THE CINCINNATI GAS & ELECTRIC COMPANY sIE ZIMMER NUCLEAR POWER STATION P.O. BOX 201 MOSCOW OH 45153 CINCIN N ATI, OHIO 452of December 20, 1982 QA-2175 E. A. 8 0RG M AN N stNIOR VICE PRESIDENT U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e) 'M-71 WORK PACKAGE CONTROL REPORT RETRACTION, DOCKET No. 50-358, CONSTRUCTION PERMIT NO. CPPR-88 WO 57300 JOB E-5590 FILE NRC-8 M-71 Gentlemen:

This letter constitutes a follow-up to the December 20, 1982 telephone con-versation between Mr. E. R. Schweibinz of the NRC and Mr. F. K. Pfeifer of CC&E concerning the subject condition, initially reported to the Commissica on November 26, 1982 as a potentially reportable deficiency under 10CFR50.55(e).

In the December 20, 1982 telephone conversation, Mr. Schweibinz was advised that additional review of the condition has determined that it is not reportable under 10CFR50.55(e).

Additional information to support this conclusion is available for NRC re-view in the CG&E Quality Assurance Department.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY 9/1 b E. A.8cez,mpad By P

~

E. A. BORGMANN SENIOR VICE PRESIDENT FKP:plc cc: NRC Office of Inspection & Enforcement Washington, D.C. 20555 NRC Senior Resident Inspector Attn:

W. F. Christianson Zimmer Project Inspector Region III gg,C 41 gL p%

8212290364 821220 gDRADOCK05000

, _,