Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066B915 + (23:40:18, 16 December 2024)
- ML20066B908 + (23:40:19, 16 December 2024)
- ML20066B894 + (23:40:20, 16 December 2024)
- ML20066B900 + (23:40:20, 16 December 2024)
- ML20066B888 + (23:40:21, 16 December 2024)
- ML20066B873 + (23:40:21, 16 December 2024)
- ML20066B871 + (23:40:22, 16 December 2024)
- ML20066B865 + (23:40:22, 16 December 2024)
- RBG-13-655, Interim Deficiency Rept DR-76 Re Applications of Large & Small Bore Pipe Support Welds Which May Be Less than Min Weld Size Required by ASME Stds.Initially Reported on 820930.Investigation Continuing.Final Rept Due by 821214 + (23:40:23, 16 December 2024)
- JAFP-82-1185, Forwards Monthly Operating Rept for Oct 1982 + (23:40:24, 16 December 2024)
- ML20066B858 + (23:40:24, 16 December 2024)
- ML20066B855 + (23:40:25, 16 December 2024)
- ML20066B853 + (23:40:25, 16 December 2024)
- 05000324/LER-1982-105-03, /03L-0:on 821006,control Rods 18-23 & PT-14.2.1 Exceeded Required 7-s to Fully Insert.Caused by Failure of Rod Hyraulic Control Unit Scram Pilot Valves SV-117 & 118 to Bleed Off Noninterruptible Instrument Air + (23:40:27, 16 December 2024)
- 05000324/LER-1982-105, Forwards LER 82-105/03L-0 + (23:40:28, 16 December 2024)
- RBG-13-714, Ack Receipt of NRC 810330 Request for Evaluation of Analyses to Determine Ultimate Capacity of Mark III Containment.S&W Completing Analyses on Containment Boundary.Results Expected by 830531 + (23:40:28, 16 December 2024)
- RBG-13-649, Interim Deficiency Rept DR-23 Re HPCS Diesel Generator Radiant Heat Loss Value Used in Sizing of HPCS Room Cooling Design.Initially Reported on 820212.Util Awaiting Addl Info from Ge.Next Rept Expected by 830215 + (23:40:34, 16 December 2024)
- ML20066B823 + (23:40:35, 16 December 2024)
- 05000335/LER-1982-047-03, /03L-0:on 820930,reactor Protection Sys Logic Matrix Relay BD-2 Failed During Periodic Testing.Caused by Relay Being Electrically Opened.Relay Replaced.Periodic Testing Will Identify Future Similar Failures + (23:40:36, 16 December 2024)
- 05000335/LER-1982-047, Forwards LER 82-047/03L-0 + (23:40:37, 16 December 2024)
- ML20066B803 + (23:40:38, 16 December 2024)
- 05000272/LER-1982-076-03, /03L-0:on 820930,diesel Fire Pump 1 Would Not Start in Automatic Mode of Operation During Surveillance Testing.Caused by Stuck Fire Suppression Sys Header Low Pressure Switch.Switch Freed & Exercised + (23:40:39, 16 December 2024)
- ML20066B798 + (23:40:41, 16 December 2024)
- ML20066B793 + (23:40:41, 16 December 2024)
- ML20066B787 + (23:40:42, 16 December 2024)
- 05000325/LER-1990-027, :on 901205,unexpected Reactor Bldg Ventilation Isolation & ESF Actuation Occurred.Caused by Inadequate Clearance for Plant Mod to Relocate Power Source.Circuits Reenergized to Reset Isolation + (23:40:44, 16 December 2024)
- BVY-90-127, Suppls 900927 Response to Generic Ltr 90-03 Re Ongoing Process for Updating safety-related Equipment Vendor Manuals.Process Completion Delayed Beyond End of 1990 Due to Identification of Addl Equipment Manuals + (23:40:45, 16 December 2024)
- ML20066B780 + (23:40:45, 16 December 2024)
- 05000272/LER-1982-076, Forwards LER 82-076/03L-0.Detailed Event Analysis Encl + (23:40:46, 16 December 2024)
- U-601767, Clarifies 880906 Application for Amend to License NPF-62 to Support First Refueling & Subsequent Reactor Operation in Max Extended Operating Domain + (23:40:46, 16 December 2024)
- 2CAN019101, Special Rept:On 901219,fire Pumps Inoperable During Performance of Surveillance Test.Method of Performing Surveillance Procedure Will Be Revised by 910301 + (23:40:47, 16 December 2024)
- ML20066B766 + (23:40:47, 16 December 2024)
- 05000260/LER-1982-030-03, /03L-0:on 821006,small Pinhole Leak Discovered in 3-inch Fire Protection Line Which Supplies Water to Cable Tray Fixed Water Spray Sys.Caused by through-wall Pitting Corrosion attack.Through-wall Hole Welded & Tested + (23:40:49, 16 December 2024)
- ML20066B755 + (23:40:50, 16 December 2024)
- ML20066B754 + (23:40:51, 16 December 2024)
- ML20066B749 + (23:40:51, 16 December 2024)
- BVY-90-125, Advises That Util Intends to Install Containment Overpressure Protection Capability by Means of Passive Hardened Wetwell Vent During Next Refueling Outage Scheduled for Mar 1992 + (23:40:52, 16 December 2024)
- ML20066B748 + (23:40:52, 16 December 2024)
- 05000260/LER-1982-030, Forwards LER 82-030/03L-0 + (23:40:56, 16 December 2024)
- ML20066B739 + (23:40:57, 16 December 2024)
- ML20066B736 + (23:41:00, 16 December 2024)
- ML20066B733 + (23:41:02, 16 December 2024)
- 05000260/LER-1982-032-03, /03L-0:on 821006,MSIVs 1-14,1-15,1-26,1-27,1-37, 1-38 & 1-52 Exceeded Allowable Leak Rate of 11.5 Std Cubic Ft Per Hour.Caused by Atwood-Morrill Globe Valves Leaking Past Main Seat.Valves Will Be Repaired + (23:41:03, 16 December 2024)
- ML20066B730 + (23:41:04, 16 December 2024)
- 05000311/LER-1982-122-01, /01T-0:on 821018,small Svc Water Leak Found in Containment Fan Coil Unit 22.Caused by Accelerated Erosion Due to Silt in Svc Water.Leaking Coil Blanked Off.New Design Cooler Will Be Installed During Outage + (23:41:05, 16 December 2024)
- SNRC-1781, Requests That NRC Consider Proposed Decommissioning Plan as One Which Must Be Submitted Prior to or W/Application for Termination of License,Per 10CFR50.82 & That Fees Be Charged to Plant & Forwarded to Util for Payment + (23:41:06, 16 December 2024)
- 05000267/LER-1982-040, Forwards LER 82-040/03L-0.Detailed Event Analysis Encl + (23:41:07, 16 December 2024)
- ML20066B723 + (23:41:08, 16 December 2024)
- 05000416/LER-1982-091-03, /03L-0:on 821006,LPCS Taken Out of Svc to Perform Surveillance Procedure 06-ME-1M61-V-0001,leaving One of Two ECCS HPCS Operable.Caused by Standby Diesel Generator Being Out of Svc to Resolve Defective Capscrew + (23:41:09, 16 December 2024)
- ML20066B719 + (23:41:10, 16 December 2024)
- 05000311/LER-1982-122, Forwards LER 82-122/01T-0.Detailed Event Analysis Encl + (23:41:11, 16 December 2024)