Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000369/LER-1983-024-03, /03L-0:on 830426,Fire Door 1000B Declared Inoperable When Damage,Consisting of Bent Door,Broken Hinge, Bent Hinge,Broken Door Lock & Broken Door Closer Discovered. Cause Unknown.Fire Watch Established + (10:56:54, 15 December 2024)
- ML20071Q545 + (10:56:55, 15 December 2024)
- ML20071Q548 + (10:56:55, 15 December 2024)
- ML20071Q539 + (10:56:56, 15 December 2024)
- ML20071Q534 + (10:56:57, 15 December 2024)
- 05000338/LER-1983-017-03, /03L-0:on 830516,while in Mode 1,individual Rod Position Indication for Control Bank B Rod D-10 Deviated from Group Demand Position.Caused by Detector & Signal Conditioning Card Drift + (10:56:58, 15 December 2024)
- BSEP-83-1669, Ro:On 830426,fire Barrier Limiting Condition for Operation Initiated for Augmented Offgas Bldg Door.Mod Time Frame Exceeded 7-day Specified Period.Fire Watches Will Remain in Effect + (10:56:59, 15 December 2024)
- AECM-83-0310, RO 83-040/0:on 830424,listed Fire Rated Penetrations Opened to Implement Design Change Packages.Hourly Fire Watches Established & Will Be Maintained.Work Tasks Expected to Be Completed by 830701 + (10:57:00, 15 December 2024)
- L-82-551, Responds to Generic Ltr 82-16 Re Tech Specs for NUREG-0737 Items.Existing Tech Specs Adequately Cover Anticipatory Reactor Trip on Turbine Trip + (10:57:00, 15 December 2024)
- 05000316/LER-1982-096-01, /01T-0:on 821201,west Centrifugal Charging Pump Rendered Inoperable by Incorrect Cut on Mini Flow Line from Pump.Caused by Poor Communication Between Plant & Contractor.Cut Locations Will Be Verified Prior to Work + (10:57:02, 15 December 2024)
- L-82-552, Application to Amend App a to License DPR-67 in Response to NRC Re Addl Tech Spec Fire Protection Items.No Amend Fee Required Per + (10:57:03, 15 December 2024)
- NRC-94-4252, Forwards Results of Analysis Using Listed Two 2D Sassi AP600 Models,Per NRC Request Made in Westinghouse/Nrc/Bechtel 940531 & 0601 & 02 Meetings + (10:57:03, 15 December 2024)
- 05000316/LER-1982-096, Forwards LER 82-096/01T-0 + (10:57:04, 15 December 2024)
- ML20071Q514 + (10:57:04, 15 December 2024)
- NRC-94-4251, Confirms That Independent Review of AP600 Basemat Analyses Will Be Performed & Identifies Scope of Review,Per Commitment Made During Closeout of NRC Audit of Structural Calculations Wk of 940711 + (10:57:05, 15 December 2024)
- ML20071Q505 + (10:57:06, 15 December 2024)
- ML20071Q502 + (10:57:06, 15 December 2024)
- 05000423/LER-1994-009-02, :on 940705,identified Unreliable Control Rod Position Indications.Caused by Failed Instrument Card in Drpi System.Failed Card Was Replaced & Surveillances Were Performed to Ensure System Was Fully Operable + (10:57:07, 15 December 2024)
- ML20071Q485 + (10:57:08, 15 December 2024)
- ML20071Q483 + (10:57:09, 15 December 2024)
- BSEP-94-0285, Submits Results of Insp Re Core Spray Spargers & Associated Piping,Per IE Bulletin 80-13 + (10:57:10, 15 December 2024)
- ML20071Q468 + (10:57:16, 15 December 2024)
- ML20071Q459 + (10:57:17, 15 December 2024)
- ML20071Q456 + (10:57:17, 15 December 2024)
- ML20071Q452 + (10:57:21, 15 December 2024)
- 05000334/LER-1982-054-04, /04L-0:on 820923,continuous Chlorination of Circulating Water Sys Occurred Over 7-h Period.Highest Free Chlorine Residual Measured 0.45 Mg/L.Caused by Personnel Error.Sys Given to Chemistry Group & Will Be Automated + (10:57:23, 15 December 2024)
- ML20071Q445 + (10:57:24, 15 December 2024)
- 05000334/LER-1982-054, Forwards LER 82-054/04L-0 + (10:57:25, 15 December 2024)
- ML20071Q442 + (10:57:25, 15 December 2024)
- ML20071Q437 + (10:57:26, 15 December 2024)
- ML20071Q434 + (10:57:27, 15 December 2024)
- TXX-3677, Interim Deficiency Rept Re New Fuel Storage Rack Support Anchors Installed W/O Proper Authorization.Initially Reported on 830407.Approved Anchoring Design Implemented. No Evidence That Deficiency Is Generic + (10:57:27, 15 December 2024)
- 05000370/LER-1983-010-03, /03L-0:on 830427,data Gathering Panels 7 & 23 Would Not Respond to Fire Detection Sys Processor.Caused by Water in Bottom of Panel 23 & W1020A Encl.Water Removed & Boards in W1020A Encl Replaced + (10:57:30, 15 December 2024)
- RBG-15-165, Final Deficiency Rept DR-60 Re Design of Nonseismic Pipe Sys Over Category 1 Components in Control Bldg.Initially Reported on 820615.S&W Improved Basic Program for Meeting Requirements of Reg Guide 1.29 + (10:57:31, 15 December 2024)
- 05000249/LER-1982-048, Forwards LER 82-048/03L-0 + (10:57:32, 15 December 2024)
- ML20071Q403 + (10:57:32, 15 December 2024)
- ML20071Q391 + (10:57:33, 15 December 2024)
- ML20071Q389 + (10:57:34, 15 December 2024)
- ML20071Q390 + (10:57:34, 15 December 2024)
- ML20071Q387 + (10:57:35, 15 December 2024)
- ML20071Q383 + (10:57:37, 15 December 2024)
- NRC-94-4220, Forwards Rev 0 to LTCT-T2R-002, AP600 Long Term Cooling Quick Look Rept for Flow Test/Line Resistance Determination. Rept Withheld (Ref 10CFR2.790) + (10:57:38, 15 December 2024)
- ML20071Q376 + (10:57:39, 15 December 2024)
- ML20071Q375 + (10:57:39, 15 December 2024)
- 05000266/LER-1982-026, Forwards LER 82-026/01T-0 + (10:57:40, 15 December 2024)
- ML20071Q368 + (10:57:40, 15 December 2024)
- ML20071Q366 + (10:57:42, 15 December 2024)
- ML20071Q363 + (10:57:43, 15 December 2024)
- ML20071Q361 + (10:57:43, 15 December 2024)
- ML20071Q360 + (10:57:44, 15 December 2024)
- ML20071Q355 + (10:57:45, 15 December 2024)