Interim Deficiency Rept Re Lack of Insp Records for Nelson Studs.Small Base Metal Defect in Embed Plate Discovered. Random Studs Will Receive Test Loading Which Will Exceed Aws D1.1 Requirements.Nrc Approval for Testing Anticipated
ML20071Q456
Person / Time
Site: Zimmer
Issue date: 12/21/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-2177, NUDOCS 8212290342
Download: ML20071Q456 (2)


Text

_ _ _ _ _ _ _

a. h

,ar+M Jh~

y THE CINCINNATI GAS & ELECTRIC COMPANY W

2----

~

CINCINNATI.OHtO 45200 December 21, 1982 QA-2177 E. A. BORGMANN semon vict PatsIDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) - ITEM E LACK OF INSPECTION RECORDS FOR NELSON STUDS, DOCKET NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88 W.O. #57300 JOB E-5590 FILE NO. IRC-7, E-29 Gentlemen:

This letter constitutes an interim report concerning the sub-ject condition, initially reported to the Commission as a potentially reportable deficiency under 10CFR50.55(e).

Our previous report, QA-2083, dated October 28, 1982, stated that during a review of site documentation, it was discovered that inspection records of Nelson Stud installations for cable tray hangers could not be located, though a program for inspection had existed. In addition, during a field inspection, it was discovered that a small base metal defect existed in the embed plate as a result of the installation of a template used to assure proper stud alignment and configuration.

CG&E's Nuclear Engineering and Quality Assurance Departments have completed an investigation to determine the methods required to con-firm the structural adequacy of the installed cable tray supports.

This plan is outlined below.

A random sample of installed Nelson Studs will be selected, using a site approved sampling procedure, to receive test loading which will exceed the acceptance requirements of A.S Dl.l.

Failure of any stud during testing will result in the evaluation of the diminished load carrying ability of the hanger. Rework or repair, should it be re-quired, will be in accordance with approved site procedures.

i l

D i?

0212290342 821221

'DEC 2 7 198L PDR ADOCK 05000358 S

PDR

_J

L, a

Os Mr. J. G. Keppler Region III December 21, 1982 - QA-2177 l

Page 2 Exposed base plates or beams to which the Nelson Studs and tray supports were connected will be examined to determine the worst case base metal defect. A worst case defect will be assumed to be the defect size for all base plates and beams and will be used to determine the acceptability of such base metal defects.

t In addition,.1 review of past NRC inspection reports has identified that NRC inspection personnel found the Nelson Stud installation and inspection program acceptable. Those NRC I.E.

reports revealed no nonconformances or items of noncompliance were issued as a result of past NRC inspections over the period j

from 1976 through 1980.

It is anticipated that our proposed plan will be finalized and NRC approval to commence testing of randomly selected Nelson -

Studs can be obtained by January 31, 1983. A request for approval to perform this testing will be made by this date in accordance with the method established for performing work under the NRC Show Cause Order and Order Immediately Suspending Construction.

We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY r b E A.BwAngo By (beb D-hD E. A. BORGMANN SENIOR VICE PRESIDENT MAP:as cc:

NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector Attn:

W. F.Christianson Zimmer Project Engineer Region III "f

,g