MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
.
OPERATING DATA REPORT DOCKET NO. 50-333 DATE November 1982 C051PLETED BY J . Cook TELEPilONE (315)342-3840 OPERATING STATUS FITZPATRICK Notes
- 1. Unit Name:
- 2. Reporting Period: 821001 - 821031
- 3. Licensed Thermal Power (51WI): 2436
- 4. Nameplate Rating (Gross MWe): 883
- 5. Design Electrical Rating (Net 51We): 821
- 6. Maximum Dependable Capacity (Gross MWe): . 830
- 7. Masimum Dependable Capacity (Net MWe):
810
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: ,
- 9. Power Lesel To Which Restricted,If Any (Net MWe): NONE
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date Cumulatise
- 11. Ilours In Reporting Period 745 7296 63673
- 12. Number Ofilours Reactor Was Critical 494.5 5376.9 44928.1
- 13. Reactor Resene Shutdown flours 0 0 0
- 14. Ilours Generator On.Line 478.5 5258.1 43701.7
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1015776 12061416 90462730
- 17. Gross Electrical Energy Generated (MWil) 339140 4081040 30841650
- 18. Net Electrical Energy Generated (MWil) 329095 3960240 29864970
- 19. Unit Senice Factor 64.2% 72.1% 68.6%
- 20. Unit Availability Factor 64.2% 72.1% 68.6%
- 21. Unit Capacity Factor (Using MDC Net) 54.5% 67.0% 62.0%
- 22. Unit Capacity Factor (Using DER Net) 53.8% 66.1% 57.1%
- 23. Unit Forced Outage Rate 35.8% 7.2% 15.9%
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Each1:
- 25. If Shut Down At End Of Report Period. Estimated Date d Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forcust Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION
~
521'1090221 '821104 PDR ADOCK 05000333 PDR
- R. -
_ - _ _ _ m -J
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. . 50-133 UNIT JAFNPP DATE NOVEMBER 1982 COMPLETED BY J. COOK TELEPilONE CL151142-38.40 MONHI OCTOBER 1982 DAY AVER AGE DAILY POWER LEVE(. DAY AVER AGE DAILY POWER LEVEL (MWe Ne:) (MWe Net) i 19.2 17 795 is 67 2
799 19 367 3
4 797 20 442 797 21 450 5
795 22 512 6
393 23 636 7
--- 730 g 24
'~~
25 785 9
26 791 io 11 27 794 28 794 12 29 788 13 39 628 34
~~~
31 767 15
SUMMARY
- The FitzPatrick plant operated at near full thermal power during this reporting period with one outage due to main steam isolation failure and one power reduction for condensate booster pump repair.
(.
DOCKET NO. 50-333 UNIT SHUTDOWNS AND POWER REDUCTIONS JAFN FI' UNIT N AME ~
DATE NOVEMBER 1982 COMPLETED BY J. COOK REPORT.MONTil OCTOBER 1982 TELEPIIONE (315)342-3840 n.
No.
-, .! ? 3 ) .E Licensee Eg o Cause & Currective Date i 3? i .s i 5 Event g? g3 Action to
$ ., 5 5 e ;5 =!
Report a mV o' u
Prevent Recurrence 6
7 821007 -
F 266.5 A 3 82-047 HB VALVEX "D" inboard MSIV failure due to disc seperation from stem.
Repaired valve with two anti-rotation pins.
8 821030 S 0 H 4 N/A HH PUMPXX Reduced power for "A" condensate booster pump repair I 2 3 4 F: Forced Reason: Method: Exlubit G. Inst:uctions S: ScheJ ufed A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File INUREG.
D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F. Administrative 5 G Operational Error (Explain) Estubit I . Same Source Il Other (Explain) +
PdWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT
-NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE NOVEMBER, 1982 The unit operated at near full thermal power _.for the first orting period..On 821007 six to days of the failure ofrep'D" the inboard main steam isolation valve and onthe unit tripped due 821030 power was reduced for "A" condensate booster pump repai?r.
