ML20071Q442
| ML20071Q442 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/01/1983 |
| From: | Parsons R CAROLINA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| CON-NRC-83 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8306090046 | |
| Download: ML20071Q442 (1) | |
Text
CP&L Carolina Power & Light Company P. O. Box 101, New Hill, N. C.
27562 June 1, 1983
-4C c-m S
c-cp Mr. James P. O'Reilly NRC-83 Qo
~
United States Nuclear Regulatory Commission crs fy Region II gS l
tu h' 101 Marietta Street, Northwest (Suite 3100)
Atlanta, Georgia 30303 k foO of to-40) p o..
CAROLINA POWER & LIGHT COMPANY 5"
3 SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNITS 1 & 2 UNVERIFIED ANCHOR BOLT MATERIAL TYPE - ITEM 131
Dear Mr. O'Reilly:
On May 3, 1983, Mr. N. J. Chiangi notified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(e). The NRC was informed that verification of anchor bolt material type was not being performed when tags were lost. A dimensional check only was being per-formed.
Since several different ASTM grades of anchor bolts were being installed, and some of these were dimensionally identical, all anchor bolts were suspect.
Our investigation has reduced the number of suspect anchor bolts to approximately 250. These anchor bolts are currently being evaluated by engineering and this evaluation is expected to be complete by August.
For this reason, we request an extension until August 5, 1983 for submitting a report on the reportability of this item.
Thank you for your consideration in this matter.
Yours very truly, g
ef:w n ^
R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/sh cc:
Mr. G. Maxwell (NRC-SHNPP)
Mr. R. Prevatte (NRC-SHNPP)
Mr. V. Stello (NRC)
OFFICIAL COPY h$$
0
~
p 21 s
//0