o 1

%,_ ~

?

TENNESSEE VALLEY AUTHORITY t

l P. O. Box 2000 Decatur,~ Alabama-DEC 31390 1

U.S.INuclear Regulatory Commission ATTN:-' Document Control Desk i

'I

-Washington, D.C.

20555 i

I Gentlemen:

In the Matter of

)

Docket "os. 50-259 Tennessee' Valley Authority

)

50-260

't 50-296 l

BROWNS FERRY NUCLEAR PLANT (BFN) - GENERIC LETTER 89-13, SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT l

By letter dated March 16,-1990, TVA responded to the subject Generic Letter.

This letter. included three commitments which were to be-completed in the near

. t e rm.- These commitments were:-

_(1). To include the current BFN heat exchanger inspection program in the

'I preventative maintenance program by December 31, 1990 (This program would.

l be revised to include the Shutdown Board Room Coolers and the H 0 22 l

L Analyzer. Coolers),

L (2).=To-revise.the. Residual Heat Removal Service Water and' Emergency Equipment-Cooling Water systems. maintenance instructions by December 31, 1990 to l4

. require notification of the system engineer if clams, excessive silt, or i

Lother blockage are present when the systems are opened, and 1

-(3).To revise / raining lesson plans for licensed and non-licensed operators, j

t h

Maintenance and Technical training, and Chemistry training by 0

January 31,~1991:to satisfy the Generic Letter.-

[(

The lob ginal-- dates:provided for. these-commitments vere based on a Fall 1990 -

l

! completion schedule for the work to restart BFN Unit 2.

This_ work is still ongoing, therefore, these commitments will not be completed by the original L

dates provided.. Thele commitments will be completed.by March 31, 1991.

If L

you.have any. questions, please contact Patrick P. Carter,' Manager of Site

.]

t~

Licensing, at (205) 729-3570.

fl l

Very truly yours, TENNESSEE VALLEY AUTHORITY 7'

Y 9101080390 901231 d

-[b Pat-ri'ck P. Carier, Manager jDR ADOCK 0500 9

of Site Licensing

[cc: See page 2 0h g

LOMO2,5?

^"'a"

"" "ar E = a' va'

~

1

-l -

o c.

U.S.' Nuclear _ Regulatory Commission

.l

,,7 DEC 11 1 1990-ces;-Ms.18. C.-Black, Deputy Director Project' Directorate II-4 U.S. Nuclear Regulatory. Commission

- -i One White Flint,_ North 11555 Rockville Pike, Rockville, Maryland --l20852 -

t NRG Resident Inspector Browns Ferry Nuclear Plant

-Route 12, Box 637' Athens, Alabama-35609-2000 Mr. Thierry M. Ross, Project Manager 4

U. S. Nuclear Regulatory Commission lOne White Flint, North 7

4

'11555 Rockville Pike Rockville, Maryland 20852 Mr.1 B.i A. _ Wilson, Proj ect ' Chief U.S.. Nuclear-Regulatory Commission Region:II-

.101 Marietta' Street,-NW,' Suite.2900 Atlanta,' Georgia 30323

.-(

f i

T

-?

l

+

J.

-~ -.

. -, - -