Midcycle Performance Review and Inspection Plan - Wolf Creek Generating Station
ML042440673
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 08/30/2004
From: Graves D
NRC/RGN-IV/DRP/RPB-B
To: Muench R
Wolf Creek
References
Download: ML042440673 (6)


Text

August 30, 2004 Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

WOLF CREEK GENERATING STATION

Dear Muench:

On August 5, 2004, the NRC staff completed its midcycle plant performance assessment of Wolf Creek Generating Station. The midcycle review for Wolf Creek Generating Station involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and inspection plan does not include physical protection information.

A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2006.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 12 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's

Wolf Creek Nuclear Operating Corporation document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ PHHarrell for David N. Graves, Chief Project Branch B Division of Reactor Projects Docket: 50-482 License: NPF-42

Enclosure:

Wolf Creek Inspection/Activity Plan cc:

Site Vice President Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839 Jay Silberg, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Rd.

Topeka, KS 66604-4027 Office of the Governor State of Kansas Topeka, KS 66612

Wolf Creek Nuclear Operating Corporation Attorney General 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839-1798 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Frank Moussa, Technological Hazards Administrator Department of the Adjutant General 2800 SW Topeka Blvd.

Topeka, KS 66611-1287 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Wolf Creek Nuclear Operating Corporation Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (FLB2)

Resident Inspector (TBR2)

SRI, Callaway (MSP)

Branch Chief, DRP/B (DNG)

Senior Project Engineer, DRP/B (RAK1)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (KEG)

RidsNrrDipmIipb ADAMS:  Yes G No Initials: __ath__

 Publicly Available G Non-Publicly Available G Sensitive

 Non-Sensitive S:\\DRP\\DRPDIR\\Midcycle 2004\\WC.wpd RIV:C:DRP/B D:DRS D:DRP C:DRP/B Signature DNGraves;df DDChamberlain ATHowell DNGraves

/RA/

VLOrdaz for

/RA/

PHHarrell for 8/13/04 8/25/04 8/27/04 8/27/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Wolf Creek Inspection / Activity Plan 08/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2004 07:53:33 Report 22 4

PEB-52

- BIENNIAL PIR Baseline Inspections 08/02/2004 08/06/2004 Identification and Resolution of Problems IP 71152 1

4 RP TEAM

- RAD SAFETY TEAM Baseline Inspections 08/16/2004 08/20/2004 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 1

Baseline Inspections 08/16/2004 08/20/2004 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 1

Baseline Inspections 08/16/2004 08/20/2004 Radioactive Material Processing and Transportation IP 7112202 1

Baseline Inspections 08/16/2004 08/20/2004 Radiological Environmental Monitoring Program IP 7112203 1

1 ACRSA

- ACCESS CONTROL FOR RAD SIGNIFICANT AREAS Baseline Inspections 03/28/2005 04/01/2005 Access Control to Radiologically Significant Areas IP 7112101 1

5 EB21/02

- SSD&PCI/50.59 Baseline Inspections 06/27/2005 07/01/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1

Baseline Inspections 07/11/2005 07/15/2005 Safety System Design and Performance Capability IP 7111121 1

1 ALARA2

- ALARA PLANNING AND CONTROLS Baseline Inspections 06/20/2005 06/24/2005 ALARA Planning and Controls IP 7112102 1

1 PEB-07B

- HX PERFORMANCE Baseline Inspections 09/12/2005 09/16/2005 Heat Sink Performance IP 7111107B 1

3 OB-RQ

- REQUAL INSPECTION Baseline Inspections 09/19/2005 09/23/2005 Licensed Operator Requalification Program IP 7111111B 1

1 EB08P

- ISI Baseline Inspections 09/26/2005 09/30/2005 Inservice Inspection Activities - PWR IP 7111108P 1

Baseline Inspections 10/03/2005 10/07/2005 Inservice Inspection Activities - PWR IP 7111108P 1

1 PEB-12B

- MAINTENANCE RULE BIENNIAL Baseline Inspections 10/03/2005 10/07/2005 Maintenance Effectiveness IP 7111112B 1

4 PEB-05T

- TRIENNIAL FIRE PROTECTION Baseline Inspections 11/14/2005 11/18/2005 Fire Protection IP 7111105T 1

Baseline Inspections 11/28/2005 12/01/2005 Fire Protection IP 7111105T 1

3 OB-EP EX

- EMERG PREPAREDNESS EXERCISE Baseline Inspections 11/14/2005 11/18/2005 Exercise Evaluation IP 7111401 1

Baseline Inspections 11/14/2005 11/18/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1

Baseline Inspections 11/14/2005 11/18/2005 Performance Indicator Verification IP 71151 1

3 PEB

- WC PIR INSPECTION Baseline Inspections 01/30/2006 02/03/2006 Identification and Resolution of Problems IP 71152B 1

Baseline Inspections 02/13/2006 02/17/2006 Identification and Resolution of Problems IP 71152B 1

2 EB

- PERMANENT PLANT MODS Baseline Inspections 02/06/2006 02/10/2006 Permanent Plant Modifications IP 7111117B 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Wolf Creek Inspection / Activity Plan 08/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2004 07:53:33 Report 22 1

OB-INIT

- INITIAL EXAM Not Applicable 02/13/2006 02/17/2006 WOLF CREEK INITIAL EXAM (03/06)

X02293 1

Not Applicable 03/06/2006 03/10/2006 WOLF CREEK INITIAL EXAM (03/06)

X02293 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.