At the end of the reporting period the unit is operating at approximately 767 MWe. .
s t
.N.
\
\.
1 i
%g i
a t
3 4
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
OCTOBER 1982 WORK REOUEST# REPAIR DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE TIME PON # HOURS l'0/15 23 21810 VISUAL Worn packing Repacked 6 HPI-52 10/15 10 18317 OPS Using pipe wrenches and Replaced valve stems and RHR-755B, channel locks on valve handwheels, repacked 32 756B,757B, stems 758B 10/15 10 18758 OPS Handwheels vibrated off Replaced handwheels 2 RHR-755A, 756A,757A, 758A 10/16 27 18760 OPS Air line worn through Replaced damaged portion of air 8
'L' Target line, wrapped to prevent further Rock abrasion 10/15 23 21801 VISUAL Blown bonnet gasket Replaced bonnet gasket 16 AOV-53 10/15 10 16209 N/A N/A Replaced carbon steel cetter pin 3 RHR-14D with stainless steel 10/15 10 16208 RHR-14B N/A N/A Replaced carbon steel cotter pin 3 with stainless steel 10/14 23 20947 VISUAL Worn packing Repacked 2 Steam Trap Drain Valve 10/14 23 18342 VISUAL Worn packing Repacked 2 HPI-900 1
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL & h ECHANICAL MAINTENANCE
SUMMARY
OCTOBER 1982 OR EQ EST DATE SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 10/16 29 18806 OPS Maintenance work on Adjusted limit switches 2.5 MSIV valve A0V-86D LO/16 29 14976 N/A N/A Installed new 90% limit switches 95
- MSIV per MI-82-80 A0V-80-A-D IO/15 46 16222 N/A N/A Replaced carbon steel cotter pin 3 ESW-1B with stainless steel LO/13 02-2 16375 VISUAL Oil leaks Visual inspection 3 Grinnell snubbers LO/7 01-125 18235 OPS Depleted charcoal Replaced charcoal 60 Standby Gas absorption capacity Filter F-2A LO/13 02 20857 TEMPERATURE Leaking first stage Replaced first stage 116 RV-71F INDICATION valve LO/10 10 17710 VISUAL Deteriorated sealtite Replaced sealtite with NWC type 7 MOV-21A 10/10 23 20995 VISUAL Eroded / corroded Replaced fitting 12 HPCI drain- fitting line 10/12 27 11360 N/A N/A Completed Step 8 (1-4) of ECR 6 Primary 80-16-34 containment Hi-Hi-Rad relays
POWER AUTHORITY OF THE STATE OF NEW YORK 1 JAMES A. FITZPATRICK NUCLEAR POWER PLANT 2
SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
OCTOBER 1982 DATE SYSTEM EO S HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T 10/12 29 16380 OPS Pilot disk to stem Installed two interference fit 192 Caused MSIV locking pin sheared pins instead of one, in both A0V-80D shutdown pilot to stem and piston to main disc .
