Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069K761 + (15:33:26, 16 December 2024)
- ML20069K758 + (15:33:27, 16 December 2024)
- ML20069K756 + (15:33:28, 16 December 2024)
- 05000254/LER-1983-013, Forwards LER 83-013/03L-0 + (15:33:29, 16 December 2024)
- ML20069K754 + (15:33:29, 16 December 2024)
- 05000302/LER-1983-015, Forwards LER 83-015/03L-0 + (15:33:30, 16 December 2024)
- ML20069K737 + (15:33:30, 16 December 2024)
- 05000335/LER-1983-017-03, /03L-0:on 830320 & 22,mechanical Interlock on Personnel Hatch to Containment Bldg Defeated,Resulting in Both Inner & Outer Doors Being Left Open.Interlock Defeated to Release Personnel Trapped in Hatch + (15:33:32, 16 December 2024)
- ML20069K714 + (15:33:33, 16 December 2024)
- ML20069K724 + (15:33:33, 16 December 2024)
- 05000335/LER-1983-017, Forwards LER 83-017/03L-0 + (15:33:34, 16 December 2024)
- ML20069K708 + (15:33:34, 16 December 2024)
- ML20069K705 + (15:33:37, 16 December 2024)
- ML20069K702 + (15:33:38, 16 December 2024)
- 05000296/LER-1983-022-03, /03L-0:on 830321,during Routine Testing,Primary Containment Isolation Valve 3-FCV-77-2A Failed to Close. Caused by Oil Accumulation on Solenoid Valve Shaft, Preventing Air leak-off.Replacement Planned W/New Design + (15:33:40, 16 December 2024)
- AECM-83-0245, Final Deficiency Rept PRD-83/02 Re Possible Defect W/Liberty Control Co Telephone Relays Used in GE Protective Relays. Initially Reported on 830217.Relays Will Be Replaced. Item Not Reportable Per 10CFR50.55(e) + (15:33:41, 16 December 2024)
- ML20069K696 + (15:33:41, 16 December 2024)
- ML20069K689 + (15:33:42, 16 December 2024)
- ML20069K692 + (15:33:42, 16 December 2024)
- 05000336/LER-1994-014-01, :on 940510,discovered Overstressed Condition in Commom Discharge Line from Vital DC Switchgear Room Coolers, Due to Missing Pipe Support.Installed Missing Support + (15:33:44, 16 December 2024)
- 2CAN038312, Responds to Re QA for Threaded Fasteners.Review of Relationship,Procurement & Application of Threaded Fastener Lubricants & Injection Sealant Compounds,Per IE Bulletin 82-02,will Be Completed by 830415 + (15:33:45, 16 December 2024)
- ML20069K684 + (15:33:46, 16 December 2024)
- ML20069K681 + (15:33:47, 16 December 2024)
- ML20069K678 + (15:33:48, 16 December 2024)
- ML20069K674 + (15:33:48, 16 December 2024)
- 05000296/LER-1983-022, Forwards LER 83-022/03L-0 + (15:33:49, 16 December 2024)
- ML20069K668 + (15:33:50, 16 December 2024)
- 2CAN038313, Forwards Notarized Statement of Affirmation,Inadvertently Omitted from Re QA Measures for Threaded Fasteners + (15:33:51, 16 December 2024)
- ML20069K665 + (15:33:51, 16 December 2024)
- ML20069K657 + (15:33:52, 16 December 2024)
- ML20069K663 + (15:33:52, 16 December 2024)
- ML20069K656 + (15:33:53, 16 December 2024)
- ML20069K652 + (15:33:53, 16 December 2024)
- ML20069K644 + (15:33:55, 16 December 2024)
- ML20069K646 + (15:33:55, 16 December 2024)
- 05000336/LER-1994-013-01, :on 940510,discovered That TS Surveillance Had Not Been Performed within Required Time Level Due to Personnel Error,Supervisory Methods & Work Organization & Planning.Performed Missed Surveillance + (15:33:57, 16 December 2024)
- ML20069K641 + (15:33:58, 16 December 2024)
- ML20069K639 + (15:33:59, 16 December 2024)
- L-94-155, Forwards Rept Describing Rev 40 to Physical Security Plan & PSLPSP-R40-03 Through PSLPSP-R40-06.Encl Withheld + (15:34:02, 16 December 2024)
- ML20069K629 + (15:34:02, 16 December 2024)
- ML20069K626 + (15:34:03, 16 December 2024)
- JAFP-94-0301, Monthly Operating Rept for May 1994 for Ja FitzPatrick Nuclear Power Plant + (15:34:03, 16 December 2024)
- ML20069K621 + (15:34:04, 16 December 2024)
- ML20069K622 + (15:34:04, 16 December 2024)
- ML20069K620 + (15:34:05, 16 December 2024)
- NRC-94-4159, Forwards Proprietary PCS-T2R-029, Quick Look Rept for Large Scale Pccs Tests 224.1 & 224.2,AP600 Program. Rept Summarizes Test Conditions & Measured Data for Tests 224.1 & 224.2.Rept Withheld (Ref 10CFR2.790) + (15:34:06, 16 December 2024)
- ML20069K613 + (15:34:07, 16 December 2024)
- ML20069K617 + (15:34:07, 16 December 2024)
- 3F0694-08, Informs That Babcock & Wilcox Rv Working Group Utils Are Responding Generically to Rv Materials Info Request + (15:34:08, 16 December 2024)
- LD-83-034, Forwards Revised Long-Term Iodine Control in Reactor Containment Bldgs Using C-E Iodine Removal Sys, Per 830323 Meeting Commitment to Revise CESSAR-F SER Confirmatory Item 12 + (15:34:08, 16 December 2024)
- ML20069K606 + (15:34:09, 16 December 2024)