptance of Requested Licensing Action Amendment Turb Bldg. Loading Basis Change License Amendment Request ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b ML21144A2592021-05-0606 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21098A2612021-04-0808 April 2021 Subsequent License Renewal Application, Response to Request for Additional Information Re Environmental Review ML21096A0952021-04-0101 April 2021 Federal Consistency Certification for the VEPCO Surry Power Station Units 1 and 2 Subsequent License Renewal, Us Nuclear Regulatory Commission, Surry County, (DEQ 17-121F) ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21069A3522021-03-10010 March 2021 NRR E-mail Capture - Acceptance Review for Topical Report DOM-NAF-2 VIPRE-D ML21055A5952021-02-24024 February 2021 NMFS to NRC Response to Nrc'S Jan 19, 2021 Letter Regarding an Atlantic Sturgeon Entanglement at Surry 2023-09-12
[Table view] |
Text
Andrew~~~
Kulr-R:Ceia plcto pcfctosPgi Aqqrqw ugler - RE: Chemiqak.Appliction fagqjj From: <TonyBanks@dom.com>
To: "Sackschewsky, Michael R" <michael.sackschewsky@pnl.gov>
Date: 8/10/04 2:36PM
Subject:
RE: Chemical Application Specifications Mike - Sorry for the confusion - this species has not been seen or reported either on site or within our t-ine ROWs, from any of us on the Dominion team (house or contract). However, the species (evidently per VDGIF) is known to be present in the vicinity (tidewater region) of the Surry Power Station and/or t-lines, and the habitat within the tidewater region, as I understand it, would certainly be conducive to the presence of the species, but not within areas very much further west of the region.
I think the wording on page 80 below is a variation on a theme.
Thanks, Tony "Sackschewsky, Michael R" To: Tony-Banks~dom.com
<michael.sackschews cc: "Parkhurst, Mary Ann" <maryann.parkhurst@pnl.gov>,
ky@pnl.gov> "Miller, Beverly M" <Beverly.Miller@pnl.gov>, AJK1 @nrc.gov, JXC9@nrc.gov, rlbaker@ bechtel.com, Joseph-Hegner@dom.com 08/10/2004 01:58 PM
Subject:
RE: Chemical Application Specifications The Surry SEIS does include the barking tree frog in the table 2-3 on page 2-24, however, it goes on to state (page 2-25):
Besides the bald eagle, none of the other animal or plant species in Table 2-3 are currently known to occur on the Surry Power Station site or along the related transmission corridors (VEPCo 2001 c)."
However, the Dominion/Bechtel Study of Potential Sites states in Part 3, Page 80:
"With the exception of the barking tree frog and the bald eagle, terrestrial species that are federal and/or state-listed as endangered or threatened are not known to exist at the Surry site or along the corridors of its associated transmission lines.'
Hence my question: Is or is not the barking tree frog found on the Surry
,Andrew Kugler - RE: Chemical App!ication Specifications Page 2 site or in it's transmission line ROW's?
Information from the VDGIF lacks any reports from the Site, but indicates that the species is certainly in the general vicinity of the transmission lines if not the site itself.
I never meant to make a big deal about this, it is not that important, but if someone has any other information about the presence on site, I would like to see it.
Original Message-----
From: Tony-Banks@dom.com @dom.com
Sent: Monday, August 09, 2004 1:09 PM To: Sackschewsky, Michael R Cc: Parkhurst, Mary Ann; Miller, Beverly M; AJK1 @nrc.gov; JXC9@nrc.gov; rlbaker@ bechtel.com; Joseph-Hegner@ dom .com
Subject:
Chemical Application Specifications Mike - attached are the 2 docs I believe you are referring to, as well as another 7-page guideline our Forestry Dept has used. The compilation of the Forestry Dept's ROW maintenance practices I have been told is on the FERC website.
Also - for the barking tree frog - it is listed in Surry's FEIS NUREG-1437 Supplement 6 on pages 2-24 and 2-25.
(See attached file: Herbicide Application (foliar)
Specifications.doc)(See attached file: Herbicide Application (basal)
Specifications.doc) (See attached file: Pages from Dominion T-Line Maintenance Docs.pdf)
Thank you, Tony Banks, MPH, CHMM Dominion ESP Project Project Lead - Environmental 804/273-2170 CC: <AJK1 @nrc.gov>, "Miller, Beverly M" <Beverly.Miller~pnl.gov>,
<Joseph-Hegner dom.com>, <JXC9@nrc.gov>, "Parkhurst, Mary Ann" <maryann.parkhurst pnl.gov>,
<rlbaker bechtel.com>, <BillBolin dom.com>, <GlennBishop dom.com>, <pattersonk~ttnus.com>
[ C:\WIND0WS\TEMP\qYV)00001.TMP - .- :.W.N.D.W.\TEMP .O..... _TM. Page 11I Mail Envelope Properties (411915A5.97E: 16: 59774)
Subject:
RE: Chemical Application Specifications Creation Date: 8/10/04 2:34PM From: <Tonv Banks@dom.com>
Created By: Tonv Banks@dom.com Recipients nrc.gov owf4_po.OWFN_DO AJKI CC (Andrew Kugler)
JXC9 CC (Jack Cushing) ttnus.com pattersonk CC domr.com Glenn_Bishop CC BillBolin CC Joseph_.Hegner CC bechtel.com rlbaker CC pnl.gov maryann.parkhurst CC (Mary Ann Parkhurst)
Beverly.Miller CC (Beverly M Miller) michael.sackschewsky (Michael R Sackschew Post Office Route owf4_po.0WFNDO nrc.gov ttnus.com dom.com bechtel.com pnl.gov Files Size Date & Time MESSAGE 3749 08/10/04 02:34PM Mime.822 5078 Options Expiration Date: None Priority: Standard Reply Requested: No
IC:\WINDOWS\TEMP\GW)00001 .TMP , Page 21 Return Notification: None Concealed
Subject:
No Security: Standard