Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069H731 + (15:44:00, 16 December 2024)
- 05000254/LER-1982-020-03, /03L-0:on 820920 & 21,RCIC Area High Temp Isolation QIS-28,3 Switches 1-1360-14A,1-1360-17B & 1-1360-16C,would Not Trip.Cause Not Specifically Determined. Failed Switches Returned to Manufacturer for Analysis + (15:44:02, 16 December 2024)
- ML20069H727 + (15:44:03, 16 December 2024)
- ML20069H724 + (15:44:04, 16 December 2024)
- ML20069H722 + (15:44:04, 16 December 2024)
- ML20069H721 + (15:44:05, 16 December 2024)
- ML20069H720 + (15:44:05, 16 December 2024)
- HNP-94-048, Forwards Rev 7 to Security Plan,Per 10CFR50.54(p)(2).Rev Withheld + (15:44:06, 16 December 2024)
- ML20069H717 + (15:44:06, 16 December 2024)
- 3F0694-06, Forwards Rev 7 to Training & Qualification Plan.Rev Withheld + (15:44:07, 16 December 2024)
- ML20069H705 + (15:44:07, 16 December 2024)
- ML20069H697 + (15:44:08, 16 December 2024)
- 05000302/LER-1982-058-01, /01T-0:on 820924,valve Lineups Identified Which Allow Once Through Steam Generator Drain Lines to Be Used for Blowdown Operations & Also Allows High Energy Fluid Through Lines.Caused by Inadequate Review of Sys Design + (15:44:10, 16 December 2024)
- ML20069H694 + (15:44:11, 16 December 2024)
- ML20069H690 + (15:44:12, 16 December 2024)
- ML20069H692 + (15:44:12, 16 December 2024)
- ML20069H689 + (15:44:13, 16 December 2024)
- ML20069H688 + (15:44:14, 16 December 2024)
- ML20069H686 + (15:44:14, 16 December 2024)
- ML20069H683 + (15:44:15, 16 December 2024)
- NRC-94-4156, Forwards Nonproprietary & Proprietary Version of Phase Iva Wind Tunnel Testing for Westinghouse AP600 Reactor. Proprietary Version of Rept Withheld (Ref 10CFR2.790) + (15:44:15, 16 December 2024)
- ML20069H680 + (15:44:16, 16 December 2024)
- ML20069H672 + (15:44:18, 16 December 2024)
- ML20069H665 + (15:44:19, 16 December 2024)
- ML20069H670 + (15:44:19, 16 December 2024)
- ML20069H660 + (15:44:20, 16 December 2024)
- 05000325/LER-1982-100-01, /01T-0:on 821001,determined That Tailpipe for Safety Relief Valve F013H Could Fail During Seismic Event. Addl Analysis Not Performed.Addl Support (PS-6647) Added Where Tailpipe Passes Through Deflector Plate + (15:44:21, 16 December 2024)
- ML20069H658 + (15:44:22, 16 December 2024)
- ML20069H651 + (15:44:23, 16 December 2024)
- ML20069H656 + (15:44:23, 16 December 2024)
- ML20069H650 + (15:44:24, 16 December 2024)
- ML20069H647 + (15:44:24, 16 December 2024)
- ML20069H644 + (15:44:25, 16 December 2024)
- ML20069H645 + (15:44:25, 16 December 2024)
- ML20069H643 + (15:44:26, 16 December 2024)
- 05000336/LER-1994-010, :on 940513,actuation Resulted in Starting of Facility II Charging Pump,Both Boric Acid Pumps.Caused by Spurious Actuation of DG Load Sequencer.Signal Noise Spikes Will Be Added to Quenched W/Stunting Resistor + (15:44:28, 16 December 2024)
- ML20069H641 + (15:44:29, 16 December 2024)
- 05000325/LER-1982-100, Forwards LER 82-100/01T-0 + (15:44:30, 16 December 2024)
- ML20069H637 + (15:44:30, 16 December 2024)
- ML20069H631 + (15:44:31, 16 December 2024)
- ML20069H630 + (15:44:31, 16 December 2024)
- ML20069H628 + (15:44:32, 16 December 2024)
- ML20069H623 + (15:44:33, 16 December 2024)
- ML20069H626 + (15:44:33, 16 December 2024)
- ML20069H622 + (15:44:34, 16 December 2024)
- ML20069H620 + (15:44:34, 16 December 2024)
- ML20069H619 + (15:44:38, 16 December 2024)
- ML20069H613 + (15:44:39, 16 December 2024)
- ML20069H618 + (15:44:39, 16 December 2024)
- ML20069H607 + (15:44:40, 16 December 2024)
- ML20069H605 + (15:44:41, 16 December 2024)