10/73 OPS Testing No malfunction. This 29 18796 Installed two interference fit 170 MSIV indicated valve was not broken lock pins instead of one, in both A0V-860 valve was pilot to stem and piston to main seperated disc 10/9 7: 17126 N/A N/A Traced circuits to correct 25 AC-A2, B2 drawings i
10/13 71 14975 N/A N/A Drilled t" weepholes in boxes per 16 lE Junction MI-82-082 Boxes 10/15 23 14312 VISUAL Broken nipple Replaced nipple 3 P-1 10/14 23 18330 VISUAL W'orn packing Repacked 20 MOV-14 10/17 71 14891 N/A N/A Performed preventative 10 Bkr-10404 maintenance 10/15 71 I4392 N/A N/A Performed preventative 12 Bkr-10614 maintenance 10/16 71 14893 N/A N/A Performed preventative 5 Bkr-10612 maintenance 10/15 71 14894 N/A N/A Performed preventative 5 Bkr-10602 maintenance
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT SAFETY RELATED ELECTRICAL a MECHANICAL MAINTENANCE
SUMMARY
OCTOBER 1982 DATE R O SYSTEM HOW DETECTED CAUSE OF MALFUNCTION ACTION TAKEN TO PRECLUDE RECURRENCE T ME E
HOURS l'0/15 71 14895 N/A N/A Performed preventative 5 Bkr-10604 maintenance
- 10/15 71 14896 N/A N/A Performed preventative 13 ,
Bkr-10660 maintenance 10/16 71 14816 N/A N/A Connected temporary power supply 6 IBC-3, 4 to nuclear instruments for bus outage and disconnected 10/16 13 19122 VISUAL Worn packing Repacked 6 MOV-16 10/16 13 18537 VISUAL Worn packing and Repacked and replaced pressure 6 MOV-131 thermal cycling seal 10/16 02 20884 OPS Worn packing MOV-53B torqued packing 10 MOV-53B,54B MOV-54B repacked 10/19 27 18870 OPS Limit switch out of Adjusted limit switch 4 AOV-132A adjustment 10/20 93 18861 OPS No power indication Replaced lamp ,
.5 ECP-D 10/20 27 18869 OPS Relief valve out of Reset valve 17 SV-ll4B adj ustment 10/16 34 18801 VISUAL Blown bonnet gasket f4achined bonnet to' remove steam 34 FWS-28B cut-replaced gasket 10/16 02 19246 PRESSURE Worn seal-some Replaced shaft seal with a 306 P-1B INDICATION evidence of thermal rebuilt cartridge shock
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
T&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM HOW DETECTED COMPONENT # MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 18219 10/12 02 PS-134C IGC Use, normal Drain valve Replaced wear leaks drain valve 2 '
18234 Use, normal Test valve Replaced test 10/12 02 PS-128B I&C wear leaks valve .5 20326 Possible loose Red pen Tightened all 10/11 02 TR-165 OPS connection indicating connections 18 downscale 20826 Defective pre No bias Replaced pre 10/14 02 VRM-71F I&C amp adjustment amp 4 18142 Defective Indicat6r Replaced amp, 10/16 02-3 LI-85A OPS amplifier board failed re-aligned 20 downscale un2.t 18191 Recorder Recorder Cleaned and 10/08 02-3 FR/PR-95 OPS dirty sticks calibrated 3 18215 Instrument Scale out of Per ISP-3.5 9/30 02-3 'LI-85B OPS drift calibration adjusted span 20 and zero 18225 Use, normal Test valve Replaced 10/12 02-3 PS-52A I&C wear leaks valve 1 20332 Vent valves on Replaced vent 10/13 02-3 LIS-72A-D I&C Use yarways worn valves 10 18186 Defective rod Unable to Replaced select 10/11 03 34-39 OPS select switch select rod 34- push button 10 m
18666 Broken wire on Unable t 10/17 03 26-51 OPS select switch select rod 26- Replaced broken 26-si 51 wire 3
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF ACTIO?: TAKEN REPAIR DATE SYSTEM HOW DETECTED COMPONENT # MALFUNCTION MALFUNCTION TO PRECLUDE TIME RECURRENCE HOURS 18866 Broken wire on Unable t rod select select rod 26-Replaced 10/17 03 26-51 OPS broken wire 3 switch 51 20829 Tests indicated Performed IMP-need to reset on various Tested units .
10/11 03 HCU (var) I&C per WRED 50 18126 Corrosion on Full in/ full connector pins out light Cleaned 10/14 07 10-39 OPS inop connector 21 18237 Verify core Hand probed tops for D tip tubes for 10/17 07 Tip D RXA None machine tops 8
18243 VR2 in mean No downscale IRM B I&C aced 10/08 07 sqyare analog trip on 14 unit IRM B Connector 18425 rV 28-21A Replaced 10/11 07 LPRM 28-21 OPS en d wnscale connector 9 18511 Dirty Gleaned and connector 12-45D 10/11 07 'LPRM 12-45 OPS under vessel downscale tightened 5 connector 18901 . Recorder not n set t PR-46B OPS indicating Adjusted gain 2 10/29 07 normal 18969 No lights Replaced bulbs, 10/25 07 34-07 OPS Bad bulbs for rod 34-07, ran IMP-3.7 3 26-15 18972 Reset inop 10/21 07 APRM E OPS None None ]j ! #
- 1 18988 e rod Checked as 10/26 07 APRMS RXA None requested 11.5 se@o M s
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C OCTOBER 1982
- ES A DATE SYSTEM HOW DETECTED CO PONENT ] # LFUNC ON ML Cl REC S 18990 Momentum of None, rec.
~
10/24 07 Tip D OPS Re d light selector switch chng 1 ch at a 4' time 19544 Rod select RBM A won't Replaced ,
10/12 07 26-47 OPS push button select for select push 7 failed 26-47 button 19654 Dirty 10/11 07 LPRM 20-29 OPS connector c or under vessel 3 19738 Rod select RBM B won't Replaced 10/12 07 10-35 OPS Push button select for s6 lect push 5
failed 10-35 button 21752 Disch. press 10/01 08 Air Comp OPS Vibration gauge broken Replaced gauge 4 18987 Possible Lower than Charged X-104D 10/27 16 Elec Pens OPS leakage normal pressure C/X-101C/X- 15 103A 18928 MV outpot at 10/26 16-1 -DPIT-102 I&C zero, n R d eg changes b 18759 V2 voltage Spurious Calibrated 10/17 17 RM-150B OPS high from power downscale per ISP-19 6 srg trips 18810 Defective Chart paper Replaced 10/12 17 RR-433 OPS chart drive not chart drive 4
motor advancing motor 20934 OPS ImPr Per probe Set Proper 8/13 17 RIS-459 Ins drift hi voltage voltage 4 18158 Br during Br indicator Replaced 9/22 20 FR-528 I&C ISP-15 arm indicator arm 8
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF ACTION TAKEN REPAIR DATE SYSTEM HOW DETECTED TO PRECLUDE COMPONENT # MALFUNCTION MALFUNCTION TIME RECURRENCE HOURS 20834 Numerous adj Several Reca11brateo 10/14 20 DWL sumps I&C during instruments out all sump .
operation of calibration loops 300 18218 Analyzer Hydrogen Calibrated 10/06 27 "**d*d analyzer 12 '
HfAZ-101A OPS .
calibration downscale Per ISP-30 14856 L se guide switen not Tightened bar' n 90% e t, 10 10/16 29 A0V-86D OPS r e set switch 14976 Modification of Post work Calibrated 90%
10/16 29 A0V-80A-D OPS 90% limit calibration suitches 30 switch 18865 90% switch Relays not . Corrected A0V-80A OPS wiring energized with 10/16 29 error valve open wiring error 15
""U 10/17 29 18867 A0V-86D OPS Cam upper plate loose 90% switch won't reset hk setpoint 6
22001 Check 10/26 46 ~PI-ll2A OPS None calibration None required 1 22059 Rear cable Recorder will Installed cable 10/27 68 TR-103 OPS disconnected not operate calibrated 6 14863 V61tmeter out Station battery Calibrated 10/04 71 Bat. A vm OPS of calibration low volts indicator 4 20831 Verified 10/08 71 RPS-EPA I&C None None setpoints 2 20836 Routine .
ation of Calibrated 10/17 71 10600 BUS I&C None 10600 BUS relays 198
POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
I&C OCTOBER 1982 WORK REQUEST # CAUSE OF RESULTS OF Tl K REPAIR DATE SYSTEM HOW DETECTED COMPONENT # MALFUNCTION MALFUNCTION RECURRENCE HOURS 22104 10614 Check relay Checked as 10/28 71 OPS None set points directed 8*
18814 Defective Supervisory Replaced 10/22 76 Zone 2 OPS input module alarm in module 32 ,
18973 Defective Supervisory Replaced 10/26 76 Zone 12 OPS input module alarm in module 16 17610 Loose pointer Select switch Tightened as 10/12 93 Temp Selec OPS dial out of synch required 12